1 / 14

Bunker Barge Safety Program Prevention through People Subcommittee of the San Francisco Harbor Safety Committee

Bunker Barge Safety Program Prevention through People Subcommittee of the San Francisco Harbor Safety Committee. Best Practices for the Bunker Barge and Terminal Cargo Operations Interface. Bunker Barge Safety Program.

prosper
Download Presentation

Bunker Barge Safety Program Prevention through People Subcommittee of the San Francisco Harbor Safety Committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bunker Barge Safety ProgramPrevention through People Subcommitteeof theSan Francisco Harbor Safety Committee Best Practices for the Bunker Barge and Terminal Cargo Operations Interface

  2. Bunker Barge Safety Program The Prevention Thru People Subcommittee formed a Working Group to develop educational material to promote Maritime Safety in the Bunkering Process.

  3. Bunker Barge Safety Program • This document will outline the process for essential communication between the agents, bunker barge operators and terminals to ensure safe productive work environments. • This is intended to serve as a Best Management Practices training tool to assist all parties in passing the “BMP’s” to the “front line” personnel.

  4. Understanding The Bunkering Process • Vessels contract for Bunkers • Oil Companies notify barge operators • Agents coordinate delivery notifications with barge operators and terminals • Bunker Barge arrival time and duration of pumping is established

  5. Understanding The Bunkering Process • Vessel Arrives for Cargo Operations • Terminal plans operations • Cargo Flow Sheet or Crane letter of Operations CFS/CLO is prepared • Outlines what cargo is to be moved in what sequence • Terminal will plan around bunker ops if possible • Terminal gives CFS/CLO to Agent to pass to Chief Engineer and Tankerman • Agent Coordinates bunker barge arrival

  6. Understanding The Bunkering Process • Bunker Barge Arrives for Bunker Ops. • Optimal placement to minimize exposure. • Vessel Crew posts “Bunker Operations” sign. • DOI is signed by Chief Engineer and Tankerman. • Tankerman/Chief Mate/Chief Engineer should have copy of CFS/CLO. • Tankerman should understand what cargo adjacent to the barge is to be handled and when. • Tankerman should have contact for Terminal Superintendent

  7. Understanding The Bunkering Process • Vessel cargo operations commence. • Lashers sent aboard to unlash containers. • Crane lowered over hold to be worked. • Work commences in accordance with CFS/CLO • Lashers sent aboard to re-lash containers • Bunker operations could start before, during or after cargo operations • Tankerman/Superintendent have to understand where terminal is in the CFS/CLO and Bunkering process • Questions to Terminal Superintendent

  8. Area or Zone of Concern • Tankermen, Terminal Personnel, (Superintendents, Foremen, Lashers, Crane Operators) and Vessel Personnel (Chief Mate and Engineer) all must be cognizant and take particular care when lashing or cargo operations take place in the outer three stacks of containers in bays adjacent to the bunker barge if the transfer is in progress.

  9. Essential Communications: Bunker Delivery Notice • To inform all concerned parties of the planned bunkering operations, the Vessel Agent (or other carrier assigned representative), will complete a “Bunker Delivery Notice”. • The Agent will forward the notice “By E-mail” to BOTH the terminal and the bunker barge operator prior to the stevedoring operation.

  10. Essential Communications: Terminal Response 3. The terminal will reply to the Bunker Delivery notice E-mail and will include the contact phone/cell number of the Superintendent working the vessel/shift during bunkering operations. This E-mail will be the cross check that all parties are aware of a planned bunkering operation.

  11. Essential Communications:Contact between the Tankerman and Superintendent 4. The Bunker Barge Operator (Tankerman), must contact the Terminal Superintendent prior to beginning the barge operation. This will allow the tankerman to learn the planned stevedore operation in the CFS/CLO and highlight any possible conflicts. (a check sheet can be very useful for this function).

  12. Essential Communications:Tankerman Check Sheet The “Check Sheet” for the Tankerman: a. What are the bay designations directly forward and aft of the house on this vessel that overlap the bunker barge? b. Is there any planned loading, discharging, or lashing in these bays? (Clarify the CFS/CLO) c. When does the terminal plan to work these bays? d. Is any of the work in these bays going to extend into the two or three offshore positions? e. Can these positions be worked in a specific time frame so possible conflicts are avoided? • What time periods is the stevedore going to shut down cargo operations for breaks, lunch, etc.?

  13. Post Incident Response 5. It is expected that the Tankerman will be alert to the crane working near the barge and the cargo flow that has been planned. It is expected that the Tankerman will determine the proper transfer process should any incident occur which affects the safety of the operation. Any incident will require direct communications between the parties involved who shall be readily available. This will allow for adjustments to working plans to correct conflicts.

  14. Long Term Incident Resolution 6. It is expected that the Terminal Management Personnel and the Barge Operator will discuss mutually agreeable adjustments to minimize tankerman exposures that may be determined as the result of the incident and the post incident investigation. Ideas and lessons learned will be shared between all parties including the PTP Sub Committee