EXAMPLE OF COURSEWORK

EXAMPLE OF COURSEWORK. Siphon Spillway Design. EXAMPLE: Full resevoir level (m ) = 200 Level of the centre of the outlet (m ) = 195 High flood discharge (m 3 /s ) = 580 m3/s Bed level of the river (m ) = 180 Base width of the body wall (m ) = 7 High flood level (m ) = 210

presley
Download Presentation

EXAMPLE OF COURSEWORK

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EXAMPLE OF COURSEWORK

  2. Siphon Spillway Design EXAMPLE: • Full resevoir level (m) = 200 • Level of the centre of the outlet (m) = 195 • High flood discharge (m3/s) = 580 m3/s • Bed level of the river (m) = 180 • Base width of the body wall (m) = 7 • High flood level (m) = 210 • Cd (siphon discharge freely) = 0.6

  3. Solution: • From the information above, we can determine the number of siphon units required to pass the flood safely. • Calculate maximum operative head, H • H = High flood level – Level of centre of siphon outlet • = 210 – 195 • = 15 m • 2. Calculate full pipe discharge, • q=Cd x A x [(2gH)^0.5] • *Cd, siphon coefficient is given 0.6 • *Assuming the dimension of throat, width 4m x height 2m • *H is the maximum operative head.

  4. q=Cdx A x [(2gH)^0.5] q=0.6 x 8 x [(2x9.81x15)^0.5] = 82.3 m3/s Number of units required, No. of units = High flood discharge / full pipe discharge = 580 / 82.3 = 7 units

  5. Stilling basin

  6. Sewerage system design

  7. manhole manhole manhole manhole Pipe length 2-3 Pipe length 1-2

  8. STEP 1

  9. Step 4 Step 5 Step 1 Step 2 Step 3 Step 6

  10. Step 4 Step 5 Step 1 Step 2 Step 3 Step 6

  11. Step 10 Step 11 Step 13 Step 7 Step 8 Step 12 Step 14 Step 9

  12. Step 20 Step 16 Step 17 Step 21 Step 15 Step 22