1 / 13

SRC Weekly Meeting June 26, 2012

SRC Weekly Meeting June 26, 2012. Revisit Optics for LHRS,. LEFT Optics. Re-Calibration of phi. Sieve X & Y Reconstruction  Recalibration of Φ is needed.

rhea-tyson
Download Presentation

SRC Weekly Meeting June 26, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SRC Weekly MeetingJune 26, 2012 Revisit Optics forLHRS,

  2. LEFT Optics Re-Calibration of phi

  3. Sieve X & Y Reconstruction  Recalibration of Φ is needed

  4. With scale Effect on the vertex Z, the change is made to target_Y calculation. This effect only the phi variable as the Sieve Y defined as: • Ysieve = L*phitg + Ytg Sieve X Y before calibration

  5. BEFORE Note: offset in Sieve Y is to the right of the red lines

  6. Sieve X Y, per foilbefore calibration Run 1238 C12- 13foils At 16.5 degree

  7. Run 1238 C12- 13foils At 16.5 degree Sieve In Sieve X Y after calibration

  8. Sieve X Y, per foilafter calibration Run 1238 C12- 13foils At 16.5 degree

  9. Dp scan on Hydrogen

  10. Hydrogen scan. Redline is the momentum setting of the Dipole.

  11. Hydrogen scan. Redline is the momentum setting of the Dipole. Focus on the run 1229, 1231, and 1243 where we have full acceptance, the ideal-mean is approximately the same

  12. Left HRS optics summary Phi & Theta • Vertex • Phi • Theta • Momentum (half done) vertex

More Related