An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CDT Core Decision Technologies, Inc. Learning From the Past and the Present Those who refuse to learn from the past are doomed to repeat its failures. Presented by D.E. Moon

  2. Prediction/ Knowledge Information Decision Lets Put Inventory Data Into Perspective The Knowledge Progression Organization Interpretation Criteria Data Analysis Integration/Model Process

  3. A Brief History of Land Resource Inventory in Canada • 1950s • Traditional agricultural soil inventories • 1960s • Canada Land Inventory (external paying client) • Systematic, 1:250K nation wide land capability • Forestry, Agriculture, Recreation, Wildlife • Based on climatic zonation, distribution of landscapes with in zones, and soils within landscapes • Criteria, procedures, data, and products were clearly defined before the inventory was started. • It was very well done in only 10 years

  4. A Brief History (cont.) • 1970s • Upgrade of CLI maps to “1:100K, Multi-purpose Soil Inventories” (sold on the success of the CLI) • sold as a one time effort because soils are stable! • able to answer a wide range of suitability questions! • Landscape / hydrology / genetic bias, soil associations • modal data, many attributes, few sites • beautiful, well edited, technical reports and maps • when potential clients came to us, we could not answer their questions. And so closed the 70s.

  5. A Brief History (cont.) • 1980s • we told potential clients that we could not answer their questions because we needed more detail • we moved from 1:100 K to 1:20K and • we tried to answer everything! • at 10-20x the cost of answering the clients question • and the extra questions were answered poorly 1987 brought the closure of the B.C. Soil Survey program, the largest provincial soil inventory program in Canada

  6. Decision Knowledge/ Prediction Information Data To here, Decision Knowledge/ Prediction Information Data We had moved from here, a few decisions based on sound data. many decisions based on unsound/inappropriate data.

  7. A Brief History (cont.) • 1990s • Reverse Direction • 1:1 million Soil Landscapes of Canada • minimum data set but complete national coverage • But we had large gaps in coverage and data • missing coverage mapped with no verification • missing data estimated by expert systems or regional regressions applied nationally • We now claimed to have complete national coverage and were ready to answer questions!

  8. A Brief History (the final chapter) • 1994 • We got a real, internal client. It needed indicators of environmental sustainability • indicator procedures were developed by our scientists • our “data” was evaluated but found wanting • “pedo-transfer” functions were developed by inventory experts to infer required parameters from our previous estimates • resulting in an internally contradictory, dialectical dis-unity • e.g. we had more soil water than voids to hold it

  9. A Brief History (the epilogue) • 1995 • National Soil database supported by a National Research Centre • 120 FTEs, 11 Regional Offices • Annual Budget $ 13 million • 1997 • Supported by a section of a regional research centre • 11 FTEs • Annual Budget $ 0.5 million

  10. The final irony • 1997 • Statistics Canada launched a program to recover the digital database for the 1970s Canada Land Inventory. • Why? • It provides complete national coverage • It allows comparison of resource values • It is consistent, non-contradictory, and does what it was designed to do • It is better than anything produced since!

  11. So were we stupid or what? • The closure of the Province of B.C.’s soil survey program in 1987 was a wake up call for some but not many. • We tried a number of things. • We looked at our clients, • we looked at our mandate, • how we did our jobs, • how we packaged the results, and • how we promoted our products.

  12. Our clients • Until the end, the inventory community was our only paying client therefore, until the end • we defined our own needs, • defined our own procedures, • set our own priorities, • performed our own QA/QC • did our own evaluations • Boy did we look good!

  13. Our mandate • Our job was to collect and interpret land resource data (we decided for what purpose). • We convinced senior management that our products were widely needed. In the end, we did not deliver and had no real clients. • We believed that we knew what potential clients needed better than they did. • We were, after all, the land resource experts!

  14. How we did our job? • We actually did evaluate some of our inventory procedures. • Map units (what we drew lines around). • Inventory procedures (cost effectiveness). • Data management procedures and systems. • Reliability. • The results failed to inspire confidence so, • they were deemed non-representative and irrelevant.

  15. How we packaged it • We moved to “Productization” • standard map and report formats • standard interpretations • standard packaging • computer automation • electronic distribution • promotion and advertising but • we still had inappropriate, inaccurate, and incomplete data that could not answer client’s questions reliably.

  16. So what was missing? • Paying clients (who could hold us accountable). • With real problems and needs to provide direction! • When we finally accepted a client (1994) • We let them define the problem. • We adopted or developed procedures to solve them. • We did a functional analysis to determine data needs • and we discovered that we did not have the required data. • Too late. We had told everyone that we had the data, so we made it up. • So was it all inevitable. No!

  17. What should we have done? • Determined what we could reliably map • Not what we wanted or hoped to map. • Found a formal client with clear objectives. • One to whom we would be accountable. • Involved the client in defining deliverables • Determined the degree to which we could meet the client’s needs and at what costs.

  18. Been honest about: • what we could and could not do, and • what was really needed to answer the question. • Imposed rigorous internal & external QA / QC. • Put the client’s, not our own needs and aspirations, first. • Conducted follow-up • How well were the clients needs being met. • How could the needs have been better met.

  19. Why Did We Fail? • Management reasons • Technical reasons • Political reasons • Human resource reasons • Human nature reasons

  20. Management Causes • Mandate was inventory not decision support. • Not tied to departmental business functions. • Project approval was based on internal priorities. • No external clients or accountability. • Inappropriate performance criteria. • No executive commitment to needed change.

  21. Technical Causes • Interpretations and decision support were secondary and, therefore, poorly served. • We had spent a bundle in the 60’s and 70’s on • Soil classification • the only national taxonomy in Canada • Soil interpretation • Every thing from crop suitability to suitability for septic fields based on site data • and we were damn well going map it. • at scales of 1:15K to 1:1Million

  22. Legacy systems constrained progress. • Designed to do the wrong thing but since the systems were available we continued to use them. • Data which the legacy systems did not handle were ignored, generalized, or forced to fit. • Decision support procedures which the systems could not handle were rejected.

  23. Political causes • Line and middle management power politics (aided by senior management’s lack of commitment to change). • managers feared the success of subordinates who were allowed to use new skills and techniques, • managers feared loss of control if they could not develop or master the new procedures, • managers feared that the introduction of new procedures would imply that the previous procedures were wrong.

  24. Human Resources • Demographics. • last significant staffing was late 1970s. • academically qualified people not available. • staffed rather than lose the position. • indoctrinated new staff into the current system. • present managers were the product of 1970s indoctrination. • attitudes and positions of 1970s and 1980s became entrenched and then retrenched. • Note similar conditions in information technology today.

  25. Human nature • Fear of no longer being able to do their job. • Fear of losing hard won intellectual equity if it is made obsolete by new procedures. • Fear of losing professional status and influence if no longer “the expert”. • Resistance to learning new ways of doing what you already know how to do.

  26. So what else should we have done? • Commit to adaptive change (senior and middle management). • Develop a client-centric mode of operation. • Let them define their problems. • Jointly develop procedures to solve the problems. • Develop relevant performance measures. • Reward innovation and adaptive change. • Incorporate client satisfaction. • Require rigorous problem analysis.

  27. Learning from the Present? • Your present is looking a lot like our past. • High credibility based on success of BEC zones and sub-zones and identification of site-series. • You have a tremendous volume of legacy data • They are at best suspect, at worst wrong, and most probably inadequate. • You are being pressured to use it to answer today’s site management questions at low cost. • You are selling an untested product. • Wanting and believing does not make it so.

  28. Highlights of a Problem Analysis of Input Data Quality for PEM • An initial assessment of input data quality identified potentially serious problems with: • spatial accuracy and resolution • thematic accuracy and resolution

  29. Spatial Issues Terrain Overlay A7B3 Spatial Overlay X5Y5 Soil A7B3 X5Y5 Alluvial fans that should correspond.

  30. Thematic Issues • Compound map unit overlay • AX from 21% to 50% • AY from 21% to 50% • BX from 0% to 30% • BY from 0% to 30% X5Y5 A7B3

  31. Thematic Reliability • Estimate and 95% Confidence Interval for the area of defined Error Classes

  32. Approach to an Input Data Evaluation Framework • Documented mapping concepts used in inventories • map units and reliability • Documented the elements of data quality • spatial and thematic • Defined the effect of mapping procedures ondata quality • Specified the meta-data required to evaluate data quality and we then • Developed a framework and criteria for evaluating data inputs to PEM

  33. Conclusion • Input data quality is highly variable. • The strong appeal of PEM will require a tightly reasoned, widely accepted input data evaluation framework if it is to have wide acceptance and application. • The framework developed in the Input Data Quality Report provides an effective basis for both PEM input and PEM output data quality evaluation.

  34. Knowledge-based systems • Knowledge-based systems incorporate data and information with rules, relationships, probabilities, and logic or models to: • predict outcomes • support decisions • classify unknowns • identify new relationships and patterns

  35. Examples of older and current knowledge-based systems • Taxonomic models (intuitive, empirical, no causality) • Statistical models (empirical, no causality) • Process models (causal, no feedback) • Systems models (causal with feedback mechanisms) • Expert systems (heuristic, no causality) Eldar • Artificial neural networks (non-rigorous statistics) • Belief matrixes and decision trees (heuristic) Ecogen

  36. The new knowledge paradigm • Ontology • A representational vocabulary for a shared domain of discourse – definitions of classes, relations, functions, processes and other objects. • Ontologies will be the basis for knowledge integration • analogous to data dictionaries and data models for data management and integration.

  37. Knowledge management • The definition and maintenance of knowledge standards and protocols is a necessary precursor to knowledge management. • The management of knowledge-based systems will require: • a knowledge syntax and semantic lexicon • domain ontologies for the knowledge area

  38. The current situation • Knowledge management is following an evolution similar to data and information management. • Many organizations are building knowledge bases in an uncoordinated and ad hoc manner. • There is growing recognition of the need for and value of knowledge sharing and reuse.

  39. The current situation • As with data management, the major impediments to knowledge sharing and reuse are: • inconsistent concepts, definitions, terminology, structures, and formats • in addition there is no standard syntax or semantic of inference to support communication • standards and protocols to enable knowledge sharing and reuse are only just emerging

  40. Conclusions • It is feasible to establish a generic knowledge structure that will accommodate most, if not all, evolving knowledge models including those used in TEM and PEM • this structure would be able to store, retrieve and share disparate knowledge bases. • integration into a true knowledge management system with a common syntax and semantic of knowledge inference and retrieval is also feasible but would be much more difficult and costly.

  41. Conclusions • The generic knowledge structure would accommodate the ontology of TEM and PEM approaches • the ontology would include the definitions of classes, concepts, relations, functions, and processes assumed to produce the classes recognized in the TEM classification and would also accommodate the inferences used in PEM.

  42. Our end, your beginning?

  43. When interpretation was attempted we discovered that: • Although the maps were reasonably accurate, • the necessary data had not been collected, or • the data was in the wrong format, or • we had used the wrong method of analysis, or • class limits, or precision were inappropriate, or • the map units and scale severely limited the site specificity of the interpretation (e.g. a wide range of response could be expected in most polygons).

  44. Agriculture Land Reserve • Survey cost $ 3-10 million • reliability of predicting reserve status 92% • Post completion we did a pilot project using air photo interpreted land use as an indicator of reserve status • the reliability of reserve status was 96%. • The estimated cost of full survey $ 0.3 million

  45. Now when interpretation was attempted we discovered that: • The necessary data had been collected, • the data was in the correct format, • we had used the appropriate method of analysis, and • we had used appropriate soil definitions, class limits, and precision for the required interpretations, but

  46. map units and scale were still inappropriate • Compound map units (TEM convention) gave conflicting interpretations • The maps were unreliable • Thematic reliability < 30% • Mappers were restricted to naming 3 soils • Maps had a modal value of 7 soils / polygon • Interpretations required greater precision than could be mapped at 1:20K

  47. Minimum data set • Review of National Soil Database • average of 2,500 attributes per site • about 12,000 sites • only 10 attributes were used routinely in interpretations • only 30% of data sets had all 10 • collection of these 10 takes about 1/8 - 1/4 of the field time and 1/20 of the lab costs. • deemed inappropriate to collect missing data!

  48. Selling the Product • We used models developed at the plot level (10 m2) to make predictions at 1: 1 million (10 – 50 km2) • Average polygon had 10 – 30 major soils • Algorithm accessed 1 detailed soil description and extrapolated the results to 10s of polygons and hundreds to thousand of hectares. • The required data was most frequently estimated. • One enterprising fellow sold Health Canada on a 1:1 million map of suitability for carcass burial.

  49. Requirements Data Inventory • Understand the questions to be answered. • Determine the data needed to answer the questions. • Evaluate existing data for adequacy. • It may be that a sub-optimal but adequate procedure can be developed for existing data. • It may be that adequate data does not exist and must be collected. • If the needed data cannot be collected at appropriate cost and reliability, the requirement cannot be met. • Look for alternative approaches. • It did not matter how badly Regan wanted star wars, it just could not be built.