UK Transport Design Current Organisation –  15 FTE
Download
1 / 3

Russell Davey - PowerPoint PPT Presentation


  • 120 Views
  • Uploaded on

UK Transport Design Current Organisation – 15 FTE. Russell Davey. XSD– 1FTE. 21C XND– 4FTE. XSD– 1FTE. XSD– 1FTE. XTIP– 2 FTE. 21C XND– 1 FTE. XRNGA– 3 FTE. 21C XND– 1 FTE. XSD - Transmission Solution Design. XND – Transmission Network Design.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Russell Davey' - radwan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

UK Transport Design Current Organisation – 15 FTE

Russell Davey

XSD– 1FTE

21C XND– 4FTE

XSD– 1FTE

XSD– 1FTE

XTIP– 2FTE

21C XND– 1FTE

XRNGA– 3 FTE

21C XND– 1FTE

  • XSD - Transmission Solution Design

  • XND – Transmission Network Design

  • XTIP – Transport Technology Introduction Process

  • XNGA – Transport Regional NGA Design/Futures


UK Transport Design Proposed Organisation – 13 FTE

Russell Davey

XSD– 1FTE

21C XND– 4FTE

XSD– 1FTE

XSD– 1FTE

XTIP– 1FTE

21C XND– 1FTE

XRNGA– 2 FTE

21C XND– 1FTE

  • XSD - Transmission Solution Design

  • XND – Transmission Network Design

  • XTIP – Transport Technology Introduction Process – SVCT to Ciena/Huawei

  • XNGA – Transport Regional NGA Design/Futures – Stop 100G POC testing


Uk transport design
UK Transport Design

  • Current role of team is to provide Transmission design

    • Including Ciena/Huawei SVCT support, review test specs, witness, sign-off

    • Including 100G POC Test for NGWDM

  • Current organisation is 15FTE

  • Proposed role of team is to do Transmission Design and verification

    • but vendors take ownership of SVCT, we engage by exception

    • 100G POC test stops at the end of June 2012, no further work

  • Proposed organisation is 13FTE

  • 2FTE move to BTTC on 3/8/12


ad