Rough draft
This presentation is the property of its rightful owner.
Sponsored Links
1 / 1

Rough draft Concept for Zero Waste Aiken - 3 places in building PowerPoint PPT Presentation


  • 87 Views
  • Uploaded on
  • Presentation posted in: General

Rough draft Concept for Zero Waste Aiken - 3 places in building this could be the set-up in Student Lounge (first floor) and Faculty lounge (3 rd floor) and maybe 1 other spot on 2 nd floor. Waste Bin: For all other compostables , paper cups, napkins, cooked foods

Download Presentation

Rough draft Concept for Zero Waste Aiken - 3 places in building

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Rough draft concept for zero waste aiken 3 places in building

Rough draft

Concept for Zero Waste Aiken - 3 places in building

this could be the set-up in Student Lounge (first floor) and Faculty lounge (3rd floor) and maybe 1 other spot on 2nd floor

Waste Bin:

For all other compostables, paper cups, napkins, cooked foods

For transport to off-site composting

  • Recycle Bin:

  • Office paper

  • Newspaper

  • Magazines

  • Bottles

  • Cans

  • Plastic take-out boxes

Green Bin:

For all other compostables, paper cups, napkins, cooked foods, leftovers

For transport to off-site composting

Small pail:

Fruit and veggie peels only,

For Worm Composting bin in Aiken

2-gallon “kitchen pail” -

13-gallon green bin –

22-gallon WASTE – already in place

22-gallon RECYCLE– already in place


  • Login