Mission ops readiness test flow
Download
1 / 1

Mission Ops Readiness Test Flow - PowerPoint PPT Presentation


  • 56 Views
  • Uploaded on

Hotbench Spacecraft PSS (Sim Data) MOC System XRT & UVOT FoM/IP/BAT. Initial PSU MOC Setup. Complete PSU MOC Setup. NFI. BAT. Functional Testing. FoM I/F Testing. ETUs. Day in the Life for IST. Day in the Life for Sim 2a. Acoustic Aliveness. Obs IST Dry Run #2. Obs IST

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Mission Ops Readiness Test Flow' - polly


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Mission ops readiness test flow

Hotbench

Spacecraft

PSS (Sim Data)

MOC System

XRT & UVOT

FoM/IP/BAT

Initial PSU MOC Setup

Complete PSU MOC Setup

NFI

BAT

Functional Testing

FoM I/F Testing

ETUs

Day in the Life for IST

Day in the Life for Sim 2a

Acoustic

Aliveness

Obs

IST

Dry

Run

#2

Obs

IST

Base-

line

Sine Vibe

Aliveness

AIST

EMI/EMC

Aliveness

TVAC

Transitions: AIST

Plateaus: IST

Obs IST

Dry Run

TBalance

TCycle

TDRSS &

Malindi

ETE

MRT#1

TDRSS SoH

MRT#3

FSW Loads

SCIF#3,4

Normal Ops

Sim 2a

(GSFC MOC)

Normal Ops

Sim 2c

(People Sim)

Normal Ops

Sim 2b

(window)

L&EO

Sim 1b

FoM Activ

L&EO

Sim 1c

Instr Activ

(1d-Nov)

L&EO Sim 1a

S/C Bus Activ

(GSFC MOC)

Conting

Sim 3a

FSW Patch

Safehold?

Conting

Sim 3b

Conting

Sim 3c

Mission Ops Readiness Test Flow

M. Chester, 9 May‘03


ad