An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operations at PS Elements for discussion Luca Latronico luca.latronico@pi.infn.it GLAST LAT CU Beam Test Workshop II June 28-30 2006

  2. Expected outcome from the workshop • Initial setup at PS is critical • First check of CU and whole setup after transportation (no time/space to do it before beam start) • Provide the procedure for SPS installation (allocated beam time much less at SPS!) • Proposal for installation: • Define parallel task and groups, e.g. • CU installation crew (mechanical) • CU electrical connections • AD installation crew (mechanical+electrical) • INFN-Bari in close connection with CU crew • DAQ and Online, PCs • Before CU installation? Check with CERN

  3. Proposed general plan • Assumption: no major changes between setups (order of ½ hour) • Change pressure and thresholds in cerenkov • Remove silicon chambers • Remove dump • Position EM cal • Beam settings  require more time to understand effects of changes) • 1st week: • CU installation and cross-check after transportation • Define procedure • Test DAQ sync and stream merge with different rates • Beam studies to feedback simulations (requested this morning) • CAL, ACD calibrations • Need short runs, maybe use the first test for data taking • AD installation and check in parallel • Test DAQ, detectors • Tagger calibration • Require specific runs in conjunction with CU

  4. Proposed general plan • 2nd and 3rd week: photon runs • Beams of 3GeV, 1GeV, 500MeV with same tagger geometry • Change geometry to 100MeV-specific geometry (500MeV, max field)  require new calibration • If more time take more data at 2GeV • 4th week: • 1 or 2 days of 10GeV protons as to get required statistics • Positrons till the end (require more statistics, different MMS thickness for background evaluation) • Nicola suggestion: setup studies at the beginning • We will know if all proposed configurations are feasible • Will release pressure on people as more will be able to switch configuration

  5. Required information and outcome • Required elements • Calibration procedures • Debug tools and quick reconstruction for calibrations • Online  define list • Offline  define list • Presence of people to coordinate shift and expert support • Homework for run-coordinator • Circulate a detailed proposal for setup and operations