Badarpur. BADARPUR THERMAL POWER STATION. (ISO 9001 / ISO 14001 POWER STATION). WELCOME. Badarpur. BTPS BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY CONSUMPTION INSTALLED CAPACITY 720 MW DERATED CAPACITY 705 MW (3x95 + 2x210MW)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' WELCOME' - ramona


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Badarpur

BADARPUR THERMAL POWER STATION

(ISO 9001 / ISO 14001 POWER STATION)

WELCOME

slide2

Badarpur

        • BTPS
  • BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY

CONSUMPTION

  • INSTALLED CAPACITY 720 MW
  • DERATED CAPACITY 705 MW

(3x95 + 2x210MW)

  • OWNED BY GOVT. OF INDIA, MINISTRY OF POWER
  • BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978.
  • NTPC adjudged as the 3rd best employer in India
slide3

Badarpur

  • INTRODUCTION
  • BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region.
  • The site construction activities started in 1968.
  • The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81.
slide4

Badarpur

  • Our Core Values
  • Customer Focus
  • Organisational Pride
  • Mutual respect and Trust
  • Initiative and Speed
  • Total Quality
slide5

Badarpur

          • INTRODUCTION
  • For the past 29 years & in its 30th year of operation, BTPS has been moving from strength to strength.
  • Achieved new heights in Generation, Availability and substantial reduction in inputs; thereby demonstrating overall efficiency in plant performance, towards its end-objective of providing power to the Capital.
  • In spite of the old and aging units, PLF of BTPS has remained higher than the National Average for the last 16 consecutive years.
  • Amongst Top 20 Power Stations of India current FY 8th position.
  • Achieved all our MOU Targets with Excellent Rating.
slide6

Badarpur

*TILL OCT’04

Major breakthrough

Above 80% PLF achieved from 1999-00 onwards

BTPS ACHIEVED QMS AND EMS IN 2000

slide7

Badarpur

  • Factors Responsible for Sustained performance of BTPS
  • O&M Practices
  • To maximise availability and maximise efficiency in sustained manner
  • Integrated Approach adopted towards implementation of the following systems:
        • Maintenance Management System
        • Operations Management System
        • Efficiency Management System
        • Renovation and Modernisation
slide8

Badarpur

  • Maintenance Management System
  • Objective:Maximizing Availability Through:
    • Identifying maintenance needs and applying appropriate maintenance methods and their implementation in time bound manner.

It involves:

    • Long Tem Planning
    • Short Term Planning
    • System Planning
    • Predictive Maintenance
    • Breakdown maintenance reduction
    • Renovation and Modernization
slide9

AWARDS

Badarpur

  • MOP’s Meritorious Productivity Award:
    • For calendar years 1987, 1988, 1990.
    • For financial years 92-93, 94-95 and 97-98
    • Received Bronze medal in 1998-99 and
    • Received Silver shield and certificate of Meritorious performance for 2000-01.
    • Received Gold shield and Certificate for outstanding performance three consecutive years 01-02 & 02-03 , 03-04. the awards were presented by Hon’ble President of India and Hon’ble power Minister on 24 August 2004.
slide12

Badarpur

  • ENVIRONMENT MANAGEMENT
    • RECEIVED GOLDEN PEACOCK AWARD 2003 FOR ENVIRONMENT PROTECTION AT PALAMPUR,HP.
    • RECEIVED INDO-GERMAN GREENTECH EXCELLENCE
    • AWARD FOR ENVIRONMENT PROTECTION FOR THE
    • YEARS 2001 & 2002.
    • RECEIVED CORP. ENVT. AWARD OF NTPC FOR 2000- 2001.
    • APPRECIATION CERTIFICATE FROM CHIEF MINISTER, DELHI TO THE TEAM OF BTPS FOR PARTICIPATION IN YAMUNA CLEANING ABHIYAN.
slide13

Badarpur

  • ENVIRONMENT MANAGEMENT
    • APPRECIATION CERTIFICATE FROM SECRETARY (ENVT) CUM CHAIRPERSON, DPCC FOR ENVIRONMENT MANAGEMENT.
    • MASSIVE TREE PLANTATION, EVEN IN ADOPTED LAND.
    • BTPS HAS RECEIVED AUTHORISATION FOR DISPOSAL OF BIO - MEDICAL WASTE FOR THE FIRST TIME.
    • CONSENT HAS BEEN GRANTED FOR HAZARDOUS WASTE MANAGEMENT.
slide14

Badarpur

    • ENVIRONMENT MANAGEMENT
  • Station bagged IOC rolling trophy for reduction in fuel oil consumption for 98-99.
  • Greentech Industrial Safety Award 01-02, declared winner of Gold Award in Thermal Power Sector for outstanding achievement in the area of Industrial Safety – on 26.6.02.
slide15

Badarpur

  • AWARDS
  • British safety award for 1988, 1994 and 1999.
  • One employee bagged the Vishwakarma Rashtriya Puraskar in 1994 from Ministry of Labour. Six employees have been given the same award for 1998.
  • 6 BTPS employees were awarded under Delhi Shramik Sujhao Yojna Puraskar’97 &
  • Another 8 employees have been awarded under Delhi Shramik Sujhao Yojna Puraskar’98 at Vigyan Bhawan on 20th Aug’02by Chief Minister of Delhi.
slide16

AWARDS

Badarpur

  • BTPS awarded Silver shield in Thermal Power Sector for Outstanding Achievement in Safety management by Greentech foundation for 2003-04
  • BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2002-03
  • BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2003-04
  • BTPS received golden peacock award for it innovations for 2003-04

BTPS received golden peacock award for IT Innovations for 2003-04

slide18

Badarpur

HR Initiatives contd.

  • Training enphasis for all employees atleast 7 days in a year , Up-gradation of technical knowledge and skill through retraining and monitoring of learning index.
  • Responsibility accounting & Subordinate development.
  • Inspiring people to become leaders at all levels.
  • Implementation of the concept of “HR Ambassadors”.
slide19

Badarpur

HR Initiatives contd.

  • Conducting Mass Communication Meetings at various levels like GM, HOD etc. for providing an open platform for sharing the views related to all the fields amongst employees.
  • Continuous enhancing of personal effectiveness through innovative reward and recognition.
  • Implementation of “5S” System on a pilot project basis.
slide20

Badarpur

HR Initiatives contd.

Quality Circles

  • 112 QCs are operating in the station.
  • At National Convention of Quality Circles (NCQC-2000)
    • “Chetna” QC of BTPS bagged first award in category “Best of Manufacturing Support Stream”.
    • Our other QC namely “Chakra” won “Best of The Session Award” in the same contest.
  • Quality Circle ‘Chakra’ won Distinguished Category Award at the 15th National Convention held at Hyderabad (NCQC-2001).
slide21

Badarpur

HR Initiatives contd.

QUALITY CIRCLES

  • AT CCQC-2002 QCFI (MADURAI CHAPTER) FROM 28/06/02 TO 29/06/02, CHAKRA QC WON DISTINGUSED CATEGORY PRSENTATION AWARD.
  • AT CCQC-2002 (DURGAPUR CHAPTER) FROM 12th TO 13th JULY 2002, ABHIGYAN QC WON 1st PRIZE IN SERVICE GROUP.
  • AT INTERNATIONAL QUALITY CIRCLE CONVENTION -2002 (LUCKNOW ) WHICH WAS HELD ON 17-20 DEC 2002, THREE QC TEAMS - CHETNA , CHAKRA & TARANG PARTICIPATED & CHETNA WON DISTINGUISHED CATEGORY AWARD.
slide22

Badarpur

HR Initiatives contd.

Professional Circles

  • 10 Professional Circles in the station
  • Suggestion schemes
  • 1.15 Suggestions received per employee per annum against MOU target of 1 suggestion per employee per annum
  • Employee satisfaction surveys
  • NTPC ranked 3rd in the Business Today –Hewitt best employers in india 2003 survey
  • TPM
  • Step -2 of Jhishu Hozen completed for all 8 manager model machine and horizontal spread for other areas in progress.
slide23

Badarpur

  • Health care and SOCIAL ACTIVITIES
  • BTPS Hospital covered in ISO-9001.
  • Medical relief work during
    • cyclone affected Orissa
    • Earth quake in Gujarat
  • Cancer detection camp, Bone Density Camp & Diabetes Education Camp
  • Eye camp and Pulse polio program
  • Blood Donation camp and Annual Health checkup
  • Check up for school children
  • Deepshikha ladies club charitable dispensary
slide24

Badarpur

GOAL

YEAR OF EXCELLENCE

- TPM

- POG

- DISHA

- RCM

- WORK SHOP BASED

MAINTENANCE

- CENTRALISED LUB

OIL CELL

- PG TEST FOR ALL

EQUIP.

- BENCHMARKING

PROJECTS

- FAILURE/B.DOWN

ANALYSIS

- KNOWLEDGE

MANAGEMENT

- SIX SIGMA

- SITE VISIT

- MERIT ORDER

OPERATION

- VARIABLE COST ANALYSIS

ON MICRO LEVEL

- SPARE PARTS RECLAMATION

- HEAT RATE

IMPROVEMENT

- TEST CENTRE FOR SUBASSEMBLIES

- WATER MANAGEMENT

- DRY ASH

UTILISATION

- BRICK MANUFACTURING

- MERIT ORDER OPN.

IN WTP OF IND.

STREAMS

- FAILURE/B.DOWN

ANALYSIS IN WTP

- PMS

- TEAM BLDG.

- EMPOWERMENT

- TASK FORCES

- TRAINING

CALENDER

- MASS

COMMUNICATION

MEETING

- TRNG.FOR -

CONT.LABOUR

- FILM ON TECH.

ISSUES

- INTERNAL

CUSTOMER MEET

- CORE GROUP

- INDUSTRIAL

RELATIONS

- VISION & VALUE

ACTUALISATION

- DISHA

- UPGRADATION OF

OFFICE AND

WORKING

ENVIRONMENT

- 5S

- SUMMER

COACHING FOR

CHILDREN

- FREE

EDUCATION FOR

NEIGHBORHOOD

GIRLS

- EXTERNAL

CUSTOMER

MEET

IT

- SITE STORES

- E-PROCUREMENT

- E-AUCTION

- DRG. DIGITIZATION

- DOC. CENTRE

- RATIONALIZATION

OF CONTRACTS

- CONT. MGMT SYSTEM

- MATERIAL MGMT.

SYSTEM

- SPARE PARTS

DEVELOPMENT CELL

- STANDARDISATION

OF QUALITY PLAN

- WORK SPECIFICATION

- STANDARDISATION OF

ISOLATION

CHECKLIST

- DEFECT

STANDARDISATION

& CODIFICATION

- SITE MAINTENACE

QUALITY PLAN

- ANN. RATE CONTRACT

- VENDOR ENLISTMENT

- RAIN WATER

HARVESTING

- VERMICULTURE

Technical

Systems

- E-DESK

- CONTR. PROCESSING

(ORACLE)

- ONLINE COAL MONR.

SYSTEM

- ONLINE FINANCIAL

ACCOUNTING

SYSTEM

- MATERIAL MANAGEMENT

SYSTEM

- MIS FOR SR. EXECUTIVES

- ANURAKSHAN SYSTEM

Support Services

slide25

Badarpur

BTPS received golden peacock award for IT innovations for 2003-04

slide26

Badarpur

THANK YOU