An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meadowbank Gold ProjectCumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006

  2. Meadowbank Gold ProjectNIRB Final Hearing 1. DFO Mandate 2. Key Issues 3. Conclusion Outline

  3. Meadowbank Gold ProjectNIRB Final Hearing To conserve and protect fish and marine mammals and their habitat for all Canadians • Applicable Legislation • Fisheries Act • Species at Risk Act • Nunavut Land Claims Agreement Mandate

  4. Meadowbank Gold ProjectNIRB Final Hearing • Fisheries Act: • s.35 – prohibits the harmful alteration, disruption or destruction (HADD) of fish habitat unless authorized by the Minister of Fisheries and Oceans or regulation • s.20 – requires safe fish passage • s.22 – requires sufficient flows • s.30 – requires intakes screens and fishguards • s.32 – prohibits destruction of fish by means other then fishing • s.36 – prohibits the deposit of a deleterious substance, unless authorized under regulations such as the Metal Mining Effluent Regulations Regulatory Role

  5. Meadowbank Gold ProjectNIRB Final Hearing Policy for the Management of Fish Habitat • Guides DFO in the administration of the habitat protection provisions of the Fisheries Act • Overall objective is the Net Gain of fish habitat • Achieved through three goals: • Conservation, which includes the No Net Loss Principle • Restoration • Development • Supported by eight strategies

  6. Meadowbank Gold ProjectNIRB Final Hearing • Project Alternatives • Water Quality • Fish and Fish Habitat • Marine Environment • Cumulative Effects • Other Issues Intervention Comments

  7. Meadowbank Gold ProjectNIRB Final Hearing • Preferred location is northwest arm of Second Portage Lake, a fish-frequented waterbody • DFO’s Analysis and Assessment: • Alternatives Assessment consistent with DFO Hierarchy of Preferences • Consideration of impacted fish habitat Project Alternatives – Tailings Impoundment Area • Recommendation: • Cumberland provide a revised No Net Loss plan, monitoring plan and construction details, prior to DFO recommending to EC Second Portage Lake be listed under Schedule 2 of MMER.

  8. Meadowbank Gold ProjectNIRB Final Hearing • Implementation of re-flooded pits as fish habitat subject to suitable water quality • DFO’s Analysis and Assessment: • Re-flooded pits represent significant portion of Cumberland’s No Net Loss plan • Contingencies to ensure No Net Loss Water Quality – Fish Habitat Compensation • Recommendation: • Cumberland provide contingencies to ensure No Net Loss of fish habitat will be achieved

  9. Meadowbank Gold ProjectNIRB Final Hearing • Cumberland will sacrifice larger fish for baseline data and provision to community, and transplant smaller fish to project lakes • DFO’s Analysis and Assessment: • Satisfied with the approach presented by Cumberland • Opportunity to improve knowledge of project fish populations Fish – Fish Salvage • Recommendation: • Cumberland develop, implement and report the results of the fish salvage program, in consultation with DFO and other interested groups • Cumberland optimize program design to improve baseline data for No Net Loss plan design and monitoring

  10. Meadowbank Gold ProjectNIRB Final Hearing • Impacts to fish and fish habitat will be limited • DFO’s Analysis and Assessment: • DFO unable to verify impacts to fish habitat at the shoreline • Conflicting statements regarding water volume Fish and fish habitat – Freshwater Intake • Recommendation: • Cumberland avoid infilling shoreline fish habitat and provide detailed plans for pipe installation during regulatory phase • Cumberland seek a Fisheries Act s.30 approval for water intake screen

  11. Meadowbank Gold ProjectNIRB Final Hearing • Standard water crossing design and best management practices will limit impacts to fish habitat • DFO’s Analysis and Assessment: • Limited hydrology data at water crossings • No monitoring and maintenance plan Fish habitat – All-weather road water crossings • Recommendation: • Cumberland consider span bridges for fish streams • Cumberland provide hydrology data to verify fish passage in stream crossing designs • Cumberland develop a monitoring, maintenance and closure plan

  12. Meadowbank Gold ProjectNIRB Final Hearing • Modifications to easternmost channel to address altered flow between Third Portage and Second Portage Lake and loss of fish habitat • DFO’s Analysis and Assessment: • Details on channel modifications not provided • Details on adaptive water flow management not provided • Unable to verify benefits of proposed fish habitat enhancements Fish habitat – Easternmost channel • Recommendation: • Cumberland to provide adaptive management framework for water flow and detailed design of any channel modifications • Cumberland to monitor water levels in Third Portage Lake, if necessary

  13. Meadowbank Gold ProjectNIRB Final Hearing • Proposed No Net Loss plan will mitigate impacts to fish habitat in the project lakes Fish habitat – No Net Loss Plan

  14. Meadowbank Gold ProjectNIRB Final Hearing • DFO’s Analysis and Assessment: • Temporal losses of fish habitat not addressed • Contingency plan not provided • Development of additional habitat enhancements (A & B list) Fish habitat – No Net Loss Plan • Recommendation: • Cumberland revise No Net Loss plan to include additional fish habitat enhancement strategies and develop an adaptive management approach to implementation

  15. Meadowbank Gold ProjectNIRB Final Hearing • Limited monitoring plan to verify the success of the No Net Loss plan • DFO’s Analysis and Assessment: • Unable to verify whether the monitoring plan will be successful in demonstrating NNL • Confident that an acceptable plan will be achieved Fish habitat – No Net Loss Plan Monitoring • Recommendation: • Cumberland develop a robust monitoring plan to demonstrate success of No Net Loss plan • Cumberland augment fisheries baseline in support of monitoring plan for the No Net Loss plan

  16. Meadowbank Gold ProjectNIRB Final Hearing • Assessment of cumulative impacts on marine mammals due to barge traffic determined no significant impacts • DFO’s Analysis and Assessment: • Satisfied with the assessment, mitigation measures and monitoring Marine Environment – Barge Traffic • Recommendation: • Cumberland considers the guidance in the Marine Environmental Handbook • Cumberland considers an local on-board observer during barge operations

  17. Meadowbank Gold ProjectNIRB Final Hearing • Cumulative impacts to fish and fish habitat not significant • DFO’s Analysis and Assessment: • Assessment was appropriate and adequate • Re-consideration for reducing impacts to fish and fish habitat at Meadowbank Cumulative Effects – Fish and Fish Habitat • Recommendation: • Cumberland periodically review future development plans in Meadowbank claim block and consider potential cumulative impacts to fish and fish habitat

  18. Meadowbank Gold ProjectNIRB Final Hearing • Likelihood of accidents and malfunctions extremely low • DFO’s Analysis and Assessment: • Impact of accidents and malfunctions not presented in the aquatic assessment • Unclear whether appropriate mitigation measures incorporated into monitoring and management plans Other Issues – Accidents and Malfunctions • Recommendation: • Cumberland provide summary of potential accidents and malfunctions associated with fish and fish habitat, and identify how mitigation measures addressed in design, monitoring and management plans

  19. Meadowbank Gold ProjectNIRB Final Hearing • DFO would like to commend the cooperative working relationship Cumberland has demonstrated during the review • DFO is confident our outstanding issues related to fish and fish habitat can be resolved prior to and during the regulatory phase. Conclusion

  20. Meadowbank Gold ProjectNIRB Final Hearing Matna, Thank You Questions?