September 11, 2013 |
This presentation is the property of its rightful owner.
Sponsored Links
1 / 15

September 11, 2013 | NEPOOL markets committee PowerPoint PPT Presentation


  • 53 Views
  • Uploaded on
  • Presentation posted in: General

September 11, 2013 | NEPOOL markets committee. Erin H. O’Brien. Senior Tariff analyst | market development. FCM-Related Projects and Manual 20 Clean-up. Conforming Manual Changes. Background. FCM-Related Projects and Manual 20 Clean-up. Conforming Manual Changes – Background.

Download Presentation

September 11, 2013 | NEPOOL markets committee

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


September 11 2013 nepool markets committee

September 11, 2013 | NEPOOL markets committee

Erin H. O’Brien

Senior Tariff analyst | market development

FCM-Related Projects and Manual 20 Clean-up

Conforming Manual Changes


Background

Background

FCM-Related Projects and Manual 20 Clean-up


Conforming manual changes background

Conforming Manual Changes – Background

  • Bring Manuals 20 and MVDR in line with previous FCM projects:

    • Static De-list Bid Changes

      • After the qualification determination notifications are issued, the ISO will open a seven-day window to allow Market Participants to modify Static De-list Bids.

    • FCM Redesign Changes

      • Offer floor mitigation

      • Elimination of floor price

      • Revised mitigation rules

        • Dynamic De-list Bid threshold

        • Elimination of Pivotal Supplier and Quantity Rule

      • Elimination of “Cost of New Entry” (CONE)


Conforming manual changes background continued

Conforming Manual Changes – Background(continued)

  • Manual 20 clean-up

    • Update use of defined terms consistent with Section I.2.2.

    • Address expiration of Master FCM Schedule included in M-20, Section I

    • General clean-up

      • Incorporate or correct hyperlinks

      • Update or remove outdated practices

      • Make non-substantive grammatical edits


Summary of manual changes

Summary of Manual Changes


Static de list bid conforming manual changes

Static De-List Bid Conforming Manual Changes


Fcm redesign conforming manual changes

FCM Redesign Conforming Manual Changes


Fcm redesign conforming manual changes continued

FCM Redesign Conforming Manual Changes(continued)


Clean up changes

Clean-up Changes


Clean up changes continued

Clean-up Changes(continued)


Clean up changes continued1

Clean-up Changes(continued)


Static de list bid past committee review

Static De-list Bid – Past Committee Review


Fcm redesign past committee review

FCM Redesign – Past Committee Review


  • Login