Interchange Distribution Calculator Working Group (IDCWG) Update. Jim Busbin IDCWG Chairman NAESB WEQ BPS Meeting Minneapolis, Minnesota November 10-11, 2010. IDCWG Update. GTL Calculation Testing GTL Data Submission Change Order 283 Status. IDCWG Update. GTL Calculation Testing.

Download Presentation

Interchange Distribution Calculator Working Group (IDCWG) Update

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Interchange distribution calculator working group idcwg update

Interchange Distribution Calculator Working Group(IDCWG)Update

Jim Busbin

IDCWG Chairman

NAESB WEQ BPS Meeting

Minneapolis, Minnesota

November 10-11, 2010


Idcwg update

IDCWG Update

  • GTL Calculation Testing

  • GTL Data Submission

  • Change Order 283 Status


Idcwg update1

IDCWG Update

GTL Calculation Testing


Idcwg update2

IDCWG Update

  • GTL Calculation Testing –

    • Calculation Testing Sessions:

      • Test Plans Developed For GTL Calcs Prior To Test Sessions

      • October 5-7, 2010 in Minneapolis, MN (OATI)

      • October 11-15, 2010 in Minneapolis, MN (OATI)

      • Remote Testing Performed As Needed

  • Results:

    • No Outstanding Variances

    • Functional Testing Completed

    • CO-283 Developed As Specified


  • Idcwg update3

    IDCWG Update

    GTL Data Submission


    Idcwg update4

    IDCWG Update

    • GTL Data Submission –

      • General Categories Of Data:

        • Generator MW’s

        • Load Zone MW’s

        • Branch Flows

        • Tie Flows

        • Phase Shifter (PAR) Taps

        • Variable Frequency Transformer (VFT)

        • DC Lines

        • Dynamic Schedules

        • Source Granularity

        • Sink Granularity

        • EMS\PSSE Mapping

        • Generator Block Load Dispatch


    Idcwg update5

    IDCWG Update

    • GTL Data Submission –

      • Full Data Load Submission:

        • Data Not Yet Being Submitted At Full Load Rate

        • Issues With Data Mapping and Data Validity Remain

        • Interconnection Participants Expect To Get To Full Load Submission By Mid-December

        • OATI Will Address Implementation Issues As They Arise


    Idcwg update6

    IDCWG Update

    Change Order 283 Status


    Idcwg update7

    IDCWG Update

    • Change Order 283 Status –

      • IDCWG Approved CO-283 As Implemented On November 1

      • Data Submission Testing Will Continue For Participants

        • Developmental IDC Will Remain On Developmental Hardware

        • Once Full Load Submission Is Achieved, Developmental IDC Will Be Moved To Production Hardware To Be Operated In Parallel With Existing Production IDC


    Idcwg update8

    IDCWG Update

    Questions?