1 / 20

Regional Transmission Network Development: Implications for Trade and Investment

Regional Transmission Network Development: Implications for Trade and Investment. Electricity Market and Regulatory Issues in the Black Sea Region and Southeast Europe

patsy
Download Presentation

Regional Transmission Network Development: Implications for Trade and Investment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Regional Transmission Network Development: Implications for Trade and Investment Electricity Market and Regulatory Issues in the Black Sea Region and Southeast Europe Kari Nyman, Lead Specialist, Energy and Infrastructure Department, Europe and Central Asia Region, The World Bank November 11-12, 2009

  2. Electricity Market and Regulatory Issues Workshop on Regional Transmission Network Development & Implications for Trade and Investment Istanbul, Nov 11-12, 2009 Kari Nyman Sustainable Development Dept Europe and Central Asia Region The World Bank

  3. Topics of this Presentation • Electricity Shortages threaten the Energy Community, including its Observer Countries • Effective Electricity Market Opening • Role of Transmission System Operators • Regional Day-Ahead Market (DAM) • Action Plan – Preparation and Implementation of a Regional DAM & Improvements to Bilateral Trading Practices • Summary of Market Development Actions

  4. The Energy Community (= Europe’s 8th Electricity Region) • Energy Community Contracting Parties (CPs) = Albania, Bosnia and Herzegovina, Croatia, FYROM, Kosovo, Montenegro, Serbia • Bulgaria and Romania have “graduated” and joined the European Union • Moldova and Ukraine expected to join (=become CPs) in 2010 • Turkey – negotiations underway • Georgia and Norway are the other current Observers

  5. World Bank Project on South East Europe (SEE) Wholesale Market Opening • ESMAP and PPIAF (two multi-donor trust funds) provide financing • WB contracted a consortium of Poyry Energy and Nord Pool Consulting • Draft Final Report is available – www.energy-community.org • Next Step: Action Plans to be agreed • Implementation, by the willing & others to follow – Energy Community’s current gradual progress expected to continue

  6. Electricity Shortages Threaten the Energy Community incl. Observers • Most countries (except Turkey from 2008) maintain low regulated tariffs • State utilities generally cover their low (historic) costs • Tariffs do not support new investment • Countries are opening their markets, but • National utilities dominate national markets, as generators or single-buyers from generators/traders • Eligible customers prefer to stay under their (artificially low) regulated tariffs • Effective opening and switching of suppliers is limited • Demand-supply balance continues to tighten -economic crisis provides only temporary “relief” as demand temporarily declines

  7. Electricity Shortages Threaten the Energy Community incl. Observers • Current situation is well-known to all • Energy Community Secretariat provides regular benchmarking reports to the Athens Forum, PHLG and Ministerial Council meetings • Conclusions of the 14th Athens Forum: • Contracting Parties to intensify their efforts… • Utmost importance of transparency… • WB project to help overcome market obstacles… • Effective electricity market opening – for private investment, for security of electricity supply, for economic growth and quality of life/social progress

  8. Effective Electricity Market Opening • Allow state utilities to sell to the market in addition to the regulated customers • Reduce volumes of tariff sales & allow volumes of market sales to increase - over time, gradually (see next slide) • Promotes effective market opening • Promotes internal cash generation by state utilities for their future investment and ability to survive in future market competition with private companies • Promotes energy efficiency when consumers increasingly have to pay the real price for electricity • Successfully done in Romania in 2001-2007, up to 50% market opening; and further progress expected from 2010

  9. Transition Period: Market and Regulated Prices Eligible Consumer and Supplier Estimated consumption in t0 MWh/h demand response Volume purchased at market price Volume purchased at regulated price from generator or supplier t1, t2 and t3 to be decided by Authorities t0 t1 t3 time t2

  10. Effective Electricity Market Opening • Open the market gradually • Social safety nets for the poor households • Each country can set the pace of opening/market sales, taking into account progress of social safety nets and overall economic conditions; but • Announce market opening plans for predictability & consult market participants about modifications • Require transparent contracting when state utilities buy and sell electricity • Auctions or other transparent processes advisable when state utilities award bilateral contracts • Good governance in the use of resulting revenues • Consider “Virtual Power Plants”

  11. Role of Transmission System Operators • TSOs – more than electricity transmission • More expected of TSO in liberalized and increasingly regional electricity markets: • Transmission service including interconnections; • Integration of renewable energy – SmartGrids; • Facilitation of electricity markets & market couplings; • Security of Supply - encompasses all of the above • TSOs should proactively assume leadership, not wait to be mandated by regulators • Unbundling from vertically integrated utilities • Operational and financial autonomy

  12. Regional Day-Ahead Market (DAM) • A regional market is the objective of the Treaty. Bilateral trading to continue - needs improvements. A regional Day-Ahead market (DAM) is proposed. • Countries to decide on the Approach/Options: • Centralized: regional power exchange/regional market operator of the regional market • Decentralized: national power exchanges and market operators in each country, with couplings of the national markets to form a regional market • Variations of the decentralized approach include (1) timing (step-by step country-by country over time or big-bang all countries in parallel) and (2) use of market services from OPCOM, SouthPool, etc. by national market operators instead of each developing its own systems.

  13. Regional Day-Ahead Market --Centralized Approach • Centralized regional approach - regional power exchange & regional market operator - is the “in-principle” ideal approach to developing a functioning regional market: • Cost-effective • Feasible – most SEE systems are too small for national markets? • Faster to implement & easier to coordinate and harmonize - compared to decentralized approaches • Easier for prospective private generation investors to understand • Regional cooperation and ownership - ideally TSOs would jointly establish and hold equal shares in the regional market operator.

  14. Regional Day-Ahead Market --Decentralized Approach • Immediate acceptability of a centralized regional approach & a regional market operator is not evident • “Mandatory” “Top-down” approach will not work - countries should decide (and implement) their preferred choice whether centralized or decentralized • If SEE countries prefer decentralized approaches, countries should implement a regional market through a decentralized approach.

  15. Regional Day-Ahead Market --One Possible Decentralized Scenario • Decentralized development can follow a number of routes, including the following scenario: • Bulgaria and Serbia develop their national markets • Bulgaria and/or Serbia couple their markets with the already functional Romanian market (OPCOM PX) • Romania and Hungary are working to couple their markets • Other SEE countries join the BG-HU-RO-SR market coupling (or couple with Austria or Greece), one by one over time, when confident about the effective functioning of the market coupling and after having developed capability and facilities to join the market coupling • Turkey and Ukraine are developing their national markets and could also join the BG-HU-RO-SR coupling

  16. Action Plan for Energy Community Contracting Parties – Preparation • Action Plan to be finalized, endorsed by PHLG and approved by the Ministerial Council in December 2009 • Proposed Next Steps: • PHLG to endorse and the Ministerial Council to direct ministries & TSOs and request regulators to prepare the Action Plan for approval in the December 2009 meeting • Regulators and TSOs to work country-by-country and coordinate regionally within ECRG/EWB and SETSO • Energy Community Secretariat, World Bank & Poyry – Nord Pool consultant team assistance is available • Political Will is key to progress and success • Regulatory Mandate to TSOs is also needed

  17. Action Plan for Energy Community Contracting Parties – Implementation • Target: Action Plan approved in December 2009 and implemented in 2010-2014 • Regulators to issue the implementation mandate to the TSOs - country-by-country (with regulatory coordination at ECRB/EWG) • TSOs to be responsible for implementation • Regulators to monitor TSOs’ progress • Athens Forum to get progress reports • PHLG and the Ministerial Council to receive progress reports and take decisions/corrective measures as needed – sustained political will is key to progress and success

  18. Action Plan - Improvements to Current Bilateral Trading Practices • In parallel to developing the regional Day-Ahead Market, countries should improve bilateral trading • Bilateral trading is active but has several well-known shortcomings: • Prices paid by importing countries are high - often much higher than available reference prices in the SEE region (e.g. OPCOM and Greek prices) • Trading is not transparent - information about available power for trading and about actual trades and prices not readily available, slow progress in market monitoring • Perception of a closed market - favored traders having preferential/exclusive access to electricity and cross-border transmission links

  19. Action Plan - Improvements to Current Bilateral Trading Practices • Coordinated Auction Office (CAO) for transparency about available cross-border capacity – time to move forward to implementation • Mandate public auction of bilateral contracts by state utilities instead of new negotiated deals with favored traders • Publish information about available power for trading and about actual trades and prices, to build confidence and trust and to attract new investors and traders These measures should be taken by all countries, also those that are not developing a DAM.

  20. Summary of Market Development Actions • Adjust regulated tariffs to provide for new investment by state utilities and private investors • Allow state utilities to sell to the market –through auction (avoid negotiated deals) • Improve bilateral trading through auctioning of contracts (and transmission), improve transparency through information and monitoring • Develop a regional day-ahead market, through market couplings, country-by-country • TSOs & Regulators Countries not willing/able to move ahead with day-ahead markets immediately should still develop action plans to take the first three measures!

More Related