Araştırma Altyapıları Research Infrastructures (RI) FP6 ve FP7 - PowerPoint PPT Presentation

Ara t rma altyap lar research infrastructures ri fp6 ve fp7 l.jpg
Download
1 / 40

Araştırma Altyapıları Research Infrastructures (RI) FP6 ve FP7 Koç Üniversitesi 10 Ocak 2008 Selçuk Taral selcuk.taral@mam.gov.tr Sunumun Amacı AB Çerçeve Programları içinde yer alan Araştırma Altyapıları özel programının tanıtımı

I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.

Download Presentation

Araştırma Altyapıları Research Infrastructures (RI) FP6 ve FP7

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Ara t rma altyap lar research infrastructures ri fp6 ve fp7 l.jpg

Araştırma AltyapılarıResearch Infrastructures (RI) FP6 ve FP7

Koç Üniversitesi

10 Ocak 2008

Selçuk Taral

selcuk.taral@mam.gov.tr


Sunumun amac l.jpg

Sunumun Amacı

  • AB Çerçeve Programları içinde yer alan Araştırma Altyapıları özel programının tanıtımı

  • 6. Çerçeve Programından devam eden projelere uluslararası erişim (Trans-national Access)

  • 7. Çerçeve Programında Araştırma Altyapıları özel programının 30 Kasım 2007’de açılan çağrısı ile ilgili bilgi

  • 30 Kasım 2007 çağrısının öncelikli alanları ve bu alanlarda verielecek tekliflere katılım


Ara t rma altyap lar tan m l.jpg

Araştırma Altyapıları - Tanım

Araştırma Altyapıları(Research Infrastructures)

Bilim dünyasına önemli hizmetler veren tesisler, kaynaklar ve hizmetler

Örnekler:

Radyasyon kaynakları

Genomik veritabanları

Sosyal bilim veri tabanları

Araştırma gemileri/uçakları

e-altyapılar ….


Definition of research infrastructures l.jpg

Definition of Research Infrastructures

  • "Facilities", "resources" and related "services" that are needed by the scientific community for the development of leading-edge research in the most efficient manner at EU level, as well as for knowledge transmission, knowledge exchanges and knowledge preservation;

  • covers major equipments, collections, archives and structured information, enabling ICT-based infrastructures, and any other entity of a unique nature used for research.


Ara t rma altyap lar amac l.jpg

Araştırma Altyapıları - Amacı

  • Avrupanın üst düzey araştırma altyapılarının verimli kullanımlarına ve gelişimlerine ve “pan-Avrupa çıkarlarına uygun” yeni altyapıların kurulmasına yardımcı olmak

  • Politika geliştirilmesine ve programın

    uygulanmasına yardımcı olmak


Slide6 l.jpg

Objectives of the Research Infrastructures action

  • Optimising the use and development of the best research infrastructures existing in Europe

  • Helping to create in all fields of S & T new research infrastructures of pan-European interest needed by the European scientific community

  • Supporting policy development and the programme implementation


Fp6 ara t rma altyap lar projeleri ve uluslararas eri im l.jpg

FP6 Araştırma Altyapıları projeleri ve uluslararası erişim

  • FP6’da desteklenen Araştırma Altyapıları projelerinin listesi (e-Altyapılar hariç) :

    http://cordis.europa.eu/infrastructures/projects.htm

  • Bu listenin ilk sırasında verilen Uluslararası Erişim

    -Transnational Access- projeleri tüm araştırmacılara kullanım sağlayan araştırma altyapıları

  • İkinci grupta yer alan Bütünleştirici Faaliyetler

    -Integrating Activities- projelerde bazı ortaklar kullanım (transnational access) sağlıyorlar

    Not: Her projenin kendi web sayfasına listeden ulaşılabiliyor


Uluslararas eri im l.jpg

Uluslararası erişim

(TA – Transnational Access)

Araştırma altyapılarının çeşitli biçimlerde

kullanımı

(MC2 ACCESS: advanced micro- and nanotechnology device

processingenvironments for microwave and photonic devices)

Kendi araştırmanızın bir bölümünü giderek yerinde veya veri, spesimen, veya cihaz getirerek burada veya veritabanlarını kullanarak yapabilirsiniz...


B t nle tirici faaliyetler rnekler fp6 l.jpg

Bütünleştirici Faaliyetler - Örnekler (FP6)

IntegratingActivity on Synchrotron

and Free Electron Laser Science

Optimising Access to Spot Infrastructure for Science


B t nle tirici faaliyetler rnekler fp610 l.jpg

Bütünleştirici Faaliyetler- Örnekler (FP6)

Taxonomic Access Facilities (TAFs)

Advanced Radio Astronomy

in Europe

Center for Biomolecular

Magnetic Resonance

Free access to world-class biological databases for European sciencethanks to FELICS


B t nle tirici faaliyetler rnekler fp611 l.jpg

Bütünleştirici Faaliyetler - Örnekler (FP6)

Bütünleştirici Faaliyetler - Örnekler

The European Center for Analysis in the Social Sciences


T rkiye nin kat l m fp6 l.jpg

Türkiye’nin katılımı(FP6)

Türk ortaklı projeler:

ILIAS

EURONS

Black Sea SCENE (3 Türk ortak)

NERIES

SEADATANET


T rkiye den kat l m e altyap lar l.jpg

Türkiye’den katılım(e-Altyapılar)

Türk ortaklı e-Altyapı projeleri (FP6) :

GEANT 2

SEEGRID

SEEGRID II

EUMEDGRID

EGEE-2

Ayrıntılı bilgi için: www.ulakbim.gov.tr


Slide14 l.jpg

FP7 (2007 – 2013)

Cooperation – Collaborative research

Ideas – Frontier Research

People – Human Potential

Capacities – Research Capacity

+

JRC (non-nuclear + nuclear

Euratom


Slide15 l.jpg

Capacities – Research Capacity

  • Research Infrastructures

  • Research for the benefit of SMEs

  • Regions of Knowledge

  • Research Potential

  • Science in Society

  • Coherent development of policies

  • Activities of International Cooperation


Fp7 budget billion current prices l.jpg

FP7 budget(€ billion, current prices)

Source: revised FP7 proposal


Capacities budget billion current prices l.jpg

Capacities budget(€ billion, current prices)

Source: revised FP7 Commission proposal


Fp7 ara t rma altyap lar zel program n n proje t rleri l.jpg

FP7 Araştırma Altyapıları Özel Programının Proje Türleri

Mevcut Altyapılar

Yeni Altyapılar

Bütünleştirici faaliyetler

Tasarım çalışmaları

ESFRIYol haritası

Yeni kurma

(başlangıç aşaması; yapım aşaması)

e-Altyapılar

Politika geliştirme ve programın uygulanması

ESFRI : European Strategy Forum for Research Infrastructures (Ayrıntılı bilgi ve Yol Haritası için: http://cordis.europa.eu/esfri/)


Fp7 research infrastructures in brief l.jpg

FP7 Research Infrastructures in brief

Existing Infrastructures

New Infrastructures

Design studies

Integrating activities

ESFRIRoadmap

Construction (preparatory phase; construction phase)

e-infrastructures

Policy Development and Programme Implementation

ESFRI: http://cordis.europa.eu/esfri/


Integrating activity in fp7 l.jpg

580 M€ 2007-2013

Calls 3, 6, 7

420 M€ 2007-2013

Calls 1, 2, 4, 5, 6,7

Integrating Activity in FP7

  • Integrating Activities to promote the coherent use and development of research infrastructures in a given field, implemented through:

    • A bottom-up approach for proposals open to all fields of science

    • Targeted approach with topics defined in cooperation with the FP7 thematic areas

  • [ICT based e-infrastructures in support of scientific research]


Slide21 l.jpg

Integrating Activity in FP7

  • Structure better and integrate, on a European scale, the way research infrastructures operate and develop

    • Normally all major RI’s in Europe in one field

    • At least 3 MS or AS

  • 3 types of activities in one project

    • Networking Activities

    • Trans-national Access

    • Joint Research Activities

  • Based on the continuation of the successful FP6 instrument “I3”

  • Project type: combination of collaborative project + coordination and support actions


Slide22 l.jpg

Networking Activities

  • To foster a culture of co-operation between the research infrastructures and the related scientific communities

  • Forms of activities:

    • Towards a common long-term strategy : foresight…

    • Towards good practice: exchange of personnel and visits, standards and quality…

    • Towards the users: training, feedback, coordination…

    • Towards virtual research communities: Web-sites, common softwares, databases, data management…

    • Setting up of technical workshops, forums, working groups and studies…


Slide23 l.jpg

Trans-national Access/Serviceactivities

  • Provide trans-national access to researchers or research teams to one or more infrastructures among those operated by the participants

    • "Hands on" access

    • Remote access: provision of reference material, sample analysis…

      Remote access to distributed infrastructures: “trans-nationality” will not apply

  • Provide research infrastructures related services to the scientific community

    • Access to scientific services freely available through communication networks, e.g. databases available on the web


Slide24 l.jpg

Joint Research Activities

  • Explore new fundamental technologies or techniques underpinning the efficient and joint use of the participating research infrastructures

    To improve the services provided by the infrastructures (in quality and/or quantity)

  • Forms of activities:

    • Instrumentation / prototype development

    • Development of methods, protocols, standards…

    • Development of software, middleware, algorithm; Database creation, upgrade, curation…

    • Development and curation of samples


A r lar ve b t eleri plan l.jpg

Çağrılar ve bütçeleri (plan)


Slide26 l.jpg

Planning of calls and indicative budget


A r lar ve b t eleri plan27 l.jpg

Çağrılar ve bütçeleri (plan)


Slide28 l.jpg

Planning of calls and indicative budget


Slide29 l.jpg

New approach forIntegrating Activities in FP7

  • Bottom up approach for all fields of science (as in FP6)

  • New: targeted approach to respond to identified strategic needs:

    • creating synergies and ensuring consistency with other parts of the Framework Programme,

    • in important fields currently not well covered,

    • Pilot exercise under FP7


Why a targeted approach l.jpg

Why a targeted approach?

  • To ensure consistency and create synergies with the cooperation programme

  • To optimise the use of (limited) funds

  • To stimulate RI actions in specific fields, currently not well covered (e.g. health, energy, transport)


Slide31 l.jpg

Priority topics undertargeted approach in FP7

  • Health (6)

  • Food, Agriculture and Biotechnology (4)

  • Information and Communication Technologies (3)

  • Nanosciences, Nanotechnologies and Materials (2)

  • Energy (5)

  • Environment (4)

  • Transport (2)

  • Socio-economic Sciences and Humanities (3)

  • 29 priority topics for RI’s in 8 fields of R&D

  • No competition under the same topic but integration on a European scale

    ( For more information on “targeted approach” see : Work Programme 2008 )


Priority topics food agriculture and biotechnology related specific 2008 objectives l.jpg

Priority topicsFood, Agriculture and Biotechnology-related specific 2008 objectives

  • INFRA-2008-1.1.2.7: enabling investigation of impacts of food on health, including development of tools for cross compatibility and networked usage, of standards and codes of practice;

  • INFRA-2008-1.1.2.8: European diagnostic / test / validation infrastructure for animal diseases (including zoonoses);

  • INFRA-2008-1.1.2.9: Biological Resources Centres (BRCs) for micro-organisms;

  • INFRA-2008-1.1.2.10: Aquaculture facilities (inland, coastal, offshore), fisheries research vessels, equipments, data bases.


Priority topics information and communication technologies related specific 2008 objectives l.jpg

Priority topicsInformation and Communication Technologies-related specific 2008 objectives

  • INFRA-2008-1.1.2.11: for ICT experience and application research, based in particular on methods, tools and platforms to involve the user early in the R&D process;

  • INFRA-2008-1.1.2.12: for nano-electronics and integrated micro-/nano-systems research, based in particular on networking of and trans-national access to clean rooms;

  • INFRA-2008-1.1.2.13: for embedded systems research based in particular on sharing methods, tools and platforms for design, evaluation and testing.


Priority topics nanosciences nanotechnologies and materials related specific 2008 objectives l.jpg

Priority topicsNanosciences, Nanotechnologies, and Materials- related specific 2008 objectives

  • INFRA-2008-1.1.2.14: for nano-bio-technology, in particular for simulation, design and control of biomaterial structure and reactions at nano-level;

  • INFRA-2008-1.1.2.15: for nano-materials research, linked with the European nanotechnology Action Plan, and in the context of a broad international cooperation.


Priority topics energy related specific 2008 objectives l.jpg

Priority topicsEnergy-related specific 2008 objectives

  • INFRA-2008-1.1.2.16: aiming at the development of the next generation bio-fuels;

  • INFRA-2008-1.1.2.17: integrating European testing and analysis research infrastructure for hydrogen and fuel cell energy-chains;

  • INFRA-2008-1.1.2.18: for ocean energy research;

  • INFRA-2008-1.1.2.19: for concentrating solar power research;

  • INFRA-2008-1.1.2.20: for research on Smart Energy networks, to develop advancedelectricity networks architectures and/or for testing of power components.


Priority topics socio economic sciences and humanities related specific 2008 object l.jpg

Priority topicsSocio-economic Sciences and Humanities – related specific 2008 object

  • INFRA-2008-1.1.2.27: promoting European wide access to microdata sets of officials statistics for research and leading to a European statistical system open to researchers;

  • INFRA-2008-1.1.2.28: through the development, harmonisation and optimal use of indicators and data for economic and innovation research;

  • INFRA-2008-1.1.2.29: developing improved access to historical archives and cultural collections for research purpose.


Slide37 l.jpg

Expected size of an

Integrating Activity in FP7

  • Duration: 4 years max

  • EC contribution:

    • Expected to be in the range of 3 to 10 M€. Higher EC contribution possible only in well justified cases (e.g. facilities serving very large communities of users). Not foreseen to be more than 15 M€

  • Number of contractors:

    • Experience shows that a project with more than 20 contractors is difficult to manage

    • Not all partners need to be contractors


Slide38 l.jpg

Expected size of an

Integrating Activity in FP7

  • What should be the normal balance of the activities?

    • Management : 5 to 10%

    • Networking activities : 15 to20%

    • TA/service activities: 25 to 35%

    • Joint research activities: 35 to 45%

  • No fixed rule, « one size does not fit all »


Slide39 l.jpg

For further information

  • FP7 and Capacities Specific Programme

    http://cordis.europa.eu/fp7/home_en.html

    http://cordis.europa.eu/fp7/capacities/home_en.html

  • Research Infrastructures on CORDIS (FP6)

    http://cordis.europa.eu/infrastructures/

  • Research Infrastructures in Europa

    http://ec.europa.eu/research/infrastructures

  • Grant Model Agreement

    http://cordis.europa.eu/fp7/calls-grant-agreement_en.html#standard_ga

    Guides for applicants will be ready at the time of the call


Lgili sayfalar ve bilgi edinme l.jpg

İlgili sayfalar ve bilgi edinme

FP6 projelerinde yer alan altyapıların kullanımı için:

www.fp7.org.tr(Adım Adım 7.ÇP)

FP6’da devam eden projeler için:

http://cordis.europa.eu/infrastructures/projects.htm

FP7’nin Araştırma Altyapıları özel programı için:

http://cordis.europa.eu/fp7/capacities/research-infrastructures_en.html

Çerçeve Programları Ulusal Koordinasyon Ofisi’nden bilgi için:

ncpinfra@tubitak.gov.tr

Not: İngilizce slaytlar Komisyon tarafından yapılan çeşitli sunumlardan alınmadır.


  • Login