Logistics of Using Underground Pipelines for Freight Transportation
Download
1 / 16

Logistics of Using Underground Pipelines for Freight Transportation Freight Pipeline Company - PowerPoint PPT Presentation


  • 100 Views
  • Uploaded on

Logistics of Using Underground Pipelines for Freight Transportation Freight Pipeline Company James S. Noble, Ph.D., P.E. & Mustafa Sir, Ph. D. Gaohao Luo, Anna McLaughlin, Nichole Smith. AGENDA – October 28, 2009 Problem Statement / Approach Current Work Operations Optimization

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Logistics of Using Underground Pipelines for Freight Transportation Freight Pipeline Company' - ramya


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Logistics of Using Underground Pipelines for Freight TransportationFreight Pipeline Company

James S. Noble, Ph.D., P.E. & Mustafa Sir, Ph. D.

Gaohao Luo, Anna McLaughlin, Nichole Smith

  • AGENDA – October 28, 2009

  • Problem Statement / Approach

  • Current Work

    • Operations Optimization

    • Load / Unload Analysis

    • Simulation

Center for Engineering Logistics and Distribution (CELDi)An NSF sponsored Industry/University Cooperative Research Center


% Complete Transportation

Logistics of Using Underground Pipelinesfor Freight TransportationResearch Team: James Noble(PI), Mustafa Sir, GaohaoLuo Anna McLaughlin, Nichole Smith

0%

100%

Sponsor:Freight Pipeline Company

Problem in context: Many large metro areas around the world are highly congested hindering the flow of freight in and out. Underground freight pipelines or tubes can reduce congestion, reduce environmental impact of freight movement and reduce overall transportation cost. Projects are currently in the evaluation stage in New York, Sydney, Shanghaiand others.

  • Important/Expected Results

  • Tube network design – I/O location, flow path

  • Capsule dispatching / control algorithms

  • Cargo tracking approaches

  • Design of load / unloading processes

  • Capacity analysis

  • Technical Approach

  • Assess related logistics issues

  • Develop object oriented simulation model for analyzing dispatching / control approaches

  • Formulate design / operation models

  • Development of solution algorithms

  • Model sensitivity analysis

  • Implementation scenario analysis

  • What can other members use?

  • Network design algorithms

  • Loading/unloading algorithms

  • Cargo tracking strategies

  • Dispatching / control algorithms


Problem statement
Problem Statement Transportation

  • Logistics issues associated with freight tube system

    • Tube network design – I/O location, flow path

    • Dispatch/control of capsules according to freight shipment needs (capacity and schedule)

      • Tracking of cargo in transit in the pipe and in storage room

    • Design of cargo loading and unloading process at freight pipeline terminals

    • Capacity analysis


Project approach
Project Approach Transportation

  • Literature review of related problem areas (i.e. pneumatic pipeline, AGV systems, rail systems)

  • Determination of modeling issues

    • Technology constraints

    • # vehicles / train length

    • Route / network design

    • Buffer size / load sizes

  • Development of simulation model (Simio)

  • Development of optimization models for select design issues

  • Model analysis


Problem Domain Transportation

  • Network Design

  • flow path

  • # & location P/D

Vehicle

Technology

Vehicle Rqmts

- size and #

Information

- ID (RFID)

  • Operation

  • dispatching

  • routing


Operation Optimization Transportation


Operation Optimization Transportation

Minimize

Total squared tardiness

Subject to:

Sequential operations

Capacity


The parameters of the example are shown below: Transportation

Operation Optimization: Case Example


Operation Optimization: TransportationCase Example

All three operations can be completed using one of the following 3 schedules:

  • O12 O23 O31 ,then the sum of square of total tardiness = 12 + 22 + 32 = 14

  • O23 O31  O12, then the sum of square of total tardiness = 02 + 12 + 62 = 37

  • O31 O12 O23, then the sum of square of total tardiness = 02 + 42 + 52 = 41

Lingo Results


Load/Unload Concepts Transportation


Load/Unload Concepts Transportation


Load/Unload Concepts Transportation