Badarpur. BADARPUR THERMAL POWER STATION. (ISO 9001 / ISO 14001 POWER STATION). WELCOME. Badarpur. BTPS BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY CONSUMPTION INSTALLED CAPACITY 720 MW DERATED CAPACITY 705 MW (3x95 + 2x210MW)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' WELCOME' - ramona


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Badarpur

BADARPUR THERMAL POWER STATION

(ISO 9001 / ISO 14001 POWER STATION)

WELCOME


Badarpur

  • BTPS

  • BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY

    CONSUMPTION

  • INSTALLED CAPACITY 720 MW

  • DERATED CAPACITY 705 MW

    (3x95 + 2x210MW)

  • OWNED BY GOVT. OF INDIA, MINISTRY OF POWER

  • BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978.

    • NTPC adjudged as the 3rd best employer in India


    Badarpur

    • INTRODUCTION

    • BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region.

    • The site construction activities started in 1968.

    • The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81.


    Badarpur

    • Our Core Values

    • Customer Focus

    • Organisational Pride

    • Mutual respect and Trust

    • Initiative and Speed

    • Total Quality


    Badarpur

    • INTRODUCTION

  • For the past 29 years & in its 30th year of operation, BTPS has been moving from strength to strength.

  • Achieved new heights in Generation, Availability and substantial reduction in inputs; thereby demonstrating overall efficiency in plant performance, towards its end-objective of providing power to the Capital.

  • In spite of the old and aging units, PLF of BTPS has remained higher than the National Average for the last 16 consecutive years.

  • Amongst Top 20 Power Stations of India current FY 8th position.

  • Achieved all our MOU Targets with Excellent Rating.


  • Badarpur

    *TILL OCT’04

    Major breakthrough

    Above 80% PLF achieved from 1999-00 onwards

    BTPS ACHIEVED QMS AND EMS IN 2000


    Badarpur

    • Factors Responsible for Sustained performance of BTPS

    • O&M Practices

    • To maximise availability and maximise efficiency in sustained manner

    • Integrated Approach adopted towards implementation of the following systems:

      • Maintenance Management System

      • Operations Management System

      • Efficiency Management System

      • Renovation and Modernisation


    Badarpur

    • Maintenance Management System

    • Objective:Maximizing Availability Through:

      • Identifying maintenance needs and applying appropriate maintenance methods and their implementation in time bound manner.

        It involves:

      • Long Tem Planning

      • Short Term Planning

      • System Planning

      • Predictive Maintenance

      • Breakdown maintenance reduction

      • Renovation and Modernization


    AWARDS

    Badarpur

    • MOP’s Meritorious Productivity Award:

      • For calendar years 1987, 1988, 1990.

      • For financial years 92-93, 94-95 and 97-98

      • Received Bronze medal in 1998-99 and

      • Received Silver shield and certificate of Meritorious performance for 2000-01.

      • Received Gold shield and Certificate for outstanding performance three consecutive years 01-02 & 02-03 , 03-04. the awards were presented by Hon’ble President of India and Hon’ble power Minister on 24 August 2004.




    Badarpur

    • ENVIRONMENT MANAGEMENT

      • RECEIVED GOLDEN PEACOCK AWARD 2003 FOR ENVIRONMENT PROTECTION AT PALAMPUR,HP.

      • RECEIVED INDO-GERMAN GREENTECH EXCELLENCE

      • AWARD FOR ENVIRONMENT PROTECTION FOR THE

      • YEARS 2001 & 2002.

      • RECEIVED CORP. ENVT. AWARD OF NTPC FOR 2000- 2001.

      • APPRECIATION CERTIFICATE FROM CHIEF MINISTER, DELHI TO THE TEAM OF BTPS FOR PARTICIPATION IN YAMUNA CLEANING ABHIYAN.


    Badarpur

    • ENVIRONMENT MANAGEMENT

      • APPRECIATION CERTIFICATE FROM SECRETARY (ENVT) CUM CHAIRPERSON, DPCC FOR ENVIRONMENT MANAGEMENT.

      • MASSIVE TREE PLANTATION, EVEN IN ADOPTED LAND.

      • BTPS HAS RECEIVED AUTHORISATION FOR DISPOSAL OF BIO - MEDICAL WASTE FOR THE FIRST TIME.

      • CONSENT HAS BEEN GRANTED FOR HAZARDOUS WASTE MANAGEMENT.


    Badarpur

    • ENVIRONMENT MANAGEMENT

  • Station bagged IOC rolling trophy for reduction in fuel oil consumption for 98-99.

  • Greentech Industrial Safety Award 01-02, declared winner of Gold Award in Thermal Power Sector for outstanding achievement in the area of Industrial Safety – on 26.6.02.


  • Badarpur

    • AWARDS

    • British safety award for 1988, 1994 and 1999.

    • One employee bagged the Vishwakarma Rashtriya Puraskar in 1994 from Ministry of Labour. Six employees have been given the same award for 1998.

    • 6 BTPS employees were awarded under Delhi Shramik Sujhao Yojna Puraskar’97 &

    • Another 8 employees have been awarded under Delhi Shramik Sujhao Yojna Puraskar’98 at Vigyan Bhawan on 20th Aug’02by Chief Minister of Delhi.


    AWARDS

    Badarpur

    • BTPS awarded Silver shield in Thermal Power Sector for Outstanding Achievement in Safety management by Greentech foundation for 2003-04

    • BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2002-03

    • BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2003-04

    • BTPS received golden peacock award for it innovations for 2003-04

    BTPS received golden peacock award for IT Innovations for 2003-04



    Badarpur

    HR Initiatives contd.

    • Training enphasis for all employees atleast 7 days in a year , Up-gradation of technical knowledge and skill through retraining and monitoring of learning index.

    • Responsibility accounting & Subordinate development.

    • Inspiring people to become leaders at all levels.

    • Implementation of the concept of “HR Ambassadors”.


    Badarpur

    HR Initiatives contd.

    • Conducting Mass Communication Meetings at various levels like GM, HOD etc. for providing an open platform for sharing the views related to all the fields amongst employees.

    • Continuous enhancing of personal effectiveness through innovative reward and recognition.

    • Implementation of “5S” System on a pilot project basis.


    Badarpur

    HR Initiatives contd.

    Quality Circles

    • 112 QCs are operating in the station.

    • At National Convention of Quality Circles (NCQC-2000)

      • “Chetna” QC of BTPS bagged first award in category “Best of Manufacturing Support Stream”.

      • Our other QC namely “Chakra” won “Best of The Session Award” in the same contest.

    • Quality Circle ‘Chakra’ won Distinguished Category Award at the 15th National Convention held at Hyderabad (NCQC-2001).


    Badarpur

    HR Initiatives contd.

    QUALITY CIRCLES

    • AT CCQC-2002 QCFI (MADURAI CHAPTER) FROM 28/06/02 TO 29/06/02, CHAKRA QC WON DISTINGUSED CATEGORY PRSENTATION AWARD.

    • AT CCQC-2002 (DURGAPUR CHAPTER) FROM 12th TO 13th JULY 2002, ABHIGYAN QC WON 1st PRIZE IN SERVICE GROUP.

    • AT INTERNATIONAL QUALITY CIRCLE CONVENTION -2002 (LUCKNOW ) WHICH WAS HELD ON 17-20 DEC 2002, THREE QC TEAMS - CHETNA , CHAKRA & TARANG PARTICIPATED & CHETNA WON DISTINGUISHED CATEGORY AWARD.


    Badarpur

    HR Initiatives contd.

    Professional Circles

    • 10 Professional Circles in the station

    • Suggestion schemes

    • 1.15 Suggestions received per employee per annum against MOU target of 1 suggestion per employee per annum

    • Employee satisfaction surveys

    • NTPC ranked 3rd in the Business Today –Hewitt best employers in india 2003 survey

    • TPM

    • Step -2 of Jhishu Hozen completed for all 8 manager model machine and horizontal spread for other areas in progress.


    Badarpur

    • Health care and SOCIAL ACTIVITIES

    • BTPS Hospital covered in ISO-9001.

    • Medical relief work during

      • cyclone affected Orissa

      • Earth quake in Gujarat

    • Cancer detection camp, Bone Density Camp & Diabetes Education Camp

    • Eye camp and Pulse polio program

    • Blood Donation camp and Annual Health checkup

    • Check up for school children

    • Deepshikha ladies club charitable dispensary


    Badarpur

    GOAL

    YEAR OF EXCELLENCE

    - TPM

    - POG

    - DISHA

    - RCM

    - WORK SHOP BASED

    MAINTENANCE

    - CENTRALISED LUB

    OIL CELL

    - PG TEST FOR ALL

    EQUIP.

    - BENCHMARKING

    PROJECTS

    - FAILURE/B.DOWN

    ANALYSIS

    - KNOWLEDGE

    MANAGEMENT

    - SIX SIGMA

    - SITE VISIT

    - MERIT ORDER

    OPERATION

    - VARIABLE COST ANALYSIS

    ON MICRO LEVEL

    - SPARE PARTS RECLAMATION

    - HEAT RATE

    IMPROVEMENT

    - TEST CENTRE FOR SUBASSEMBLIES

    - WATER MANAGEMENT

    - DRY ASH

    UTILISATION

    - BRICK MANUFACTURING

    - MERIT ORDER OPN.

    IN WTP OF IND.

    STREAMS

    - FAILURE/B.DOWN

    ANALYSIS IN WTP

    - PMS

    - TEAM BLDG.

    - EMPOWERMENT

    - TASK FORCES

    - TRAINING

    CALENDER

    - MASS

    COMMUNICATION

    MEETING

    - TRNG.FOR -

    CONT.LABOUR

    - FILM ON TECH.

    ISSUES

    - INTERNAL

    CUSTOMER MEET

    - CORE GROUP

    - INDUSTRIAL

    RELATIONS

    - VISION & VALUE

    ACTUALISATION

    - DISHA

    - UPGRADATION OF

    OFFICE AND

    WORKING

    ENVIRONMENT

    - 5S

    - SUMMER

    COACHING FOR

    CHILDREN

    - FREE

    EDUCATION FOR

    NEIGHBORHOOD

    GIRLS

    - EXTERNAL

    CUSTOMER

    MEET

    IT

    - SITE STORES

    - E-PROCUREMENT

    - E-AUCTION

    - DRG. DIGITIZATION

    - DOC. CENTRE

    - RATIONALIZATION

    OF CONTRACTS

    - CONT. MGMT SYSTEM

    - MATERIAL MGMT.

    SYSTEM

    - SPARE PARTS

    DEVELOPMENT CELL

    - STANDARDISATION

    OF QUALITY PLAN

    - WORK SPECIFICATION

    - STANDARDISATION OF

    ISOLATION

    CHECKLIST

    - DEFECT

    STANDARDISATION

    & CODIFICATION

    - SITE MAINTENACE

    QUALITY PLAN

    - ANN. RATE CONTRACT

    - VENDOR ENLISTMENT

    - RAIN WATER

    HARVESTING

    - VERMICULTURE

    Technical

    Systems

    - E-DESK

    - CONTR. PROCESSING

    (ORACLE)

    - ONLINE COAL MONR.

    SYSTEM

    - ONLINE FINANCIAL

    ACCOUNTING

    SYSTEM

    - MATERIAL MANAGEMENT

    SYSTEM

    - MIS FOR SR. EXECUTIVES

    - ANURAKSHAN SYSTEM

    Support Services


    Badarpur

    BTPS received golden peacock award for IT innovations for 2003-04


    Badarpur

    THANK YOU


    ad