OPPD’s Wind Development in Nebraska. Nebraska Wind Energy Conference November 9, 2009 Christene Bywater, P.E. Project Manager. Sustainable Energy & Environmental Stewardship. Goal of 10% Renewables by 2020 About 400 MW Why? Helps to defer baseload generation

Download Presentation

OPPD’s Wind Development in Nebraska

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Oppd s wind development in nebraska

OPPD’s Wind Development in Nebraska

Nebraska Wind Energy Conference

November 9, 2009

Christene Bywater, P.E.Project Manager


Sustainable energy environmental stewardship

Sustainable Energy & Environmental Stewardship

  • Goal of 10% Renewables by 2020

    • About 400 MW

  • Why?

    • Helps to defer baseload generation

    • Helps minimize the risk of a RES

    • Will help minimize carbon tax costs to OPPD


Oppd wind projects

OPPD Wind Projects

  • Valley Turbine – 660kw

  • 10 MW from Ainsworth Wind Farm

  • 25 MW from Elkhorn Ridge Wind Farm

  • Possible new site on Interstate 80 west of Omaha


Oppd wind projects1

OPPD Wind Projects

  • 80 MW RFP

    • Released in Aug 2008

    • Received bids in Oct 2008

      • 12 Proposals

    • Anticipated Award on April 1, 2009

    • April 1, 2009 also Transition Date from MAPP to SPP

    • Actual Award August 14, 2009


Spp transition

SPP Transition

  • Approvals Needed

    • Interconnection

    • Delivery

  • MAPP – 6 months

  • SPP – 2 years


Flat water wind farm

Flat Water Wind Farm

  • 60 MW Flat Water Wind Farm

    • JW Prairie Wind Power

    • Richardson County, NE

    • 42% Capacity Factor

    • 40 GE 1.5 MW Turbines

  • Construction of Substation started in October, 2009

  • COD is anticipated June 30, 2010


Substation design

Substation Design

  • Site Grading Plan and Substation Ground Plan Designed by Both Parties


Substation design1

Substation Design

  • All Metering by OPPD on Our Sub Site

  • 34.5 kV Underground Collector System

  • Breakers – Both Subs

  • 34.5/161 kV Transformer

    • 40/53/66 MVA


Transmission line details

Transmission Line Details

  • Line 138, Single Circuit 161 kV Transmission Line

    • From KS/NE border to NPPD Sub 975 in Humboldt, NE

    • Weathering Steel H-frame Structures

  • 2 New 70 ft. Substation Deadend Structures


Usfw ngp

USFW & NGP

  • Precautionary Measures for Migratory Birds

    • Asking JW Prairie for Bird Diverters on Shieldwires

    • Negotiations are still underway