Welcome to Fisher Road Recycling

Welcome to Fisher Road Recycling. 1355 Fisher Road Cobble Hill, BC V0R 1L0 250-733-2108 250-883-0783. Fisher Road Recycling (FRR) . Who we are: Recycling Centre in Cobble Hill What we do: Receive and compost material into Class A Compost Receive and recycle other products

Download Presentation

Welcome to Fisher Road Recycling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome toFisher Road Recycling 1355 Fisher Road Cobble Hill, BC V0R 1L0 250-733-2108 250-883-0783

  2. Fisher Road Recycling (FRR) Who we are: • Recycling Centre in Cobble Hill What we do: • Receive and compost material into Class A Compost • Receive and recycle other products What we’ve done: • Invested over 1.7 million dollars into upgrades to create a state of the art recycling facility Products are received from: • Local area • Surrounding Districts within South Island

  3. Aerial Comparison 2006 vs 2010

  4. Construction of Air Floor # 1 for Inside Receiving Building May 18, 2006 June 10, 2006

  5. Construction of Receiving Building Jan. 19, 2007 Jan. 19, 2007 Jan. 19 2007 June 9, 2011

  6. Herhof Cells Covered by Receiving Bay March 19, 2006 October 26, 2005 June 19, 2009 April 20, 2007

  7. Herhof Cells Biofilter Upgrade March 11, 2006 Feb. 25, 2006 March 17, 2006 April 16, 2010

  8. Biofilters for Receiving Building 06/16/2009 06/16/2009 07/11/2009 05/19/2010

  9. Fisher Road Recycling Composting Processes Turning your waste into Grade A Compost

  10. FRR Inside Composting – Receiving Building • Material is received into large Receiving Building. • The air in the building is controlled for odors by a large fan and two Biofilters. • The food waste, yard and garden material are mixed and placed in one of three large Herhof cells for composting. • After the material exit the Herhof Cells, the material is placed on controlled aerated floors inside the receiving building for a period of time.

  11. Biofilters for Receiving Building • The Receiving Building is a Negative pressure environment. • The Biofilters System (picture bottom left) enables the air to be filtered decreasing the odors from the Receiving Building.

  12. FRR Inside Composting to Outside Composting Process • The inside composted material is moved from inside the receiving building to one of two large outdoor aerated concrete pads designed to control odors by positive aeration (forced air). • The material continues to compost and age while on the concrete pads. • Once the product is aged, it is screened to be sold to commercial businesses, landscapers, and homeowners as Class A Compost.

  13. Development of Air floor # 2 Jan. 19, 2007 June 17, 2010 July 13, 2010 Aug. 17, 2010

  14. Development of Air Floor # 3 02/08/2011 02/08/2011 02/08/2011 06/07/2011

  15. Current Construction of Air Floor #4 June 7, 2011 June 7, 2011 June 7, 2011 June 7, 2011

  16. Leachate Collection ponds October 22, 2010 Jan. 4, 2011 April 20, 2011 June 7, 2011

  17. Top Outside Concrete Pad April 9, 2006 April 13, 2006 April 29, 2006 June 10, 2006

  18. Fisher Road Recycling Centre

  19. Recycling Centre • Developed in 2010. • Provides residential and commercial drop off location to dispose of municipal solid waste. • Top picture reflects recycling centre June 2005. • Bottom picture reflects upgrades completed in early 2010.

  20. FRR Goals • Committed to helping new regions in developing new recycling programs. • Sharing our experiences and ideas. • Working together with stakeholders to promote recycling of material in a collaborative process. • Improving our operations and facility.