The Nosecone Calorimeter People, Management, Funding, Schedule. R. Seto Yonsei University Seoul, Korea Nov. 16, 2005. schedule. November 16th (Wednesday) 10:30 - 11:00 I.H. Park (Ewha) : Status of Silicon Fabrication in Korea 11:00 - 11:30 S.W. Nam (Ewha) : CREAM Silicon Detector

Download Presentation

The Nosecone Calorimeter People, Management, Funding, Schedule

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


The nosecone calorimeter people management funding schedule

The Nosecone CalorimeterPeople, Management, Funding, Schedule

R. Seto

Yonsei University

Seoul, Korea

Nov. 16, 2005


Schedule

schedule

  • November 16th (Wednesday)

  • 10:30 - 11:00 I.H. Park (Ewha) : Status of Silicon Fabrication in Korea

  • 11:00 - 11:30 S.W. Nam (Ewha) : CREAM Silicon Detector

  • 11:30 - 13:00 Lunch

  • 13:00 - 13:30 R.K. Seto (UCR) : Introduction and Physics Motivation

  • 13:30 - 14:15 E. Kistenev (BNL) : Design of the NCC

  • 14:15 - 14:45 RKS/EK (UCR/BNL) : Performance

  • 14:45 - 15:00 Coffee Break

  • 15:00 - 15:30 E. Kristenv (BNL) : R and D Progress

  • 15:30 - 15:45 R.K. Seto (UCR) : Money, Schedule etc

  • 15:45 - 16:00 J.H. Kang (Yonsei) : Manpower and Funding in Korea

  • 16:00 - 17:00 Tasks ahead (EK/RKS) and Discussion

  • 17:00 - 19:00 Dinner

  • November 17th (Thursday) – Visit SENS and ERTI


Collaboration

USA

BNL:lab

Physics (Management, Design, Integration, engineering etc)

Chemistry (DAQ, electronics)

Instrumentation (engineering, Gamma/pi0 design, front end chip)

UCR (Simulations, management, software)

ISU (Trigger, Simulations)

UIUC (Simulations, Physics ideas)

Nevis (chi – FEE readout)

Korea (Si- pads/gammapi0)

Yonsei

Ewha

SENS: company

ERTI:company

Japan

Riken (lab)

Czech Republic (Gamma/pi0 testing, constuction)

Charles U

Academy of Sciences

Prague Tech U

ON semiconductor:company

Russia

Moscow State U (Si pad design, testing, engineering)

JINR-Dubna – 2 groups (lab) (Engineering, Mechanics, tungsten, assembly)

MEPHI (front end electronics)

Ekaterinbourg (company- board assembly)

RIMST-ELMA (company-Si construction)

Collaboration


Management plan

Management Plan

  • Operate in the structure of PHENIX

    • The “Forward upgrades group” meets and works together (RKS chairs meeting now)

      • Muon Piston Calorimeter (3<eta<4) : going in now

      • Muon spectrometer trigger (NSF MRI funding)

      • NCC

  • We will have to work out a management structure – once we have all the responsibilities assigned

    • For construction (EK)

    • For Money DOE/Riken/Other (RKS)


Phenix view of rhic upgrade plans

40x design luminosity for

Au-Au via electron cooling

Commissioning

Long term upgrades

FVTX, TPC/GEM, NCC

PHENIX view of RHIC Upgrade Plans

Long term: full detector

and RHIC upgrades

Near term: Base line

Medium term: first upgrades

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Analysis of

data on tape

Near term detector

upgrades of PHENIX

TOF-W, HBD, VTX , mTrig

RHIC luminosity upgrade

PHENIX upgrades

Full utilization of RHIC opportunities:

Studies of QGP with rare probes:

jet tomography, open flavor,

J/, ’, c, (1s), (2s), (3s)

Complete spin physics program

p-A physics

RHIC baseline program

Au-Au ~ 250 mb-1 at 200 GeV

Species scan at 200 GeV

Au-Au energy scan

Polarized protons  150 nb-1

Extended program with 1st detector upgrades:

Au-Au ~ 1.5 nb-1 at 200 GeV

Polarized p at 500 GeV

(start p-A program)


Ncc funding

NCC Funding

  • Small amount of funding so far for R and D

    • Riken, UCR, BNL, Local Russian funding for themselves, Czech for themselves (a fair amount)

  • What do we need?

    • R and D

    • I claim with $3M in cash we can build one side, with $7M we can build both sides

      • this might change as we do a better cost estimate in the next month

    • Purchasing Si and W now (~200K worth Riken)

  • Major funding

    • Riken $1M-$3M

    • DOE ~$4M - $4.5M

    • Other ~$1M

  • Major question - timing


Ncc upgrade schedule scenario eob to bnl management oct 2005 rks in loi

NCC Upgrade Schedule ScenarioEOB to BNL management: Oct 2005, RKS in LOI

Today

DOE, Japan, Russia,Czech ($4.0M+$4.0M+$0.5M???)

doesn’t match funding schedule

NCC2

Operational

NCC prototype 1

test

NCC prototype 2

test

Begin NCC1

Construction

NCC1 operational

R&D Phase

Construction Phase

Ready for Data


Ncc upgrade schedule scenario updated nov 2005

NCC Upgrade Schedule Scenarioupdated Nov. 2005

Today

DOE, Japan, Russia, Czech, other ($4.0M+$1 to 3M+$1M???)

NCC1

operational

NCC prototype 1

test (Protvino)

NCC prototype 2

test

Begin NCC1

Construction

NCC2

Operational

R&D Phase

Construction Phase

Ready for Data


Ncc cdr

NCC CDR

  • We want to appear in the 2007 budget

  • Need CDR to DOE by Feb

    • Dec – CDR to collaboration

    • Jan – review by BNL


Cdr writing reading team

Readers

PHENIX folks

Ahbay - spin, and pA

Ed Kinney - Spin

Atsushi - lots of it (design etc)

Matthias - lots of it.

Ken – spin

Miraslov Finger (Charles Univ)

Outside folks

Raju Venugopalan (pA - saturation)

Mark Strickman - nucleon strucutre

Dima Kharzeev

Writers

RKS

EK

Mickey (spin)

Ken (spin)

Jen-Chieh (pA and nucleon structure)

Mark Strikman (pA and nucleon structure)

John L (hard scattering)

jamie (charm and chic)

Stefan (gamma-jet)

Could use another person in each of spin, heavy ion, pA

CDR writing/reading team


Cdr outline

1. Executive Summary (RKS)

2. Physics Overview

(a) Heavy Ion Physics

i. Gamma-jet (John L I hope)

ii. Chic (Jamie)

iii. charm (Jamie)

(b) pA collisions and the CGC (Jen-Chieh+R. Seto)

i. direct photons

ii. dileptons

iii. hadrons

iv. jets

(c) Spin Structure of the nucleon (Mickey - how much?)

i. W

ii. Delta G Gamma-jet

iii. Transversity

(d) Nucleon structure (Jen-Chieh)

3. Physics Measurements with the NCC (RKS)

(a) Performance

i. Pi0

ii. Photons

iii. Electrons

iv. Jets

(b) Physics reach

i. Heavy Ion Physics

ii. Spin Structure

iii. Nucleon Structure

(c) Physics reach with the all Upgrades

CDR Outline


Outline cont

4. The design of the NCC (EK)

(a) Overview

(b) The Calorimeter

(c) Gamma pi0 detector

(d) Electronics

(e) Mechanics and Cooling

(f) Integration

(g) Triggering

5. R and D (EK)

6. Project Management and Responsibilities (RKS)

(a) Overview

(b) Management Structure

(c) Responsibilities

7. Budget and Schedule (RKS, EK)

(a) Total Estimated Cost (TEC)

(b) Contingency Analysis

(c) Overhead

(d) Budget

(e) Fiscal Responsibilities

(f) Schedule

8. Appendices

outline (cont)


Schedule in the next couple months

Schedule in the next couple months

  • CDR

    • Skeleton in CVS (CVS co offline/analysis/NCCCDR)

    • Major tasks

      • Writing

      • Cost estimate

      • Timeline

    • Dec ~4 CDR to collaboration

      • EC/DC etc review

    • Jan

      • BNL Review

    • Feb – To DOE

  • Beam Tests – now at Dubna (Vasily/Andrei with Merkin, Litvinenko etc) beam test 9th to 13th (1st prototype)

  • Korea Trip Nov 14-18 – EK/RKS

  • In the next year

    • Large prototype being designed (with gamma/pi0)

    • Full electronics


The nosecone calorimeter people management funding schedule

END


The nosecone calorimeter people management funding schedule

Commission

NCC proto 1

Old Gannt chart from LOI


Upgrade schedule scenario eob to bnl management

Upgrade Schedule ScenarioEOB to BNL management

R&D Phase

Construction Phase

Ready for Data