Mp3 list of main issues during 22 28 march 2010 mp3 team
This presentation is the property of its rightful owner.
Sponsored Links
1 / 7

MP3 List of main Issues during 22-28 March 2010 MP3 - Team PowerPoint PPT Presentation


  • 59 Views
  • Uploaded on
  • Presentation posted in: General

MP3 List of main Issues during 22-28 March 2010 MP3 - Team. Main issues on previous week. Main issues on previous week. RQX.R2. RQX.R2 tripped twice while at injection current (450A) No magnet quench at this low current

Download Presentation

MP3 List of main Issues during 22-28 March 2010 MP3 - Team

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Mp3 list of main issues during 22 28 march 2010 mp3 team

MP3 List of main Issues during 22-28 March 2010MP3 - Team


Main issues on previous week

Main issues on previous week

MP3 Team


Main issues on previous week1

Main issues on previous week

MP3 Team


Rqx r2

RQX.R2

  • RQX.R2 tripped twice while at injection current (450A)

    • No magnet quench at this low current

    • Heaters fired in both events (21:46 and 01:32), without clear indication as to the source of the (QPS) trigger

    • No apparent fault of the power converter

MP3 Team


Ru l4

RU.L4

  • RU.L4 still show frequent trips during controlled ramp downs

    • Problem related to incorrect ramp rate solved (now 0.3A/s)

    • Seems zero-voltage crossing problem, as QPS threshold will be raised when <50A, propose to align ramp rate with RU.R4, ie 0.08A/s to delay zero voltage crossing into <50A region

MP3 Team


Rqtd rqtf

RQTD/RQTF

Resistance of 2 Ξ© in parallel on the circuit

  • Note for operators: 600A detectors must beproperly reset beforere-starting the machine

  • Frequentproblems due to teethingproblemswith tune feedback

    • Procedures and sequencefixedduring the week

MP3 Team


Rco a56b2 rof a45b2 it

RCO.A56B2 + ROF.A45B2 + IT

  • ROF.A45B2 tripped with afault which seems related to the AC contactor state contact -> might need an intervention to replace the power module (tbc by EPC)-> Currently not vital for beam operation

  • RCO.A56B2 and RCD.A56B2: 5th trip for RCO and 4th trip for RCD in 6 days. In all 5 events RCO goes first, all events seem triggered by U_RES jumping to 250 mV in a step function (needs detailed analysis with EPC and QPS) -> Currently not vital for beam operation

  • IT in general: Repetitive trips when switching them OFF or after Slow Power Aborts -> needs to be analysed by EPC, rather important as > pre-cycles