power system of turkey
Download
Skip this Video
Download Presentation
POWER SYSTEM OF TURKEY

Loading in 2 Seconds...

play fullscreen
1 / 23

POWER SYSTEM OF TURKEY - PowerPoint PPT Presentation


  • 282 Views
  • Uploaded on

POWER SYSTEM OF TURKEY. Turkish Electricity Transmission Corporation(TEIAS). 400 kV Network. BULGAR İSTAN. KARADENİZ. DIMODICHEV. HABİPLER. BATUM. GÜRCİSTAN. BABAESKİ. HAMİTABAT. ALİBEYKÖY. AHALTSIKHE. SAMSUN DGKÇ BORASCO. İKİTELLİ. A.ALANI. BOYABAT. ALTINKAYA. AMASRA. HOPA.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' POWER SYSTEM OF TURKEY' - rianne


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
power system of turkey

POWER SYSTEM OF TURKEY

Turkish Electricity Transmission

Corporation(TEIAS)

slide2

400 kV Network

BULGARİSTAN

KARADENİZ

DIMODICHEV

HABİPLER

BATUM

GÜRCİSTAN

BABAESKİ

HAMİTABAT

ALİBEYKÖY

AHALTSIKHE

SAMSUN DGKÇ

BORASCO

İKİTELLİ

A.ALANI

BOYABAT

ALTINKAYA

AMASRA

HOPA

Y.TEPE

YUNANİSTAN

D.PAŞA

BEYKOZ

FILIPPI

KAPTAN

PAŞAKÖY

BORÇKA

EREĞLİ

Z.KÖY

ÇARŞAMBA

GUMRI

OSMANCA

AMBARLI

ÇANKIRI

UNIMAR

DERİNER

ÜMRANİYE

ADA-GEBZE

TEPEÖREN

İÇDAŞ

ARKUN

ERMENİSTAN

KARS

YUSUFELİ

KARABİGA

ADAPAZARI

KALKANDERE

TİREBOLU

BAĞLUM

ÇAYIRHAN

H.UĞURLU

KAYABAŞI

ORDU-2

İSPİR

SİNCAN

GÖKÇEKAYA

IĞDIR

İÇDAŞ

K.KALE DGKÇ

BURSA

AKINCI

GÖLBAŞI

AĞRI

BALIKESİR

ÇAN

TEMELLİ

KARGI

SİVASDEÇEKO

TUNÇBİLEK

BABEK

İÇANADOLU DGKÇ

HORASAN

KANGAL

ÖZLÜCE

SOMA

D.BEYAZIT

SEYİTÖMER

ERZURUM

KAYSERİ

GÜRSÖĞÜT

BAZARGAN

VAN

KEBAN

KOCATEPE

KHOY

ELBİSTAN

ALİAĞA

TATVAN

İRAN

DENİZLİ DGKÇS

KARAKAYA

MANİSA

YEŞİLHİSAR

ÇETİN

DİYARBAKIR

KONYA

HİLVAN

IŞIKLAR

BATMAN

UZUNDERE

YEDİGÖZE

PERVARİ

ATATÜRK

ILISU

AYDIN

ANDIRIN

KAVŞAK

SEYDİŞEHİR

DENİZLİ

SİLOPİ TES

PS3

YENİKÖY

G.ANTEP

Ş.URFA

YATAĞAN

ADANA

CİZRE

OYMAPINAR

ZAKHO

BİRECİK

KIZILTEPE

ERZİN

KEMERKÖY

ERMENEK

KAYRAKTEPE

KESEK

IRAK

MERSİN

AKSA

VARSAK

İSDEMİR

İSKENDERUN

MUSUL

TEİAŞ-APK 2008

TS (PLANLANAN)

HATAY

HALEP

TS (MEVCUT)

HES (PLANLANAN)

AKDENİZ

SURİYE

HES (MEVCUT)

TL (MEVCUT)

TL (PLANLANAN)

220 kV EİH

154 kV EİH

profile of system
Profile of System

NUMBER OF SUBSTATIONS:

400 kV 75

154 kV 496

66 kV 15

TOTAL 586

INSTALLED CAPACITY (92.199 MVA)

LENGTH OF TRANSMISSION LINES (km):

400 kV 14,453

154 kV 31,716

220 kV 84

66 kV 508

154 kV Cable 200

380 kV Cable 22,8

TOTAL46,974

slide4

Generation & Demand (At the end of 2009)

  • Installed Capacity 44.782 MW
  • Hydro+Renewable 34.4 %
  • Thermal 65.5 %
  • Annual Consumption 193.3 TWh
  • Peak Demand 29.870 MW
peak load and electricity consumption 1999 2018
Peak Load and Electricity Consumption 1999-2018

http://www.teias.gov.tr/projeksiyon/KAPASITEPROJEKSIYONU2009.pdf

expected generation demand between 2009 and 2018
Expected Generation & Demand (between 2009 and 2018)

In the Generation Capacity Projection study covering between years 2009 and 2018,

  • Peak Demand 55,053 MW (high scenario)

51,757 MW (low scenario)

  • Installed Capacity 56,382 MW (high scenario)

54,240 MW (low scenario)

The projection study results show that the possible back up ratio of the installed capacity is %45.4 for 2009 and %2.4 for 2018. After 2015 new generation additions are needed.

demand forecast high demand
Demand Forecast (High Demand)

Demand values are gross values. Transmission and Distribution losses, internal consumptions of plants and power theft are included in this gross demand. Further, embedded generation (connected to the distribution system) and the generation of plants which are not subject to Load Dispatching instructions are included too.

new generation applications
New Generation Applications
  • Hydro PP’s 26000MW
  • Thermal and NG PP’s 35000 MW
  • Nuclear PP’s 4800 MW (under consideration)
    • 2400 MW will be in operation in the period of 2017-2018
power plants with high installed capacities to be commissioned in 4 5 years
Power Plants with High Installed Capacities to be Commissioned in 4-5 Years

Bandırma

Natural Gas CCPP

1000 MW

Under Construction

Operation Year:2010

EREN TPP

1200 MW

Under Construction

Operation Year:

2011

DERINER HPP 630MW IN 2012

Borasco

Natural Gas CCPP

850 MW

Operation

Year:2011

ICDAS

TPP

600 MW

Under Construction

Operation Year:2011

DENIZLI NGCCPP: 890 MW 2014

EGEMER NGCCPP 890 MW IN 2012

AYAS TPP: 660 MW 2012

slide14

New Nuclear Power Plant Project

  • Turkey’s first nuclear power plant will be built, owned and operated by Russia after the two countries signed an agreement in May 2010.
  • The four 1200 MW VVER units at the Akkuyu site on Turkey\'s Mediterranean coast and the plant will be built, operated and middle financed through a Russian project company.
  • Russian state nuclear company Rosatom has been given until mid-August to create the subsidiary, which will initially be 100% Russian-owned.
  • In the longer term, Russia may sell up to 49% of the company to other investors from Turkey and elsewhere, but will retain the 51% controlling stake.
slide15

Konya S/S

The 380 kV grid map of the region that Nuclear PP will be constructed:

Ereğli S/S

Seydisehir S/S

Varsak S/S

Adana S/S

Oymapınar HPP 540MW

Mersin S/S

Aksa TPP 750MW

Kayraktepe HPP 300MW

Sugozu TPP 1300MW

Ermenek HPP 300MW

PLACE of AKKUYU PLANT

recent situation for wind generation in turkey
Recent Situation for Wind Generation in Turkey
  • 4916 MW evaluated by TEIAS in respect of connection to PS
  • 3274 MW of these applications has been licensed by EMRA
  • 911 MW is in Operation
  • 525 MW is Underconstruction
  • The amount of the available wind generation capacity can be connected to the system until 2013 is 12000 MW
  • Wind Power interconnection studies currently in process 8474 MW(number of 722)
slide19

349 MW

703 MW

1046 MW

835 MW

1595 MW

618 MW

The evaluated Wind Generation Capacity on the regional base and will be connected to the system with the view of TEIAS
slide20

The law (no:5346) for the “Utilization of Renewable Energy Sources for the Purpose of Generating Electricity” issued in 2005.

The Grid Code for the Wind Power Plants has been prepared by TEIAS and approved by EMRA.

Wind Enery Potential Atlas is

ready (http://repa.eie.gov.tr)

incentives for renewable power plants
INCENTIVES FOR RENEWABLE POWER PLANTS
  • Distribution Companies have to buy energy from RES (proportional with the total consumption)
  • 10 years purchase warranty
  • Minimum 5.5 € cent/kWh
  • Incentives are valid for power plants
    • are/shall be in operation till 31/12/2011
    • Not older than 10 years
entso e synchronisation of turkey
ENTSO-E SYNCHRONISATION of TURKEY

Trial parallel operation of Turkish TSO TEIAS planned to start in September 2010

http://www.entsoe.eu/

ad