SINPHONIE Project kick-off meeting 10-12 November, REC Conference Center, Szentendre Hungary

WP3.1 Characterization of the school buildings. SINPHONIE Project kick-off meeting 10-12 November, REC Conference Center, Szentendre Hungary Gabriela Ventura Silva, IDMEC-FEUP. O verview of the presentation. Objectives Partners involved Actions and deadlines

phong
Download Presentation

SINPHONIE Project kick-off meeting 10-12 November, REC Conference Center, Szentendre Hungary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP3.1 Characterization of the school buildings SINPHONIE Project kick-off meeting 10-12 November, REC Conference Center, Szentendre Hungary Gabriela Ventura Silva, IDMEC-FEUP

  2. Overview of the presentation • Objectives • Partners involved • Actions and deadlines • Proposals on content of check-lists • Selection of the schools – suggestion of criteria

  3. Objectives • Collect data on aspects that potentially contribute to poor IAQ in the selected 120 schools (general building characteristics, maintenance, HVAC systems, cleaning, water damaged/dampness, etc). The information will provide highly relevant background to understand the results of the field tests and to assess IAQ problems in European schools; • Organize and provide data to WP3.2, WP3.3 and WP3.4; WP4.1 and WP4.2; and also WP5 and WP6.

  4. Partners involved (31) • HPI • THL • CSTB • UBA • UOWM • NKUA • UMIL • USiena • CNRPalermo • KTU • UMalta • IOMEH • UAVR • UBB • TNO • HVDGM • NILU • PHA-SK • IV • UCL IDMEC-FEUP NIEH JRC IPH-ALB IPH-BH UBA-A VITO LABOREX LGH CSGL NPHI-CZ

  5. Description of the work Task 1: Development of school and classroom checklists for characterization of the school buildings and classrooms (building materials, ventilation systems, furnishings and fittings, cleaning products, outdoor sources, etc.) to provide sufficient descriptors to compare and characterise the buildings; Task 2: Inspection and characterization of the school buildings and selected classrooms. Some parts of the checklist can be completed by the research team in advance (either from documentation obtained about the building or by site visit), and some need to be completed with the help of a building manager or equivalent.

  6. Deliverables to be produced According to the initial plan on master task 1: month 4 – month 9 We propose to start on month 3 (December) and finish at month 6 (final March) D 3.1.1. School and classroom checklists (Month 9) D 3.1.2. Data on school and classroom characterization (Month 18)

  7. Actions and deadlines

  8. Content of the school checklists Localization (orientation, outdoor sources, ….) Historic of the building (year of construction, year of refurbishing, important modifications (painting, new floor, etc..)) Physical characterization of the building(area, height of ceiling, number of storeys, number of occupants….) Construction techniques (double or single wall, insulation thickness, double glass, type of ceiling…)and construction materials (brick or concrete, type of windows frame,…) Indoor Building materials (floor covering, wall covering,…)

  9. Content of the school checklists Status of conservation of the Building (leaks, condensation, molds,…) Heating Systems (kind of heating, kind of fuel used for space heating production,….) Ventilation Systems (natural or mechanical ventilation, type of mechanical ventilation, duct material,duct insulation,position of ventilation system intake…) Activities in Building (cleaning activities, disinfection activities, use of photocopiers, printers, handcraft products used,…)

  10. Selection of the schools – suggestion of criteria • Should a limitation exist on the building factors that influence IAQ? For example define a limit on: • Year of construction, year of last re-construction (happened at more than 1-2 years?) • Existence of particular indoor sources in the school: kitchen, garage, … • Or should the schools selected cover the maximum of factors influencing IAQ?

  11. Selection of the schools – suggestion of criteria • Should the selected schools be public or private? • In our opinion should be public! • At least one of the selected schools per country should have mechanical ventilation in order to accomplish with the defined in WP4.2 (page 52 of the master): • “These will include at least 8 schools with mechanical ventilation, to compare the effects of different environmental conditions on the irritative responses of schoolchildren;”

  12. Selection of the schools – suggestion of criteria • Should the criteria of selection within each country cover the topics suggested in the call? For example define for each country schools on: • Rural zone/Urban zone • Urban zone with very heavy traffic/Urban zone green/ Urban zone industrialized • Interior zone/Maritime zone • Or should the criteria of selection be applied to the climatic zones?

  13. Selection of the schools – suggestion of criteria • We need answers from all the partners, but in particular from the partners and leaders of WP3.4 and WP5: WP3.4 Environment context and modelling • Task 1: Impact of traffic on IAQ WP5 Data management, cross analysis & database • Task 4. Source Analysis, that includes the objective: Assess the influence of building characteristics and ventilation systems in exposure data obtained in WP3.2 and WP.3.3

  14. Thank you!