Productivity Improvement Session 6. Possible Impact of Poor Planning and Scheduling. “Planned Non-Productive Time”. Steps in Preparing and Using a Formalized Project Plan and Schedule. Defining Work Activities Determining Activity Durations Determining Activity Sequencing or Logic

Related searches for An AGC Construction Learning Tool

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'An AGC Construction Learning Tool' - pisces


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Slide1 l.jpg

Productivity Improvement

Session 6

An AGC Construction Learning Tool


Possible impact of poor planning and scheduling l.jpg
Possible Impact of Poor Planning and Scheduling

An AGC Construction Learning Tool


Planned non productive time l.jpg
“Planned Non-Productive Time”

An AGC Construction Learning Tool


Steps in preparing and using a formalized project plan and schedule l.jpg
Steps in Preparing and Using a Formalized Project Plan and Schedule

  • Defining Work Activities

  • Determining Activity Durations

  • Determining Activity Sequencing or Logic

  • Adjusting Activity Durations for Contingencies

  • Obtaining Subcontractor Input

  • Drawing the Overall Project Schedule

  • Performing CPM Calculations

  • Using the CPM Schedule for Management Decisions

  • Performing CPM Calculations

An AGC Construction Learning Tool


Slide5 l.jpg

CPM Calculation Schedule

An AGC Construction Learning Tool


Update of schedule l.jpg
Update of Schedule Schedule

A

B

C

Planned Schedule

5

4

4

To Date Schedule

Update Date

6

Updated Schedule

6

5

4

Activity A: Completed:

(Show Actual Duration)

Activity B: In Progress:

(see calculation)

Activity C: Has Not Started

(Probably Show Planned Duration)

An AGC Construction Learning Tool


The one to four week look ahead schedule a supervisor s tool for increasing productivity l.jpg
The One- to Four-Week Look-Ahead Schedule: ScheduleA Supervisor’s Tool for Increasing Productivity

An AGC Construction Learning Tool


Daily short interval scheduling a foreman s tool for increasing productivity l.jpg
Daily Short Interval Scheduling: Schedule A Foreman’s Tool for Increasing Productivity

An AGC Construction Learning Tool