1 / 8

Storage status & forecast

Storage status & forecast. Reminder of CM policy. RAW data CERN + one additional copy @ Tier1 Share based on CPU pledges for a given year SDST/FULL.DST Only latest reconstruction Prevents re-stripping former reconstruction Pass n-1 removed as soon as pass n starts Stream DST One archive

perrin
Download Presentation

Storage status & forecast

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Storage status &forecast

  2. Reminder of CM policy • RAW data • CERN + one additional copy @ Tier1 • Share based on CPU pledges for a given year • SDST/FULL.DST • Only latest reconstruction • Prevents re-stripping former reconstruction • Pass n-1 removed as soon as pass n starts • Stream DST • One archive • Pass n: 4 replicas (CERN + 3) • Pass n-1: 2 replicas • Pass n-2: removed when pass n starts • Incremental stripping: 4 replicas, but should be <10% of n • MC DST • One archive • 3 replicas • How do we retire MC passes? NCB 26.11.2012, PhC

  3. Current tape status Collision12 Collision11 RAW CERN NCB 26.11.2012, PhC

  4. Tape crisis • As announced, tape is a real issue: • More data than expected: longer LHC run, higher HLT rate • Usage of FULL.DST instead of SDST • 5GB instead of 2 GB for a 3 GB RAW file • Mitigated by removing previous processing’s SDST • FULL.DST on disk until stripping is complete • Less stress on the tape cache disks • Mitigated by removing non-CERN archive of many datasets (now only one archive for all datasets) • Stopped archiving at GRIDKA, IN2P3, PIC and SARA • Sites have kindly agreed to let us use more than the pledge • RAL provides an additional 1 PB of tape • Other sites on best effort • Agreement between LHCb and ALICE for load of tapes • GRIDKA, CNAF if needed • SARA “very close” to the end NCB 26.11.2012, PhC

  5. Disk status MC11a Collision12 MC10 Collision12 Collision11 NCB 26.11.2012, PhC

  6. Situation w.r.t. pledges • CERN and CNAF: some disk ready to be installed • Part of tape cache not included for dCache sites • WARNING: decrease of requirements/pledges in 2013!! NCB 26.11.2012, PhC

  7. Pledges 2013 vs 2012 • 2012: 75.4% of requirements pledged • Requirements were mitigated and reviewed • 2013: new fraction at some Tier1s • When applied to a “reduced” requirement, decrease of pledges • Proposal: use 2012 fraction of pledges for 2013 • More inline w.r.t. 2012 pledges NCB 26.11.2012, PhC

  8. Tape staging • 2012: max of (prompt + reprocessing) • Repro 2012-2: current phase (lower pace) • Assuming 5 weeks for 2011 reprocessing • Lower pace than 2012 reprocessing • Restripping is the challenge for tape staging • Warn sites well in advance • Assign enough tape drives (less for writing) NCB 26.11.2012, PhC

More Related