CASE STUDY. NENAGH REGIONAL WATER SUPPLY PLANT. PUBLIC WATER SUPPLIES PERSPECTIVE. BOTTLED WATER USAGE in IRELAND = 0.3 million Litres / day NENAGH R.W.S.P. PRODUCTION = 7.5 million Litres / day NORTH TIPPERARY Co. Co. PRODUCTION = 26 million Litres / day.

Download Presentation

CASE STUDY

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Case study l.jpg

CASE STUDY

NENAGH REGIONAL WATER

SUPPLY PLANT


Public water supplies perspective l.jpg

PUBLIC WATER SUPPLIESPERSPECTIVE

  • BOTTLED WATER USAGE in IRELAND

    = 0.3 million Litres / day

  • NENAGH R.W.S.P. PRODUCTION

    = 7.5 million Litres / day

  • NORTH TIPPERARY Co. Co. PRODUCTION

    = 26 million Litres / day


Public water v s bottled water l.jpg

PUBLIC WATER V’s BOTTLED WATER


Supply treatment x l.jpg

SUPPLY√TREATMENTX


Slide5 l.jpg

NENAGH R.W.S.P.

COMMISSIONED - 1997

  • ISO9001 - 1998

  • HYGIENE MARK - 1999

  • Q – MARK - 2000

  • ISO14001 - 2003

  • E.T.P. - 2005


Nenagh regional water supply plant l.jpg

Nenagh Regional Water Supply Plant


Process chemicals l.jpg

PROCESS CHEMICALS

  • SPECIFICATION (Food Grade, Conc., Tolerance)

  • CERTIFICATE OF ANALYSIS

  • CHEMICALS FOLDER

  • SUMMARY RECORD

  • TRACEABILITY


Source water l.jpg

Source Water


Coagulation flocculation l.jpg

Coagulation & Flocculation


Process control l.jpg

PROCESS CONTROL

CHEMICAL DOSING

- 7 CHEMICALS

- VERIFICATION

- DAILY


Aluminium sulphate 8 l.jpg

Aluminium Sulphate (8%)


Log of changes to dose rates l.jpg

LOG OF CHANGES TO DOSE RATES


Enhanced coagulation l.jpg

ENHANCED COAGULATION


Dosing reference chart l.jpg

DOSING - REFERENCE CHART


Carbon dosing l.jpg

Carbon Dosing


Clarification filtration l.jpg

CLARIFICATION & FILTRATION

  • CLARIFIERS

    - 3 x 500 M3 Tanks

    - Upward Flow Rate (Max.) = 1.8 M/Hr.

  • FILTERS

    - 3 x R.G. Sand Filters

    - Filtration Rate (Max.) = 3.9 M/Hr.


Turbidity monotoring l.jpg

TURBIDITY MONOTORING


Post filtration l.jpg

POST - FILTRATION

  • CHLORINE DIOXIDE - Taste

  • CHLORINATION - T.H.M.

  • FLUORIDATION

  • PHOSPHORIC ACID - Enhanced Coagulation


Chlorine dioxide l.jpg

CHLORINE DIOXIDE


Chlorine control l.jpg

CHLORINE CONTROL


Inspection testing l.jpg

INSPECTION & TESTING

  • SAMPLING PLAN

    - SOURCE WATER

    - SETTLED WATER

    - FILTERED WATER

    - FINAL WATER


Final water cryptosporidium monitoring l.jpg

Final WaterCryptosporidium Monitoring


Continual improvement l.jpg

Continual Improvement

  • Key Performance Indicators (K.P.I.)

    - Process

    - Quality

    - Cost

    - Environmental

    - External Audit Results ( eg. H-Mark Score)


Issues l.jpg

Issues

  • Process Chemicals - data

  • CAR’s - review

  • Paperwork - volume

  • Design- practical


Slide36 l.jpg