An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HOPI TRIBE-DEPARTMENT OF NATURAL RESOURCESHopi Environmental Protection Office (HEPO)Air Quality Program

  2. History • 2005-2008: Through funding from General Assistance Program (GAP) an emissions inventory was conducted identifying local area sources which may be impacting the Hopi reservation. • 2009: The HEPO secured 103 funding from the United States Environmental Protection Agency’s Clean Air Act (CAA).

  3. Continued • 2009-current date: The HEPO made contact with the Institute for Tribal Environmental Professionals (ITEP) a program for Tribes based out of Northern Arizona University (NAU). ITEP provides training for not only Arizona Tribes but for Tribes throughout the United States. • 2010: HEPO secured Mini-Vol equipment from the Tribal Air Monitoring Support (TAMS) center to assess particulate matter 10 (PM10).

  4. Short term ozone assessment project • In FY-2012 Hopi’s short term ozone assessment project was approved by EPA Region 9. • A request was made to the Tribal Air Monitoring Support (TAMS) center to loan ozone analyzer and calibration unit. (need to make request as soon as possible). • Another request was made to ITEP for Professional Assistance (PA) to assist with the set-up and initial and final audits.

  5. Short term ozone assessment project • A Quality Assurance Project Plan (QAPP) was drafted with the assistance from ITEP (Melinda Ronca-Batista), and submitted to Region 9’s Quality Assurance Office. • Once submitted, Follow-up, need to keep checking. Review was completed and minor revisions were cited with conditions (needed to attend a training).

  6. Short term ozone assessment project 6. Getting ready to set up monitor, site approval (need a temperature controlled room), ordering supplies, scheduling the installation dates etc. Important tips: • Logbooks • Notes • Schedule • Weather conditions

  7. Data Review/Management • Who? • What? • Where? • When? • Why? These are critical questions during data review. The more questions you have the more interesting managing the data becomes.

  8. Current Ozone Monitoring Sites

  9. Analyzer and Calibrator

  10. Photos

  11. Special Thanks to ITEP Staff for Professional Assistance making the project possible. • Mr. Glenn Gehring • Lydia Scheer • Melinda Ronca-Batista • Mehrdad Khatibi • Ann-Marie Chischilly • Christopher Lee • EPA Region 9 Air Quality Office

  12. QUESTIONS?Alfonso Mahkewa928-734-3638amahkewa@hopi.nsn.us