1 / 18

Funding Water and Wastewater Infrastructure Projects

Funding Water and Wastewater Infrastructure Projects. Water Infrastructure Finance Authority of Arizona. About WIFA Overview of Grant and Loan Programs Application Process. Water Infrastructure Finance Authority.

Download Presentation

Funding Water and Wastewater Infrastructure Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Funding Water and Wastewater Infrastructure Projects Water Infrastructure Finance Authority of Arizona

  2. About WIFA Overview of Grant and Loan Programs Application Process

  3. Water Infrastructure Finance Authority Maintain and improve water quality in Arizona by providing financial assistance and technical assistance for basic water infrastructure. Design, Improvement, Construction, Acquisition of Drinking Water, Wastewater, Water Reclamation and other water quality projects

  4. Traditional Projects Rehab/replacement of water distribution lines Arsenic treatment systems Wastewater treatment plant upgrades Green Projects Energy audits Solar power for water and wastewater facilities Water reclamation Project Examples

  5. What makes WIFA a good funding option? • Clean Water and Drinking Water Revolving Funds • AAA credit rating = low-interest financial assistance • No application fees or closing costs • Grants and free Technical Assistance Programs

  6. Average Federal Capitalization Grant/Year • $4-6 million for Clean Water • $23 million for Drinking Water

  7. ARRA Financing • Allocated $82 million of federal Recovery Act money • Combined with our other funding sources - $183 million of projects on the ground • $24 million funded Green Projects

  8. Eligible applicants • Drinking Water • Public water systems owned by political subdivisions (cities, towns, districts and tribal entities) and private ACC-regulated systems • Clean Water • Restricted to various types of political subdivisions (cities, towns, districts), including tribal entities

  9. DW Technical Assistance Planning and Design Grants Design and Construction Loans Assistance Programs

  10. DW Technical Assistance Planning and Design Grants Design and Construction Loans FREE ADEQ Capacity Development Program Small drinking water systems (<10,000 people) receive: • System Evaluation • Operations and Maintenance Package

  11. DW Technical Assistance Planning and Design Grants Design and Construction Loans • Plan or design an infrastructure project • Funds typically used to hire engineer or other consultant • Maximum grant is $35,000 • Local match waived/reduced for water/energy efficiency projects

  12. DW Technical Assistance Planning and Design Grants Design and Construction Loans -Feasibility Studies -Rate Studies/Financial Audits -District formation -Capital Improvement Plans -Other planning projects Planning -Preliminary Engineering Reports -Environmental Assessments -Engineering Plans and Specifications -Other design projects Pre-design & Design Project Construction (Not eligible for grant funding) Construction

  13. DW Technical Assistance Planning and Design Grants Design and Construction Loans • Two grant cycles per year • Applications due end of April and end of October • Awards are made in June and December

  14. DW Technical Assistance Planning and Design Grants Design and Construction Loans Loans for Project Design and Construction • WIFA offers below market interest rates • 3.08% average for governmental • 4.97% average for non-governmental • No application fees or closing costs • Design loans • Interest only for 3 years, principal rolled into construction loan

  15. DW Technical Assistance Planning and Design Grants Design and Construction Loans Two-step loan application process • Priority List application (online) • Project Finance Application based on “readiness to proceed:” • Debt authorized • Project designed • Plans approved • Bids solicited

  16. Priority List Applications (loans)

  17. pdf Applications (loans)

More Related