Lancaster County Bible Church. Outline. Overview of Existing Proposal Structural Depth Study Architectural Breadth Study Construction Management Breadth Study Summary/Conclusions Acknowledgements Questions. Overview of Existing. Location - 2392 Mount Joy Road Manheim, PA 11754.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Lancaster County Bible Church ' - rance


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Lancaster County Bible Church

Daniel Bellay Lancaster County Bible Church Structural Option

outline
Outline
  • Overview of Existing
  • Proposal
  • Structural Depth Study
  • Architectural Breadth Study
  • Construction Management Breadth Study
  • Summary/Conclusions
  • Acknowledgements
  • Questions

Daniel Bellay Lancaster County Bible Church Structural Option

overview of existing
Overview of Existing
  • Location

- 2392 Mount Joy Road

Manheim, PA 11754

Daniel Bellay Lancaster County Bible Church Structural Option

overview of existing1
Overview of Existing
  • Location

- 2392 Mount Joy Road

Manheim, PA 11754

Daniel Bellay Lancaster County Bible Church Structural Option

overview of existing2
Overview of Existing
  • Location
  • Use
    • Business (B)
    • Assembly (A-3)
    • Educational (E)

Daniel Bellay Lancaster County Bible Church Structural Option

overview of existing3
Overview of Existing
  • Location
  • Use
  • Owners
    • Lancaster County Bible Church
    • Pastor David Ashcraft

Daniel Bellay Lancaster County Bible Church Structural Option

overview of existing4
Overview of Existing
  • Location
  • Use
  • Owners
  • Size
    • 3-Story Low-Rise Building (45 ft.)
    • 200,000 s.f. (Total)
    • 78,000 s.f. (Addition)

Daniel Bellay Lancaster County Bible Church Structural Option

overview of existing5
Overview of Existing
  • Location
  • Use
  • Owners
  • Size
  • Cost
    • Approximately $15 Million

Daniel Bellay Lancaster County Bible Church Structural Option

overview of existing6
Overview of Existing
  • Structure
    • W-Shaped Columns, Beams, Girders
    • Open Web Steel Joist Flooring
    • Tubular Steel Cross Bracing

Daniel Bellay Lancaster County Bible Church Structural Option

overview of existing7
Overview of Existing
  • Structure
  • Exterior Finishes
    • Façade: E.I.F.S. and Brick Veneer
    • Roofing: Flat E.P.D.M.

Daniel Bellay Lancaster County Bible Church Structural Option

outline1
Outline
  • Overview of Existing
  • Proposal
  • Structural Depth Study
  • Architectural Breadth Study
  • Construction Management Breadth Study
  • Summary/Conclusions
  • Acknowledgements
  • Questions

Daniel Bellay Lancaster County Bible Church Structural Option

proposal
Proposal
  • Structural Depth Study
    • Structural Re-design Using L.R.F.D.
    • Structural Re-design using Composite Steel Framing

Daniel Bellay Lancaster County Bible Church Structural Option

proposal1
Proposal
  • Structural Depth Study
  • Construction Management Breadth Study
    • Relative Cost Comparison of Different Framing Systems
  • Architectural Breadth Study
    • Impact to Ceiling Layout due to Composite Steel Re-design

Daniel Bellay Lancaster County Bible Church Structural Option

outline2
Outline
  • Overview of Existing
  • Proposal
  • Structural Depth Study
  • Architectural Breadth Study
  • Construction Management Breadth Study
  • Summary/Conclusions
  • Acknowledgements
  • Questions

Daniel Bellay Lancaster County Bible Church Structural Option

structural depth study
Structural Depth Study
  • Existing Design Method
    • Allowable Stress Design (ASD)
  • Proposed Design Method
    • Load and Resistance Factor Design

Daniel Bellay Lancaster County Bible Church Structural Option

structural depth study1
Structural Depth Study
  • Open Web Steel Joists
    • No Reduction
  • Beams
    • No Reduction
  • Girders
    • % 6.02 Reduction Achieved

Daniel Bellay Lancaster County Bible Church Structural Option

structural depth study2
Structural Depth Study
  • Existing Flooring System
    • Open Web Steel Joist
  • Proposed Composite Floor System
    • 3” USD Metal Deck w/ 4 ½” N.W.C.

Daniel Bellay Lancaster County Bible Church Structural Option

structural depth study3
Structural Depth Study
  • In-fill Beams
    • W 21x55 (76)
    • W 16x26 (22)
  • Girders
    • W 24x76 (60,102)

Daniel Bellay Lancaster County Bible Church Structural Option

structural depth study4
Structural Depth Study
  • Structural Steel
    • 23.3 % Weight Reduction
  • Metal Decking
    • Increased 2.14 (#/s.f.)
    • Total 115,000 (pounds)
  • Shear Studs
    • 11,420 (5”, ¾” ∅)

Daniel Bellay Lancaster County Bible Church Structural Option

outline3
Outline
  • Overview of Existing
  • Proposal
  • Structural Depth Study
  • Architectural Breadth Study
  • Construction Management Breadth Study
  • Summary/Conclusions
  • Acknowledgements
  • Questions

Daniel Bellay Lancaster County Bible Church Structural Option

architectural breadth study
Architectural Breadth Study
  • Existing Ceiling
    • Exposed
  • Proposed Ceiling
    • Drop Acoustical Panel

Daniel Bellay Lancaster County Bible Church Structural Option

outline4
Outline
  • Overview of Existing
  • Proposal
  • Structural Depth Study
  • Architectural Breadth Study
  • Construction Management Breadth Study
  • Summary/Conclusions
  • Acknowledgements
  • Questions

Daniel Bellay Lancaster County Bible Church Structural Option

construction management breadth study
Construction Management Breadth Study
  • Cost
    • $1.54 Million (Existing System)
    • $2.08 Million (Composite Redesign)
  • Schedule
    • Longer Construction Time
    • Fewer Members
    • Original Schedule Difficult to Maintain

Daniel Bellay Lancaster County Bible Church Structural Option

outline5
Outline
  • Overview of Existing
  • Proposal
  • Structural Depth Study
  • Architectural Breadth Study
  • Construction Management Breadth Study
  • Summary/Conclusions
  • Acknowledgements
  • Questions

Daniel Bellay Lancaster County Bible Church Structural Option

summary conclusions
Summary/Conclusions
  • Structural
    • LRFD more Efficient ASD
    • Composite Design not most Efficient System
  • Architectural
    • Ceiling Impact Minimal
    • Maintained Overall Architectural Program
  • Construction Management
    • Higher Cost
    • Original Schedule Difficult to Maintain

Daniel Bellay Lancaster County Bible Church Structural Option

outline6
Outline
  • Overview of Existing
  • Proposal
  • Structural Depth Study
  • Architectural Breadth Study
  • Construction Management Breadth Study
  • Summary/Conclusions
  • Acknowledgements
  • Questions

Daniel Bellay Lancaster County Bible Church Structural Option

acknowledgements
Acknowledgements
  • Warren Mann and Michael Hughes of

Mann-Hughes Architecture

  • Pastor David Ashcraft
  • AE Faculty and Staff
  • My Family

Daniel Bellay Lancaster County Bible Church Structural Option

thank you
Thank You!

Daniel Bellay Lancaster County Bible Church Structural Option

questions
Questions???

Daniel Bellay Lancaster County Bible Church Structural Option