1 / 22

Baseline for wind energy project in Tunisia Second National Workshop March 31 & April 1, 2004

Baseline for wind energy project in Tunisia Second National Workshop March 31 & April 1, 2004. Electric sector data. National operator: STEG Regulatory framework: STEG has the monopole on energy transport and distribution. Independent power production is allowed Electrification rate: 95%

reed-zamora
Download Presentation

Baseline for wind energy project in Tunisia Second National Workshop March 31 & April 1, 2004

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Baseline for wind energy project in Tunisia Second National Workshop March 31 & April 1, 2004 CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  2. Electric sector data • National operator: STEG • Regulatory framework: STEG has the monopole on energy transport and distribution. Independent power production is allowed • Electrification rate: 95% • Demand increase: 6,5% per year • Electric consumption: about 10.000 GWh on 2002 • Installed capacity: about 2800 MW • Peak capacity: 1835 MW CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  3. Power Production Park Evolution CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  4. Electric sector data CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  5. The Wind Energy project of Sidi Daoud • Location: North East • Starting operation date: August 2000 • Capacity: 10,56 MW • Cost: 12,4 MDT • Funding: STEG (20%), Long term spanish credit (80%) • Extension on 2003 : 8,72 MW, 10,5 MDT • Institutional frame: direct operation by STEG CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  6. Wind Energy Potential (capacity) CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  7. Wind Energy potential (penetration rate) CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  8. Barriers to Wind Energy development in Tunisia • high capital technology • Wind kWh not competitive with conventional power generation • Wind energy does not avoid capacity • It substitutes “only” fuel needed to produce marginal kWh • No suitable regulatory and institutional framework • No mechanism to support the incremental cost between wind kWh and conventional kWh • No specific incentives to the wind sector CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  9. Wind Energy CDM Project of Sidi Abderrahmen Location: North East of Tunisia, Sidi Abderrahmen Mountain Wind quality: 8 to 9 m/s in 30 m Performance: 3200 hours/year Capacity: 100 MW Investment: about 100 MUSD, private sector Institutional framework: Independent production CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  10. Methods used for baseline calculation Method 1: Actual average efficiency of the power production park on 2002 Method 2: Historical average efficiency of the power production park 1992-2002 Method 3: Calculation based on the generators installed within the 5 last years and who is among the 20% most efficiency generators in operation in the park Method 4: Calculation based on marginal generators average CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  11. Power generators selection for baseline calculation (method 1 & 2) CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  12. Power generators selection for baseline calculation (method 3) CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  13. Power generators selection for baseline calculation (method 3) CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  14. Power generators selection for baseline calculation (method 4) CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  15. Power generators selection for baseline calculation (method 4) CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  16. Power generators selection for baseline calculation (method 4) CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  17. Power generators selection for baseline calculation (method 4) CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  18. Energy saving CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  19. Power generators selection for baseline calculation (method 4) CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  20. GHG emissions reduction CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  21. Economic issues CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004

  22. Power generators selection for baseline calculation (method 4) CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004