Water Tank Waterproofing

Not only properly designed structure is needed for building a water tank, but also a decent waterproofing system in order to prevent water pressure from both underground and inside the tank.Are You Looking for Waterproofing Water Tank?Contact: Raja & Rajaâ„¢ to know more.

rajaandraja
Download Presentation

Water Tank Waterproofing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Waterproofing ExpertOld by Establishment, Young by Technology Water Tank Waterproofing / Water Reservoirs:Waterproofing is a State of Art. Waterproofing is not difficult if you the Solution for the problem. The difficult task of Waterproofing is to find the Source of the Problem. Varieties of sources are present in the market for the problem if the sources are known for illness, but where doctors fails is to find the source and to fix it. Call our expert 022 2508 0101 | www.raja-n-raja.com | mail@raja-n-raja.com

  2. Water Tank/Reservoirs can be classified in to following ways: Call our expert 022 2508 0101 | www.raja-n-raja.com | mail@raja-n-raja.com

  3. As said earlier Waterproofing is state of Art. We have to choose the systems as per the requirements. These waterproofing could be done in two Ways: During Construction Phase After construction We don’t need to tell you; which is good way, RIGHT!! Waterproofing during construction eliminates the scope of error and strengthens the structure. Providing the great benefits and overview. Never the less also, increases the life of Waterproofing and Structure both. Post Construction Waterproofing is said as Rehabilitation in other word a REPAIR. Which is effective but not as much as DC phase. Post Construction Waterproofing has its own limitation of Accessibility, Cost, Aesthetic and Pragmatic; on the top it is a protection shield and not the original structure. Here, we would discuss the Waterproofing of Over Head Waterproofing, Underground Waterproofing and Elevated Tank Waterproofing. In earlier conversation we already talked about Waterproofing a Swimming Pools. Depending on the condition of your Site you can choose the System: Call our expert 022 2508 0101 | www.raja-n-raja.com | mail@raja-n-raja.com

  4. 1.During Construction Phase Waterproofing: (A) Over Head Water Tank / Elevated Water Tank: i.Surface Treatment before Casting: - Finish the surface with smoothening tools to the mother slab with 1:4:1 Cement to Sand mortar to RajaCreteAP mixed well. - Post finish apply Raja BaseCoat (Acrylic Polymer based highly flexible waterproof coating) to DFT of 2mm to 4mm for SLAB only. ii.Casting: -Add Raja CreteAD (An integreal Waterproofing Compound) which reduces the void and makes concrete impermeable. (It is to be added to 1Litre to 100Kgs of Cement by weight) Raja CreteAD makes any concrete impermeable if thickness of concrete is maintained at 6 inches with prescribed dosage. -If thickness is maintained at less than 6 inches; additional waterproofing is required. iii.Treatment after Casting Slab & Retaining Walls: - Applying Two Coats of Raja ChemCoat (Hybrid of PU and Acrylic polymer, highly flexible, Impervious and Elastic with High Bonding strength even in constant contact of Potable Water) in a DFT of 2mm per coat. Call our expert 022 2508 0101 | www.raja-n-raja.com | mail@raja-n-raja.com

  5. (B) Underground Water Tank: i.Surface Treatment before Casting: - Surface has to be sound enough, in case bleeding surface use Raja Plug and seal off the bleeding surface and in case of porus surface use Raja PorSeal to seal off the porus surface. - In case of Deeper Tank, Use Shabad stoned Box Waterproofing to lower / break the negative water pressure. Raja TripleAction in filling the slurry in the joints. - Finish the surface with smoothening tools. ii.Casting: - Add Raja CreteAD (An integreal Waterproofing Compound) which reduces the void and makes concrete impermeable. (It is to be added to 1Litre to 100Kgs of Cement by weight) Raja CreteAD makes any concrete impermeable if thickness of concrete is maintained at 6 inches with prescribed dosage. - If thickness is maintained at less than 6 inches; additional waterproofing is required. iii.Treatment after Casting Slab & Retaining Walls: - Applying Two Coats of Raja CrMi (an intergral Crystalline based Waterproofing to resist the negative water pressure up to 10 bars). Call our expert 022 2508 0101 | www.raja-n-raja.com | mail@raja-n-raja.com

  6. 2.After Construction Waterproofing (Rehabilitation): (A) Over Head Water Tank / Elevated Water Tank: i.Cleaning The surface: - Clean the surface thoroughly for loose portion, grece or any debris. - Surface coating of the Primer is recommended to ensure better adhesion of the Waterproofing Coating to the parent structure. ii.Waterproofing: - Applying Two Coats of Raja ChemCoat (Hybrid of PU and Acrylic polymer, highly flexible, Impervious and Elastic with High Bonding strength even in constant contact of Potable Water) in a DFT of 2mm per coat. (B) Underground Water Tank: i.Cleaning The surface: - Clean the surface thoroughly for loose portion, grece or any debris. - Surface coating of the Primer is recommended to ensure better adhesion of the Waterproofing Coating to the parent structure. Call our expert 022 2508 0101 | www.raja-n-raja.com | mail@raja-n-raja.com

  7. ii.Waterproofing: - Depending on intensity, nature of leakage various methods could be chosen: i.Injection Grouting ii.Laying Shabad Stoned Box Waterproofing iii.Crystalline Coating based Waterproofing. iii.Soil Stabilization: Some time due to location of our underground water tank, the backfilled material or poured concrete gets washed off, and could lead to water ingress, Use of Soil stabilized material could help in arresting the leakage problem. For Thorough Description, CAD Drawings or Perspective Illustration, TDS; Contact: Raja & Raja™ These systems are tried, tested in labs and are verified, approved by most of government bodies, private entities and construction for over 30+ years now across the globe. The products mentioned in the systems are specially procured, processed and manufactured by/for Raja & Raja™ only and are in sync with all the products of Raja & Raja™. To contact:mail@raja-n-raja.com | 022 25080101 Call our expert 022 2508 0101 | www.raja-n-raja.com | mail@raja-n-raja.com