1 / 18

Revised TCE Fact Sheet (a.k.a. “Status Update”) Q&A’s & Template IH Notice Form

Revised TCE Fact Sheet (a.k.a. “Status Update”) Q&A’s & Template IH Notice Form. March 27, 2014 Paul W. Locke MassDEP Bureau of Waste Site Cleanup (617) 556-1160 Paul.Locke@state.ma.us www.Mass.Gov/dep. Trichloroethylene in Indoor Air. New Toxicity Information

phuc
Download Presentation

Revised TCE Fact Sheet (a.k.a. “Status Update”) Q&A’s & Template IH Notice Form

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Revised TCE Fact Sheet(a.k.a. “Status Update”)Q&A’s & Template IH Notice Form March 27, 2014 Paul W. LockeMassDEP Bureau of Waste Site Cleanup(617) 556-1160Paul.Locke@state.ma.uswww.Mass.Gov/dep

  2. Trichloroethylene in Indoor Air • New Toxicity Information • Implications for Even Short-term Exposure • MassDEP Waste Site Cleanup requirements for “Imminent Hazards” • MassDEP Approach to Quickly Reduce Exposure • New Guidance Available

  3. New TCE Toxicity Values • 2011 EPA released new “Reference Concentration” or RfC of 2 µg/m3 • 2 µg/m3 is safe for short- and long-term exposure • RfC considers developmental effects (fetal cardiac malformations) that may occur after only a few days exposure during early pregnancy • RfC based on animal studies with supporting human epidemiology

  4. At what point above 2 µg/m3 is TCE exposure a concern pregnant women? • USEPA has not yet developed guidance for evaluating short-term TCE exposure with new RfC • MassDEP raised the issue with its Health Effects Advisory Committee • Short-term levels of concern identified for • Women who may be in their first trimester of pregnancy; • General population; • Residential settings; and • Workplace settings

  5. New Fact Sheet

  6. TCE short-term Levels of Concern for Sensitive Receptors Residential & Workplace Scenarios

  7. TCE short-term Levels of Concern for All Residential & Workplace Scenarios

  8. TCE short-term Levels of Concern for Sensitive Receptors • TCE concentrations found to be well above the IH criteria • exceeding 20 μg/m3 in a home; or • exceeding 60 μg/m3 in a workplace • DEP recommends considering additional short-term options – such as temporary relocation - for reducing or eliminating exposures to women who may in their first eight weeks of pregnancy while response actions are developed and implemented.

  9. Implications for Waste Site Cleanup • Rules: Massachusetts Contingency Plan (MCP, 310 CMR 40.0000) • “Vapor Intrusion” = migration of contaminants into indoor air from soil or groundwater • MCP defines “Imminent Hazard” to be conditions posing a significant risk for even a short period of time • Exposure to TCE in indoor air may posean “Imminent Hazard” requiringimmediate action.

  10. Required Response to “Imminent Hazards” • Must be reported to DEP within 2 hours • Triggers Immediate Response Action (IRA) to eliminate or reduce exposures • MassDEP approves (oral/written) IRA’s • IRA includes notice to Chief Municipal Officer and Board of Health • IRA includes notice to affected individuals

  11. Response to TCE Imminent Hazards • Actions put on accelerated schedule, including: • Immediate implementation: • Ensure appropriate Fact Sheets are provided to Affected Individuals; • Vent the basement or lowest level of the building by opening windows; • Seal cracks/utility annular spaces in bottom floor of building and subsurface walls; and • Enclose and passively vent sumps.

  12. Response to TCE Imminent Hazards • Implemented as soon as possible, but which may require several days to two weeks to arrange: • Adjust the HVAC system • Install carbon filtration on HVAC system; and • Bring portable air-purifying units (APUs) to the affected building

  13. Response to TCE Imminent Hazards • Implementation as soon as possible, but which may require several weeks to two months to design, construct and test: • Installation of a sub-slab depressurization system • Installation of air-to-air heat exchanger to over-pressurize the basement • Installation of a soil vapor extraction system

  14. DEP Guidance Available Onlinehttp://www.mass.gov/eea/agencies/massdep/toxics/sources/chemical-research-and-standards.html • A Fact Sheet, “TCE Toxicity Information: Implications for Chronic and Shorter-Term Exposure” targeted to the regulated community; • Two sets of “Frequently Asked Questions”, for residential and workplace exposures, to address concerns raised by individuals who live and work in buildings affected by the TCE contamination; • A template for public notices that are required at sites where actions are being taken to address Imminent Hazards; • Documentation of MassDEP’s review of the USEPA’s toxicity values for TCE and the Department’s advisory committee recommendations for addressing short-term exposure; and • Technical guidance (existing): “Interim Final Vapor Intrusion Guidance”