An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spanish Photovoltaic Development 6 & 7th October 2005 Catania Lucía Dólera Asociación de la Industria Fotovoltaica

  2. Phovoltaic Solar Energy in Spain.Historical

  3. Historical PV Stages in Spain STAGE 3 STAGE 1 STAGE 2 -Off Grid: with subsidies -Connected: Financing + Feed in tariff -Off Grid: Subsidies -Connected: exceptional -Off Grid: Subsidies -Connected: Subsidies + Feed in tariff 1990 2005 Renewable Plan (PFER) 1998 RD 2818/1998 1999 Renewable Promotion Plan (PFER) 1994-1995 Toledo PV 2004 RD 436/2004

  4. First Stage (1990…1999): Grid connected instalations: Excepcional Off Grid : Subsidies Second Stage (1999…2004): Grid connected instalations: Subsidies, Financing (ICO-IDAE from 2002), Feed in Tariff Off Grid : Subsidies Third Stage (2005….): Grid connected instalations: Financing (ICO-IDAE), Feed in Tariff Off Grid : Subsidies Historical PV Stages in Spain

  5. PV Economical System. Comparative INCOME RD 2818/1998 ? Feed in Tariff until 50MW installed in Spain Years INCOME RD 436/2004 Years

  6. PV Economical System. Stage 2 (1998-2004) Cumulative income with RD 2818/1998 ? Feed in Tariff until 50MW installed in Spain Additional help ICO-IDAE subsidies and from 2002 financing…

  7. PV Economical System RD 436/2004. Stage 3 Cumulative income with RD 436/2004 Additional help ICO-IDAE Financing… Pay back ~12 years

  8. Feed in tariff drop RD 436 vs RD 2818 Feed in Tariff (first 25 years) PV Inverter Capacity (kW) RD 2818/1998, maximum feed in tariff up to 5 kW RD 436/2004, maximum feed in tariff up to 100 kW

  9. Targets Plan de Fomento de las Energías –PFER- 1999 vs Plan de Energías Renovables –PER- 2005

  10. Capacity Targets: PFER 1999 vs PER 2005

  11. - Photovoltaic approved projects (2001 to 2004) Results from the ICO-IDAE PV line - Comparative results from the ICO-IDAE line (2003 & 2004)

  12. The Spanish market presents a continuos rapid growth sustained at the 50% P.A. level. The prospects for the next future as per the Plan de Energías Renovables 2005-2010 –PER-, look forward for additional continuos growth at even higher levels. During the last years, a direct correlation between the amount given by the ICO-IDAE and the actual MW installed in Spain in each period, can be observed. This is a clear indication of the key-role played by this state support instrument. The role of ICO-IDAE should continue in different desings adapted to the new times to continue being a key instrument in our success of being part of the global efforts of developing this clean new way of doing electricity. THANK YOU FOR YOUR ATTENTION! Final Considerations