All Experimenters’ Meeting. November 28, 2011. Accelerator Operation Summary. From : November 21, 2011 (0000 hours) To: November 28, 2011 (0000 hours). Calendar Week # 47 NuMI Weekly Integrated Intensity 8.31E18 protons

Download Presentation

All Experimenters’ Meeting

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


All experimenters meeting

All Experimenters’ Meeting

November 28, 2011


Accelerator operation summary

Accelerator Operation Summary

From : November 21, 2011 (0000 hours)

To: November 28, 2011 (0000 hours)

Calendar Week # 47

NuMI Weekly Integrated Intensity 8.31E18protons

BNB Weekly Integrated Intensity 4.98e18protons

MTest Weekly Integrated Intensity 2.16e14protons

Beam Hours To NuMI134.00hours

Beam Hours To MiniBooNE130.40 hours


Status work completed plans

Status /Work Completed/Plans

  • Proton Source

    • KRFV Solenoid replaced: Bad power cable

    • BRF1 PA change out

    • LRF5 multiple component failure

    • LRF1 Driver Tube/Socket failure

    • Tuning

  • Main Injector

    • MI8 Line transmission: Possible vertical shunt problem

    • Studies and Tuning

  • NuMI

    • Two accesses to investigate air leak on absorber skid

    • Running Well

  • MiniBooNE

    • Access to change filter on RAW skid. Flow looks good now.

    • Running well

  • MTest

    • T-978 CALICE and T1012 TAUWER shared beam time

  • MTA

    • Ran: Beam Studies