Management Control Activity - Government Furnished Material. Ready. Resourceful. Responsive!. AGENDA. Policy Directives Procedures Reports Fraud, Waste and Abuse. DON Policy. Contractors shall provide all material required for the performance of contracts

Download Presentation

Management Control Activity - Government Furnished Material

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Slide1 l.jpg

Management Control Activity -

Government Furnished Material

Ready. Resourceful. Responsive!


Agenda l.jpg

AGENDA

  • Policy

  • Directives

  • Procedures

  • Reports

  • Fraud, Waste and Abuse


Don policy l.jpg

DON Policy

  • Contractors shall provide all material required for the performance of contracts

  • Exception when it is determined by DON that to furnish such material would

    • achieve significant economy

    • standardization

    • expedited production

    • or when it is otherwise in the government’s best interest


Don policy cont l.jpg

DON Policy (cont)

  • Decision to provide a readily available commercial item as GFM requires

    • detailed analysis

    • written justification approved by the commander of the requiring activity, or a designated representative, as being in the best interest of the government


Don policy cont5 l.jpg

DON Policy (cont)

  • All requisitions for GFM will be validated by the MCA

  • Any requisitions not validated will not be filled

  • Two types of GFM Requisitions

    • GFM “Push”

      • Generated by the government

      • Preferred method of providing GFM


Don policy cont6 l.jpg

DON Policy (cont)

  • GFM “Pull”

    • Generated by the contractor

    • Will not be utilized unless demonstrated to be a clear advantage to the Navy


Directives l.jpg

Directives

  • DOD 4000.25-1-M

  • DOD 4140.1-R

  • OPNAVINST 4440.26

  • SECNAVINST 4440.32A

  • SECNAVINST 5200.35D

  • NAVSEAINST 4440.1

  • NAVAIRINST 4440

  • NAVICPINST 4340.2C


Procedure l.jpg

Procedure

  • NAVICP will perform two distinct categories of GFM functions

    • As an Inventory Control Point

      • Will generate “push” requisitions validated by the program manager

    • As a MCA

      • Will validate MILSTRIP requisitions generated internally


Procedure cont l.jpg

Procedure (cont)

  • Will validate MILSTRIP requisitions generated by the contractor

  • Will forward passing orders to other services


Reports l.jpg

Reports

  • NAVICP produces and distributes quarterly reports of NAVICP processed GFM requisitions to CAOs


Fraud waste and abuse l.jpg

Fraud, Waste, and Abuse

  • NAVICP investigates suspicious GFM requisitions for possible fraud, waste and abuse and take appropriate action