1 / 16

October 2007

FY 2008 - FY 2012 Dredging Program. New York District. October 2007. FY08-FY12 Dredging Schedule New York District. FY08. FY09. FY10. FY11. FY12. Dredge + Quantity (CY). Placement Site. Maintenance Dredging. 1st Qtr. 2nd Qtr. 3rd Qtr. 4th Qtr. 1st Qtr. 2nd Qtr. 3rd Qtr.

paul2
Download Presentation

October 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FY 2008 - FY 2012 Dredging Program New York District October 2007

  2. FY08-FY12 Dredging Schedule New York District FY08 FY09 FY10 FY11 FY12 Dredge + Quantity (CY) Placement Site Maintenance Dredging 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Mechanical 50K Newark Bay, NJ Upland NY & NJ Channels- Arthur Kill & Raritan Bay Mechanical 50-60K & 250K Upland & HARS Mechanical 30K Raritan River, NJ Upland Mechanical ~40K Bronx River, NY Upland East Chester Creek, NY Mechanical ~40K Upland Mechanical ~260K East River, NY HARS Flushing Bay & Creek, NY Mechanical ~45K Upland New York Harbor Mechanical ~250K HARS

  3. FY08-FY12 Dredging Schedule New York District FY08 FY09 FY10 FY11 FY12 Dredge + Quantity (CY) Placement Site Maintenance Dredging 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Port Chester Harbor, NY Mechanical ~50K HARS Westchester Creek, NY Mechanical ~60K Upland Upland & HARS Bay Ridge & Red Hook , NY Hopper ~100K Buttermilk Channel, NY Hopper ~80K HARS Hudson River- Albany, NY Hopper 55K Upland Hopper 240K Jamaica Bay, NY Beach Hydraulic ~280K (2yr) ~140K (1yr) East Rockaway, NY Beach Fire Island To Jones, NY Hydraulic 500K Beach

  4. FY08-FY12 Dredging Schedule New York District FY08 FY09 FY10 FY11 FY12 Dredge + Quantity (CY) Placement Site Maintenance Dredging 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Great Kills Harbor, NY Hydraulic ~100K Beach Great South Bay, Patchogue River, NY Hydraulic ~120K Upland Long Island Intracoastal Waterway, NY Hydraulic ~40K Beach Hydraulic 700K Jones Inlet, NY Beach Hydraulic 280K Moriches Inlet, NY Beach Sandy Hook Bay @ Leonardo, NJ Hydraulic ~40K Beach Shewsbury River, NJ Hydraulic ~120K Upland Shinnecock Inlet, NY Hydraulic ~300K Beach

  5. FY08-FY12 Dredging Schedule New York District FY08 FY09 FY10 FY11 FY12 Dredge + Quantity (CY) Placement Site Maintenance Dredging 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Shoal Harbor & Compton Creek, NJ Hydraulic ~70K Upland Sandy Hook Channel, NJ Hopper ~60K HARS

  6. FY08-FY12 Dredging Schedule New York District FY08 FY09 FY10 FY11 FY12 Dredge + Quantity (CY) Placement Site Harbor Deepening 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Ambrose Contract 2 S-Am-2 Hopper 5.6 Mil HARS Anchorage Contract 1a S-An-1a Mechanical Upland Anchorage Contract 1b S-An-1b Mechanical 2.9 Mil Upland Anchorage Contract 2 S-An-2 Mechanical 1.22 Mil TBD Port Jersey Contract 3 PJ-3 Upland & HARS Mechanical 3.6 Mil Port Jersey Contract 4 PJ-4 Upland & HARS Mechanical Kill Van Kull Contract 1 S-KVK-1 Mechanical 2.25 Mil HARS Newark Bay Contract 1 S-NB-1 HARS Upland Reef Mechanical 2.2 Mil

  7. FY08-FY12 Dredging Schedule New York District FY08 FY09 FY10 FY11 FY12 Dredge + Quantity (cy) Placement Site Harbor Deepening 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Newark Bay Contract 2 S-NB-2 Mechanical 3.3 Mil TBD Upland & HARS Pt. Elizabeth S-E-1 Mechanical Arthur Kill Contract 1 S-AK-1 Mechanical 600 K TBD Arthur Kill Contract 2 S-AK-2 Mechanical 620 K TBD

  8. Select Shoals within the port channels Newark Bay, NJ QUANTITY TO BE DREDGED: 50,000 CY (Award 4th Quarter FY08) CONTRACT DEPTH: 40 ft & 45 ft TYPE OF DREDGED MATERIAL: Silt & Clay LAST DREDGED: 2006-2007 EQUIPMENT USED: Mechanical Dredge PLACEMENT SITES: Upland Disposal Site to be provided by contractor ISSUES: Selected areas have a No-Dredge Window of 01 February through 31 May Mechanical Dredge Maintenance Dredging

  9. Newark Bay, NJ Port Newark Channel Newark Bay

  10. Raritan River, NJ QUANTITY TO BE DREDGED: 40,000 CY (Award July ‘08) CONTRACT DEPTH: 25 ft (+ 1 ft over depth) TYPE OF DREDGED MATERIAL: Silt & Clay LAST DREDGED: 2000 EQUIPMENT USED: Mechanical Dredge PLACEMENT SITE: Upland Disposal Site to be provided by contractor ISSUES: Seasonal environmental window 15 November through 30 June Select Shoals within Mile 0.0 – 4.0 DREDGE AREAS Mechanical Dredge Maintenance Dredging

  11. NY & NJ Channels Arthur Kill & Raritan Bay Reaches Dredge Area Arthur Kill Reach Dredge Areas Raritan Bay Reach QUANTITY TO BE DREDGED:Arthur Kill: 50,000-60,000 CY Raritan Bay: 250,000 CY (Award July ’08) CONTRACT DEPTH: 35 ft (+ 2 ft over depth) TYPE OF DREDGED MATERIAL: Sand, Silt, & Clay LAST DREDGED: Arthur Kill: 2007 Raritan Bay: 2004 EQUIPMENT USED: Mechanical Dredge PLACEMENT SITES: Arthur Kill: Upland Disposal Raritan Bay: HARS ISSUES: Arthur Kill: Seasonal No-Dredge Window 1 February to 31 May for Winter Flounder. Additional location-specific windows: 1 April to 31 July around Pralls and Meadow Islands for Shorebirds, and within a quarter mile of the Outerbridge Crossing from 1 March to 31 July for PeregrineFalcons. Raritan Bay: Seasonal No-Dredge Window 15 November to 31 May for Winter Flounder and 1 June to 15 July for Shell Fish. Mechanical Dredge Maintenance Dredging

  12. Hudson River, NY Coeymans and Kingston Reaches Placement Site Dredge Area QUANTITY TO BE DREDGED: 55,000 C.Y. CONTRACT DEPTH: 32 ft (+1 ft over depth) TYPE OF DREDGED MATERIAL: Sand, Silt & Clay LAST DREDGED: 2003 - Castleton to Hudson Reaches 1965 - Kingston Reaches EQUIPMENT USED: Hopper Dredge PLACEMENT SITE: Houghtaling Island (Federally owned site). New York State is providing all lands and easements in support of access to the Federally owned placement site. ISSUES: No dredging allowed 1 Feb – 15 Aug due to endangered species (Shortnose Sturgeon). Contract has two discontinuous areas (Coeymans area and Kingston area) - long travel distances to placement site. Hudson River ices over from early December to mid March precluding dredging. A sole source 8a contract was awarded to Coleman Construction Company, Inc. on 17 August 2007. Hopper Dredge Maintenance Dredging

  13. Jamaica Bay, NY QUANTITY TO BE DREDGED: 240,000 CY (Award November ‘07) CONTRACT DEPTH: 20 ft (+ 1 ft over depth) TYPE OF DREDGED MATERIAL: Sand LAST DREDGED: 2004 EQUIPMENT USED: Hopper Dredge PLACEMENT SITE: Riis Beach, Gateway National Recreation Area ISSUES: Endangered species – Shore Birds. Seasonal no-dredge window 1 April through 15 September Dredge Area Placement Site Hopper Dredge Maintenance Dredging

  14. Jones Inlet, NY QUANTITY TO BE DREDGED: 700,000 CY (Award December ‘07) CONTRACT DEPTH: 14 ft (+ 2 ft over depth) TYPE OF DREDGED MATERIAL: Sand LAST DREDGED: 1995 EQUIPMENT USED: Hydraulic Dredge PLACEMENT SITE: Point Lookout Beach (west of inlet) ISSUES: Dredge Areas Seasonal no-dredge window 1 June to 30 September to protect spawning shellfish and/or finfish; no-dredge window 1 April to 31 August to protect nesting shorebirds. Placement Site Hydraulic Pipeline Maintenance Dredging

  15. Port Elizabeth Dredge Area Port Jersey Contract 3 Dredge Area KvK Contract Dredge Area Anchorage Contract 1b Dredge Area Ambrose Contract 2 Dredge Area New York and New Jersey Harbor, NY & NJ(50 foot Project) DESCRIPTION: Channel deepening from 40-45 ft. to 50 ft. STATUS: New Contracts: Ambrose Contract 2 (S-Am-2) - Award Apr ’08 (5.6 Million CY) Anchorage Contract 1b (S-An-1b) - Award May ’08 (2.9 Million CY) Port Jersey – Contract 3 (PJ-3) –Award Oct ’08 (3.6 Million CY) Kill Van Kull Contract 1 (S-KvK-1) – Award Feb ‘07 (2.25 Million CY) Port Elizabeth (S-E-1) – Solicitation Sept ’08 • DREDGE MATERIAL: Sand, Silt, Clay, • Glacial Till, and Rock • EQUPMENT USED: Mechanical & Hopper • PLACEMENT SITE: HARS, Upland, & Reef Site ISSUES: Blasting Required. Contract is designed around environmental windows. Cost-shared with the Port Authority NY & NJ. Port Jersey -Seasonal no-dredge window in outer channel - 1 Feb through 31 May (Winter Flounder) Cost-shared with the State of NJ Hopper and Mechanical Dredge Harbor Deepening

  16. Any Questions ?

More Related