An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CBM FEE/DAQ/Trigger Status and Overview Walter F.J. Müller, GSI CBM Collaboration Meeting, October 6-8, 2004

  2. CBM Requirements Profile • D and J/Ψ signal drives the rate capability requirements • D signal drives FEE and DAQ/Trigger requirements • Problem similar to B detection, see BTeV, LHCb • Adopted approach: displaced vertex trigger in first level, like in BTeV • Additional Problem: DC beam → interactions at random times → time stamps with ns precision needed → explicit event association needed • Current design for FEE and DAQ/Trigger: • Self-triggered FEE: All hits shipped with time stamp • Data-push architecture: L1 trigger throughput limited but not latency limited Substantial R&D needed Quitedifferentfrom theusualLHC styleelectronics CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  3. Buffer Conventional FEE-DAQ-Trigger Layout Especially instrumented detectors Detector L0 Trigger fbunch Trigger Primitives Dedicated connections FEE Cave Limited capacity Shack L1 Accept DAQ Modest bandwidth L2 Trigger L1 Trigger Limited L1 trigger latency Specialized trigger hardware Standard hardware Archive CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  4. L1 Trigger L2 Trigger The way out ... use Data Push Architecture Detector Self-triggered front-end Autonomous hit detection fclock FEE No dedicated trigger connectivity All detectors can contribute to L1 Cave High bandwidth Shack DAQ Large buffer depth available System is throughput-limited and not latency-limited Modular design: Few multi-purpose rather many special-purpose modules FPGA andCPU mix CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  5. Typical Self-Triggered Front-End Use sampling ADC on each detector channel running with appropriate clock • Average 10 MHz interaction rate • Not periodic like in collider • On average 100 ns event spacing a: 126 t: 5.6 a: 114 t: 22.2 amplitude Time is determined to a fraction of the sampling period 100 threshold 50 time 0 5 10 15 20 25 30 CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  6. Front-End for Data Push Architecture • Each channel detects autonomously all hits • An absolute time stamp, precise to a fraction of the sampling period, is associated with each hit • All hits are shipped to the next layer (usually concentrators) • Association of hits with events done later using time correlation CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  7. Typical FEE Parameters for CBM • Based on • interaction rate: 107/sec • 1% occupancy for central collisions • minimum bias events have ¼ of central multiplicity • typically 3 detector channels fire per particle hit • a hit can be expressed in 5 bytes • one gets as 'typical' values • channel hit rate: ~ 100 kHz • channel data rate: ~ 500 kB/sec or 5 Mbps • BUT: • in inner (outer) regions rates tend to be generally higher (lower) • ECAL has ~7% cell occupancy → 700 kHz channel hit rate • START (diamond micro strip): some 10 MHz channel hit rate CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  8. Typical FEE Parameters for CBM II plausible channel/chip for Si Strip detector • For a multi-channel FEE one gets: plausible channel/chip for most sub-systems CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  9. Sub-System Specifics • Si-Strip • few ns time resolution • high channel density (50um pitch, strip length few to >100 mm) • material budget essential • radiation hard electronics needed (2 MRad/year at z=40cm) • RICH • current assumption: use PMT's as photon detector • nominal signal amplitude: few 105 e; dark rate: ~ 3 KHz/PMT • dynamic range modest, time resolution few ns CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  10. Sub-System Specifics • TRD • thin Xe absorber (typ. 6 mm), no drift time • pads size and shape changes drastically over R (square -> strip) • type of chamber (wire or a 'fast' type) tbd • RPC • most likely differential detector and differential input stage • time resolution of electronics should be 25 ps or better • ECAL • current assumption: use PMT's as photon detector • nominal signal amplitude to be determined • dynamic range large (12 bit), ns time resolution helpful CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  11. Typical Front-End Electronics Chain preFilter digital Filter Hit Finder Backend & Driver PreAmp ADC • Si Strip • Pad • GEM's • PMT • APD's Anti-AliasingFilter Sample rate: 10-100 MHz Dyn. range: 8...>12 bit 'Shaping' 1/t Tailcancellation Baselinerestorer Hit parameter estimators: Amplitude Time Clustering Buffering Link protocol All potentially in one mixed-signal chip CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  12. Towards a Multi-Purpose FEE Chain digital Filter Hit Finder PreAmp preFilter ADC programmable sampling rate ? programmable hit finder and estimator Several selectable input stages; →pos/neg signals → capacitance match as option: dual rangeconversion ? CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  13. FEE Summary Slide from February 2004Collaboration Meeting • About half of the experiment cost is in FEE • Significant amount of development needed for Data Push FEE Task Force • Mission: • Collect requirement profiles for all sub-system variants • Identify common building blocks (chip or block level) • Formulate overall concept for FEE • Search for collaboration partners outside CBM • Prepare EU D&C proposal by end 2004 • Start R&D on critical building blocks in progress in progress in progress in progress retarget... in 2005 CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  14. First CBM FEE ASIC Meeting 9/26/2004 Follow link CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  15. Conclusion of 1st FEE ASIC Meeting • A multi-purpose FEE chain could handle • RICH • TRD • ECAL • the RPC is dedicated development, but can share buildings blocks (ADC, communication) and technology base • the Si-Strip is dedicated development (channel density, radiation hardness), might share building blocks, and can share technology base CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  16. TP and Workgroup Structure I • Sections of FEE chapter of TP • Overall Architecture • Communication and Time/Clock Architecture • Clock/Time distribution (FETA) (R. Tielert / V. Lindenstruth) • Link protocol (FELA) (U. Bruening / V. Lindenstruth) • OASE (R.Tielert) • CNet (U. Bruening / U. Kebschull) • DCS interface (V. Lindenstruth / U. Bruening) • RICH/TRD/ECAL solution • PreAmp (W. Mueller / R. Tielert) • ADC (R. Tielert / L. Musa) • filtering (W. Mueller / V. Lindenstruth) • feature extraction (V. Lindenstruth / L. Musa / R. Tielert) • backend (FELA) CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  17. TP and Workgroup Structure II • Sections of FEE chapter of TP (cont.) • RPC/START solution • PreAmp/Discriminator (M. Ciobanu / E. Badura) • TAC variant (H. Flemming / E. Badura) • DLL variant (H. Flemming / E. Badura) • Si Strip solution • (E. Atkin / A. Voronin) • MAPS interfacing (/w IReS) • Infrastructure • power distribution (V. Lindenstruth / R. Tielert) • DCS (U. Kebschull / V. Lindenstruth) • Configuration Mgmt, Fault Tolerance (U. Kebschull) CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  18. FEE → DAQ/Trigger • Much of my is time over by now ... • ... and dinner is waiting outside • lets face DAQ/Trigger issues anyway CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  19. The FutureDAQ EU Project (I3HP-JRA1) Follow link 2nd WorkshopSeptember 9, 2004in Darmstadt Follow link 1st WorkshopMarch 25-26, 2004in Munich Follow link CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  20. Regular local (Da/Hd/Ma) DAQ/Trigger Meetings CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI Follow link

  21. Now lets look at the whole System • The following does not explore the full design space • It looks into one scenario, driven by the Ansatz do (almost) all processing done after the build stage • Other scenarios are possible and should be investigated, putting more emphasis on: • do all processing as early as possible • transfer data only then necessary • All specific 'implementations' are just examples for illustration • All stated numbers are still rough estimates CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  22. FEE CNet PNet A Network oriented System View Front-endElectronics ConcentratorNetworks BuildNetwork BNet ProcessorNetworks ComputeResources High LevelNetwork HNet to high level computing CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  23. ... with some numbers ~ 50000FEE chips FEE CNet ~ 1 TB/Sec BW~ 1000 links BNet PNet ~ 100sub farms ~ 100 nodesper sub farm HNet Output BW~ 10 GB/sec to high level computing CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  24. ... with some questions What is theFEE Link Protocol ? FEE Where is thetime distribution ? CNet Interfacing ofCNet to BNet ? BNet Interfacing ofBNet to PNet ? PNet Interfacing ofHNet to PNet ? HNet to high level computing CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  25. FEE CNet Buffer Node atCNet – BNet Interface Buffer Node atBNet – PNet Interface PNet Processor Node atPNet – HNet Interface ... and now decoupling the Networks BNet HNet to high level computing CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  26. FEE CNet PNet Add Time Distribution → 5 Networks TNet BNet TNetInterface Connect toBNet or a PNet HNet to high level computing CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  27. FEE CNet PNet Network Characteristics Data PushDatagram'serrors markedbut not recovered TNet BNet Request/Responseand Data PushTransactionserrors recovered HNet to high level computing CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  28. FEE CNet PNet Where is the Cave Wall ? Differentoptionsto beevaluated TNet BNet HNet to high level computing CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  29. Proposal (V.Lindenstruth): handle all three interfaces with one physical serial link use an optical interface already at the FEE chip level + no noise from data lines + low chip pin count this requires SerDes cores on FEE chips low-cost fiber couplings this implies clock/time is distributed on the uplinks of the CNet FEE Interface 3 logical interfaces FEE Also: Test(JTAG) OASE Hit Data(out only) Clock and Time(in only) Control(bidirectional) might bebidirectional(cluster RoI transfers) New territory CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  30. FEE CNet PNet Focus on PNet TNet BNet HNet to high level computing CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  31. 10 node boards(different types) double star fabric 10 Gbps links 40 GB/sec BW almost feasible today !! A Sub-farm Scenario 8 portswitches 8 portswitches FabricBoard Node Board from BNet 10 Gbpslinks 10 Gbpslinks to HNet CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  32. A Sub-farm Scenario II MultiGig RTconnectors6.4 Gpbs/pin MultiGig RTconnectors6.4 Gpbs/pin This is VME++VITA 41.x • Core pieces are already here today • can only improve... • Missing: FPGA and SoC with PCIe • wait and see how market moves • Essential: Power consumption • 2.5 Gbps SerDes now 100-200 mW • 160 Gbps switch now 6.5 W (130 nm) • PLX PEX8532 or BCM5675 • in 2010: see what 45nm will do 8 port, 32 lanePCIe switch160 Gbps bandwidthPLX PEX8532 10+2 slot VXS backplaneELMA 101VXSD712 CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  33. Slide from CHEP'04 Dave McQueeneyIBM CTO US Federal CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  34. Network Summary • 5 different networks with very different characteristics • CNet • medium distance, short messages, special requirements • connects custom components (FEE ASICs) • TNet • broadcast time (and tags), special requirements • BNet • naturally large messages, Rack-2-Rack • PNet • short distance, most efficient if already 'build-in' • connects standard components (FPGA, SoCs) • HNet • general purpose, to rest of world FEE Interfaces and CNet will be co-developed. Depends on how clock/time distribution is done Custom Potentially build with CNet components Custom Probably uncritical open severalCOTS options Look at emerging technologiesStay open for changes and surprisesCost efficiency is key here !! PCIe + ASI Whatever the implementation is, it will be called Ethernet... Ethernet CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  35. From Hardware to Software • Key question is whether we can achieve at least 1:1000 trigger rejection for the D and J/Ψ triggers at an affordable hardware setup. • Needed: • Fast algorithms • Realistic Trigger Performance Simulations • Detector – Trigger Co-development See J. Gläß and I. Kisel talks Starting in new FrameworkStill to do: full tracking MAPS pileup efficiencies/noise Still on 0th iteration.... CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI

  36. Timelines • CBM Technical proposal due 15.1.2005 • this is 101 days from now • this is 73 working days from now if you still believe in weekends and a xmas break... • One part is: FEE/DAQ/Trigger architecture proposal • with implementation plan (R&D steps, milestones,....) • with risk assessment • with cost estimate • Lets have dinner.... CBM FEE/DAQ/Trigger - Status and Overview, Walter F.J. Müller, GSI