H23G07: Environmental Geotechnology Presentation. Mixed Technology Remediation of a F ormer C hemical Works , Cadishead , Greater Manchester. By Ka Hang CHAN Ting Ting LIM. Location. Cadishead Site. History. 1900-1965 Refining crude tar & fractioning chemicals 1965-2006

pegeen
Download Presentation

H23G07: Environmental Geotechnology Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. H23G07: Environmental GeotechnologyPresentation Mixed Technology Remediation of a Former Chemical Works, Cadishead, Greater Manchester By Ka Hang CHAN Ting Ting LIM

  2. Location Cadishead Site

  3. History • 1900-1965 • Refining crude tar & fractioning chemicals • 1965-2006 • Storage facility for heavy fuel oils • 2006-current • Housing plan by Harrow Estates

  4. SiteDetail • Size of site • 6.5 hectare • 120,000m³ contaminated soil • 6,000m² of groundwater sources • Potential receptors • Local residents • Off-site groundwater receptors in sandstone aquifer • Adjacent sites • Future users of new homes

  5. Contaminants

  6. RemediationMethods Alternatives: • Traditional excavate & dispose strategy • Ex-situ biological treatment followed by a groundwater treatment • Multi-technology Remediation: • Ex-situ bioremediation for hydrocarbon contaminated soils (90,000m³) • Ex-situ chemical oxidation (500m³) • Multi-phase extraction (4000m²) • Air Sparging (1,000m² + 1,000m²)

  7. AirSparging • Principles • Reducing concentration of volatile organic compounds(VOCs) • Air sparging lances driven into the aquifer using direct push technique • All vapours collected adsorbed by carbon

  8. How Air Sparging works?

  9. Air Sparging Sparging Well Air Blower Installation of Sparging Lances

  10. AirSparging – Pros & Cons

  11. Results • Over 6.5 tonnes of VOCs recovered • Project Costs - £6.3m • 85% - soil treatment • 15% - groundwater treatments • Unknown contamination sources • Odours & VOC emissions • Grant planning permission • 392 dwellings on the 17 acre site • ‘Best use of a combination of remediation techniques’ • Shortlisted in 2008 Brownfield Briefing Awards