Productivity Improvement Session 6. Possible Impact of Poor Planning and Scheduling. “Planned Non-Productive Time”. Steps in Preparing and Using a Formalized Project Plan and Schedule. Defining Work Activities Determining Activity Durations Determining Activity Sequencing or Logic

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'An AGC Construction Learning Tool' - pisces


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Productivity Improvement

Session 6

An AGC Construction Learning Tool

possible impact of poor planning and scheduling
Possible Impact of Poor Planning and Scheduling

An AGC Construction Learning Tool

planned non productive time
“Planned Non-Productive Time”

An AGC Construction Learning Tool

steps in preparing and using a formalized project plan and schedule
Steps in Preparing and Using a Formalized Project Plan and Schedule
  • Defining Work Activities
  • Determining Activity Durations
  • Determining Activity Sequencing or Logic
  • Adjusting Activity Durations for Contingencies
  • Obtaining Subcontractor Input
  • Drawing the Overall Project Schedule
  • Performing CPM Calculations
  • Using the CPM Schedule for Management Decisions
  • Performing CPM Calculations

An AGC Construction Learning Tool

slide5

CPM Calculation

An AGC Construction Learning Tool

update of schedule
Update of Schedule

A

B

C

Planned Schedule

5

4

4

To Date Schedule

Update Date

6

Updated Schedule

6

5

4

Activity A: Completed:

(Show Actual Duration)

Activity B: In Progress:

(see calculation)

Activity C: Has Not Started

(Probably Show Planned Duration)

An AGC Construction Learning Tool

the one to four week look ahead schedule a supervisor s tool for increasing productivity
The One- to Four-Week Look-Ahead Schedule:A Supervisor’s Tool for Increasing Productivity

An AGC Construction Learning Tool

daily short interval scheduling a foreman s tool for increasing productivity
Daily Short Interval Scheduling: A Foreman’s Tool for Increasing Productivity

An AGC Construction Learning Tool