An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BPM System Team R. Dickson A. Freyberger O. Garza J. Musson M. Keesee D. Napier P. Francis A. Delacruz K. Cole E. Strong

  2. BPM System Team Membersbpmteam@jlab.org • Richard Dickson System Owner (dickson@jlab.org) x5082 • Arne Freyberger Diagnostics System (freyberg@jlab.org) x6268 Owner/Integrator • Omar Garza I&C Group Leader (garza@jlab.org) x7257 • John Musson I&C Project Coordinator (musson@jlab.org) x7441 • Marie Keesee BPM Software Support (keesee@jlab.org) x7635 • Dianne Napier 4CH BPM System Expert (napier@jlab.org) x6239 • Ed Strong nA BPM System Expert (estrong@jlab.org) x7229 • Pete Francis SEE BPM System & (francis@jlab.org) x7528 Beam Sync Lead Tech • Keith Cole nA BPM & MoMod System (colek@jlab.org) x5920 Lead Tech • Anthony DelaCruz 4CH BPM Support Tech (delacruz@jlab.org) x7029

  3. Agenda & Minutes • BPM System Team Meeting 10-20-04 • BPM Team Documents

  4. System Status & Spares • BPM System Maintenance\Current BPM Status

  5. Ops-Prs • 2/4/6/8 E01 SOFs should be revisited • 2E01 SEE YSOF.bmp • 4E01 stack survey offset problem.bmp • 7A27 MoMod BPM Failed • 4E01 Errors • 4E01.bmp • Some North Linac SEE BPMs do not see pulsed beam • Test Plan written • 8E02 Beam position is erroneous • 8T08 set to bad by Ops • SEE BPM troubleshooting/Auto Fast SEE • 8E03 Erratic Readbacks • Orbit drifted • 4A11 BPM has bad position • IPM2A14 status set to bad by smyers • 4S00 set to bad by Francis • SL11 displays beam when BNP

  6. Elogs/On-Call Issues • Hall B nA detecting injector noise • Hall B, Position instability at IPM2C21X • Crew Chief OWL Shift Log, 05-13-2004

  7. Maintenance & Atlis • MCC Scheduling Whiteboard • Atlis - Accelerator Task List • July Shutdown Activities_BPM Systems.xls

  8. Upgrades • 4CH Replacement • E. Strong, K. Cole, D. Napier • In Conceptual/Prototyping Phase • Plan to install prototype during July down • Mux Controller/Mux Status Readbacks • D. Napier, O. Garza • Currently no status in hardware or software • Hardware design in progress

  9. Test Plans • North Linac SEE BPM Position Readings in Pulsed Beam Mode