1 / 25

SOLAR ROOFTOP PROGRAM

SOLAR ROOFTOP PROGRAM. Sri. S A Satish K umar . B.E. M.I.E. GM.Rtd . BESCOM , Bangalore Mobile : 9743767732 E-mail : satish1982.power @ gmail.com @ ITC WINDSOR on 13/10/17. The use of solar energy has not been opened up because the oil industry does not own the sun. Ralph Nader.

repp
Download Presentation

SOLAR ROOFTOP PROGRAM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SOLAR ROOFTOP PROGRAM Sri. S A Satish Kumar. B.E. M.I.E. GM.Rtd. BESCOM, Bangalore Mobile : 9743767732 E-mail: satish1982.power @gmail.com @ ITC WINDSOR on 13/10/17.

  2. The use of solar energy has not been opened up because the oil industry does not own the sun.Ralph Nader

  3. Preamble • Launching of JNNSM in January 2010, opened flood gates for solar sector. • State is blessed with … 240 -300 sunny days. • Solar Radiation …. 5.4 – 6.2 kwh/mts/day. • Solar potential …. 20GWp. • Moderate potential … 10GW. • State Target ……. 3% of E.C. • Revised RPO ….. 8% of E.C.

  4. STATE TARGETS LAUNCHING TARGET REVISED (AS PER NATIONAL SOLAR MISSION)

  5. IMPORTANT Ordersby KERC/GOK 10/10/13 - Tariff orders for SRTPV plants. 22/05/14– GOK Solar policy 14-18. 07/11/14 –Launch of SRTPV scheme in the State. 30/7/15 - Revised Tariff for MW scale solar project 2/05/16 – Revision of tariff and other norms. 19/09/16 –One time Irrevocable policy of Gross/Net Metering. 15/12/16 – SRTPV Plants Regulations -2016. 15/09/17– Multiple SRTPV installations in a single premises.

  6. Extract of KERC orders

  7. KERC Regulation -2016Dated 15/12/16. Allow Gross/Net Metering Arrangement. All consumers permitted to install SRTPV from 1Kw to 1Mw. Cap to be decided by commission from time to time. Cum. Cap. of SRTPV – shall not exceed Total Cap. of state. Time Limitation – 180 days for commission of Plant. < 50 Kwp. - Connect to existing DTC, limited to 80% of cap. >50 Kwp.– Connect to existing 11Kv. Network, limited to 80% of rated current cap. of conductor. Adhere to technical standards and safety. Metering System – As per CEA Guidelines.

  8. Inter Connectionwith distribution system

  9. BESCOM JOURNERY TOWARDS SOLAR RTPV PROGRAM

  10. STATUS as on 30/9/17

  11. On-line Applications invited from all the consumers of BESCOM • SRTPV capacity is from 1 kW to 1 MW • Applicant can select any System integrator or PV module • Mandatory use of BESCOM empaneled Grid Tied Inverter & Bi-directional meter

  12. THE SRTPV APPLICATION FORMAT, PROCEDURES, FAQ, GUIDELINES TO CONSUMERS & BESCOM OFFICERS, OTHER RELATED FORMATS PREPARED BY BESCOM EXPERT COMMITTEE AND HOSTED IN BESCOM WEBSITE WWW.BESCOM.ORG

  13. FORMATION OF TECHNICAL & PROCESS COMMITTEE EMINENT EXPERTS DRAWN FROM USAID, CPRI, GERMI, UL, TO SIMPLIFY THE PROCESS AND TO MAKE HURDLE FREE GATEWAY

  14. Major decision taken in the committee are: • Inspectorate approval exempted for SRTPV installation less than 10kW • Empowered AE to Commission SRTPV installations less than 5 KWp. • For HT installations interconnection point permitted at LT Bus Bar. • Reduction in technical loss and saving to consumer as cost of step-up DTC and infrastructure is avoided. • Penetration limit of SRTPV up to 80% of the Distribution Transformer capacity.

  15. ----- Contd.----- Hand holding of GOVT departments for preparation of tender documents. Technical specifications and PQR hosted in BESCOM website as ready reckoner. Installation of SRTPV on all BESCOM owned office buildings under IPDS Scheme. 3rd party investment or rent a roof concept. SRTPV Dash Board to know solar generation.

  16. Tender Status

  17. Empanelment of Manufacturers of: Grid tied Inverters Bi-directional meters Make : Secure & genus ABB, SMA DELTA, Fronius, Studeretc Empanlement of facilitators Mitcon, ORB, Sterling, Genus, Greenfueletc

  18. Empanelment of Hybrid Inverter : • With battery backup for assuring 24 * 7 hrs P/S – Studer make

  19. Hybrid system : • Solar + small wind mill system proposed for Govt buildings • Combination of Hybrid & grid tied inverter for assuring uninterrupted P/S in Rural areas Machohalli school

  20. SURYA RAITHA SOLAR PUMP - PILOT PROJECT : • Introduced on 24.9.2014 for welfare of farmers. • To harness energy from solar to run IP sets and feed in excess energy to grid. • Assured quality power supply to farmers during day time. • Assured additional income to farmers. • Improvement in water table. • Reduction in peak load, losses and energy consumption. • Execution of TPA between BESCOM, SRTPV consumer and investor / developer.

  21. Formation of SOLAR HELP DESK at Corporate office BESCOM • In-house training to BESCOM officers

  22. COMMISSIONED INSTALLATIONS • Karnataka state cricket association - 400kW • BESCOM Corporate office – 50kW • Residential house at kengari– 5 kW • Residential house at J P nagar – 1.8 k W

  23. Facilitating in commissioning of 100kWp SRTPV plant by TERI under HAL - CSR initiative to educations institutions;

  24. New Innovative Technologies • Micro inverters • Tracking system • Composite panels which generate electricity and hot water • Pyramid / Concentrated panels • Battery storage system

  25. THANK YOU