1 / 11

PPM-LPPM

PPM-LPPM. Pelaksanaan Kegiatan ABDIMAS “HIBAH KIT OR kepada SD SEKITAR KANTOR UPBJJ-UT”. Pondok Cabe, Rabu – Jumat, 16 – 18 Februari 2011. LATAR BELAKANG. LATAR BELAKANG. Tridarma Perguruan Tinggi Implementasi hasil pengembangan IPTEKS Mengembangkan kemampuan masyarakat

reidar
Download Presentation

PPM-LPPM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PPM-LPPM Pelaksanaan Kegiatan ABDIMAS “HIBAH KIT OR kepada SD SEKITAR KANTOR UPBJJ-UT” Pondok Cabe, Rabu – Jumat, 16 – 18 Februari 2011

  2. LATAR BELAKANG LATAR BELAKANG • Tridarma Perguruan Tinggi • Implementasi hasil pengembangan IPTEKS • Mengembangkan kemampuan masyarakat • Fungsi Pengabdian kepada Masyarakat • Renstra UT (2005-2020) • Menyelenggarakan Abdimas skala nasional • Staf menyelenggarakan Abdimas • Hasil Abdimas harus nyata manfaatnya bagi masyarakat sekitar UT maupun UT

  3. TAHAPAN PELAKSANAAN (1)

  4. TAHAPAN PELAKSANAAN (2)

  5. TAHAPAN PELAKSANAAN (3)

  6. TAHAPAN PELAKSANAAN (4)

  7. Lingkup Kegiatan DPA Mengidentifikasi dan menentukan SD penerima Kit Olah Raga. Mengikuti kegiatan VICON ttg. Penjelasan pemanfaatan Kit . Menyerahkan Kit Olah Raga kepada SD yang telah ditentukan sekaligus memberi pengarahan/penjelasan tentang pemanfaatan Kit kepada guru OR di SD ybs. Membuat laporan pelaksanaan kegiatan Abdimas.Slide 3

  8. Jadwal VICON Wilayah Timur: Jayapura, Ternate, Ambon, Menado, Gorontalo, Majene, Palu, Kendari, Makassar, Kupang, Mataram Jumat, 18 Februari 2011, pukul 13.00 WIB s.d selesai Wilayah Tengah: Pontianak, Palangkaraya, Samarinda, Banjarmasin, Denpasar Rabu, 16 Februari 2011, pukul 10.00 WIB s.d selesai Wilayah Barat: Kelompok I: Bandar Lampung, Bengkulu, Pangkal Pinang, Batam, Palembang, Jambi, Pekanbaru, Padang, Medan, Banda Aceh Kamis, 17 Februari 2011, pukul 09.00 WIB s.d selesai Kelompok II : Jember, Malang, Surabaya, Surakarta, Yogyakarta, Semarang, Purwokerto, Bandung, Bogor, Jakarta, Serang Kamis, 17 Februari 2011, pukul 11.00 WIB s.d selesai Slide 4

  9. Format: Instrumen Monitoring dan Evaluasi

  10. Format: Laporan Kegiatan Abdimas Daftar Isi Latar pelakang Tujuan Sasaran Tempat dan Waktu Pelaksanaan Pelaksanaan Monitoring dan Evaluasi Saran dan Kesimpulan Lampiran: (dokumen: daftar hadir dan tanda terima Kit OR; foto dokumentasi: 2 unit Kit OR, gedung dan papan nama SD, guru OR dari SD penerima Kit OR, suasana penyerahan Kit OR, suasana penjelasan DPA kepada guru SD, suasana pemanfaatan Kit OR oleh SD penerima Kit dalam kegiatan monev I dan II). Slide 6

  11. Selamat Bekerja TAHAPAN DAN WAKTU

More Related