AVS Safety Management System. AVSSMS: The U.S. “Safety Programme”. ICAO: State’s safety programme. Definition: An integrated set of regulations and activities aimed at improving safety. . ICAO Definition. Safety Management Systems. “SMS”.

paul
Download Presentation

AVS Safety Management System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AVS Safety Management System AVSSMS: The U.S. “Safety Programme”

  2. ICAO: State’ssafetyprogramme Definition: An integrated set of regulations and activities aimed at improving safety.

  3. ICAO Definition Safety Management Systems “SMS” A systemic approach to managing safety, including the necessary organizational structures, accountabilities, policies and procedures. ICAO Doc. 9859, Sec. 1.4.2

  4. The AVSSMS • AVS is applying SMS concepts to FAA oversight processes • The AVSSMS will be the core of the U.S. “State Safety Programme” • AVS has published: • SMS Doctrine: Order VS 8000.1 • SMS requirements: Order VS 8000.367

  5. What SMS is not and what it is… What it isn’t: What it is: Compliance is integral to safety management A substitute for compliance An effective interface for safety management A substitute for oversight A replacement for system safety SMS completes the systems approach A requirement for a new department A set of decision making processes for senior and line management

  6. System Safety • "The application of special technical and managerial skills in a systematic, forward looking manner to identify and control hazards throughout the life cycle of a project, program, or activity" (Roland & Moriarty, 1990) • Traditional approach concentrates on technical • SMS adds emphasis on management elements

  7. SMS Purpose and Methods • The purpose of a safety management system is to provide a systematic way to control risk and to provide assurance that those risk controls are effective • The SMS will give certificate holders a formal means of meeting statutory safety requirements (title 49) and the FAA a means of evaluating management capability

  8. SMS Components and Relationships • Applying Risk Management • Assuring Safety Risk Controls • Oversightof Design and Performance of Systems • The “3 R’s”: Roles, Responsibilities, and Relationships – FAA and Service Providers

  9. SMS Concepts: Assurance • Assurance: “something that gives confidence”1 • Quality assurance: “... focused on providing confidence that quality requirements are being met”2 • Likewise, Safety Assurance relates to safetyrequirements 1 Black’s Law Dictionary 2 ISO 9000-2000

  10. Oversight and Safety Assurance • FAA uses risk assessment process to determine safety assurance objectives • Design Assessments (SAIs) are used to determine the ability of organizational design to meet regulatory requirements and operator risk management objectives • Performance Assessments (EPIs) are used to determine conformance to design requirements

  11. Policy: (Structure) Risk Mgmt. Safety Assurance SMS Components (“Four Pillars”) Safety Promotion: (Culture)

  12. Description & Context Hazard Ident Data Acquisition & Process Specific Information Risk Analysis Analysis (RCA) Analysis Risk Assmt System Assmt Assessment Risk Control Corrective Action Design Performance SRM SA System Analysis (Design) System Operation Action: Problem Resolution

  13. DA FAA’s Safety Management (Oversight) System PA Public: Users S R M S A Operator’s Safety Management System Operational Process Oversight and SMS FAA Oversight Program Management Protection Production Technical Program Requirements • Systems • Subsystems • Elements Surveillance Cert C.O.S.

  14. 1 3 National Aviation System Level Service Provider/Organizational Level 2 Individual (Airman/Aircraft) Level

  15. Policy: QMS FAA SA(S) Strategic Analysis 1 SAS DA PA Public Users S R M S A SMS Education & Awareness of Risk (GA) 3 Designee System Airmen & Aircraft FAA SRM(S) Regs./Policy 2 FAA SA CH SRM FAA SA FAA SP

  16. SRM, Rulemaking, Design, and Compliance • FAA uses the SRM process to design regs, standards and policies • These form boundaries of acceptability for service providers • Service providers must design risk controls that: • Control hazards identified in regulations • Stay within boundaries of acceptance • Adapt to the context of their operations

  17. ICAO and FAA SMS Frameworks • ICAO has recently published a set of frameworks for State safety programmes and for service providers • It is organized around the four components of SMS • U.S. FAA SMS requirements use a similar structure, with the same four components

  18. U.S. FAA SMS Framework • The first version of the FAA’s standards was published in AC 120-92, Appendix 1 • AC based on JPDO/AVS draft standards • Each element in the U.S. standard has an associated functional objective – a performance expectation of each process • AVS is publishing a similar set of standards for both internal and external SMSs

  19. Component 1: Policy • Element 1.1 Safety Policy • Element 1.2 Management Commitment and Accountabilities • Element 1.3 Key Safety Personnel • Element 1.4 Emergency Preparedness and Response • Element 1.5 SMS Documentation and Records

  20. Component 2: Risk Management • Element 2.1 Hazard identification and analysis • Process 2.1.1 System and task analysis • Process 2.1.2 Hazard identification • Element 2.2 Risk assessment and control • Process 2.2.1 Analyze safety risk • Process 2.2.2 Assess safety risk • Process 2.2.3 Control safety risk

  21. Component 3: Safety Assurance • Element 3.1 Safety Performance Monitoring and Measurement • Process 3.1.1 Continuous monitoring • Process 3.1.2 Internal audits by operational departments • Process 3.1.3 Internal evaluation • Process 3.1.4 External auditing of the SMS • Process 3.1.5 Investigation • Process 3.1.6 Employee reporting and feedback system

  22. Safety Assurance (cont.) • Process 3.1.7 Analysis of data • Process 3.1.8 System assessment • Process 3.1.9 Preventive/corrective action • Process 3.1.10 Management review • Element 3.2 Management of Change • Element 3.3 Continual Improvement

  23. Component 4: Safety Promotion • Element 4.1 Competencies and Training • Process 4.1.1 Personnel requirements • Process 4.1.2 Training • Element 4.2 Communication and Awareness

  24. FAA SMS Documents: Requirements • Order VS 8000.1 Doctrine • High level philosophy and structure • Order VS 8000.367 Requirements • Functional internal/external requirements • AC 120-92 Service Provider Framework • Detailed/focused requirements • Being reformatted to match ICAO frameworks

  25. Documents: Implementation • (Draft) AC 120-XX Implementation • Four-phase plan • Similar to ICAO and TC strategies • Includes gap analysis and summary assessment tools • Data Collection Toolset • Similar to those used in ATOS for part 121 oversight • Simplified set being developed for small operators

  26. Documents: Guidance • SMS Guidebooks • SMS Validation Process (FAA Draft Notice)

  27. FAA Safety Management Challenge • Continue to upgrade the FAA Safety Assurance System • Integrate traditional elements of oversight into a comprehensive AVS SMS including: • Rulemaking and policy development • Safety Assurance practices across all areas of FAA oversight • Implementing Safety Management Systems in product/service providers’ organizations • Integrating SM functions within AVS and FAA

  28. Industry Safety Management Challenge • Development and implementation of the components of SMS • Integrating safety as a core business management function • Integrating business units • Making safety management a business benefit

  29. SMS Implementation

  30. 4 Continuous Improvement 3 Proactive Processes 2 Reactive Processes 1 Planning & Organization 0 Orientation & Commitment SMSImplementation Process

  31. 4 Continuous Improvement 3 Proactive Processes 2 Reactive Processes 1 Planning & Organization 0 Orientation & Commitment SMSPilot Projects Phase 2: Experience Phase 1: Readiness

  32. Organizations

  33. AFS SMS Program Office • Change to 1100.2 Order signed 4/17/08 • Office tasked with: • AFS SMS Policy • Focal point for SMS rulemaking • Oversight and coordination of voluntary SMS implementation and testing • Integration with oversight systems • Policy, guidance, and tool development • Training and outreach development and coordination

  34. Standardization and Assistance Team • Under direction of AFS SMS PMO • Team members currently from: • SMS PMO • FAASTeam • HQ Policy Divisions • Standardization and Assistance to operators and CMTs in voluntary SMS projects • All activities coordinated with appropriate certificate oversight offices

  35. MITRE Corporation Involvement • MITRE is a Federally-Funded Research and Development Corporation (FFRDC) • MITRE assists the AFS SMS PMO in: • SMS Pilot Project (SMSPP) activities • Studies and analysis to support development of SMS implementation and oversight strategies

  36. Safety Management Focus Group (SMFG) • Voluntary implementation user’s group • Provides a two-way communications mechanism between SMS PMO and participants in voluntary implementation • Provides a forum for knowledge sharing among participants

  37. Wilbur Wright gliding, 1901 Photographs: Library of Congress “Carelessness and overconfidence are more dangerous than deliberately accepted risk”Wilbur Wright, 1901 Contact: Don Arendt, Ph.D. (703) 661-0516 don.arendt@faa.gov

More Related