MSD II Week 6 Update. P13265: Motorcycle Safety Lighting and Portable Electronics Charging System. Mike: Action Items Status. Lens Covers Incomplete Still waiting on shell Bike Wiring Harness/ Tx Box In Progress (almost complete) Test fit on bike, confirmed fit w/no permanent mods.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' MSD II Week 6 Update' - patricia-fitzpatrick


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
msd ii week 6 update

MSD II Week 6 Update

P13265: Motorcycle Safety Lighting and Portable Electronics Charging System

mike action items status
Mike: Action Items Status
  • Lens Covers
    • Incomplete
    • Still waiting on shell
  • Bike Wiring Harness/ Tx Box
    • In Progress (almost complete)
    • Test fit on bike, confirmed fit w/no permanent mods.
  • Wireless XBee Test
    • Complete
    • Captured waveforms from bike for all light sources
  • Assist Tyler with Shell
    • In Progress
mike next steps for week 7
Mike: Next Steps for Week 7
  • Finish board population w/TJ ~5 hrs
  • Edit/ complete Tech Report ~ 10 Hours
  • Assist Tyler with Shell~ 10 Hours
  • Begin lens covers? ~5 hrs
tyler action items status
Tyler: Action Items Status
  • Finish New Mold
    • In Progress
    • More, various setbacks, near completion
  • Shell Assembly
    • Incomplete:
    • Pending completion of new shell
  • Poster Work
    • Incomplete:
    • All time this week was dedicated to getting the mold done.
tyler next steps for week 7
Tyler: Next Steps for Week 7
  • Shell/Backpack Assembly ~ 15 Hours
  • Tech Paper ~ 4 Hours
  • Complete Assembly Plan ~ 4 Hours
    • Will be completed as backpack is assembled
  • Poster Work ~ 6 Hours
ben action items status
Ben: Action Items Status
  • Electronics box
    • Finished but must be narrowed before gluing
  • Quick Connect
    • Testing was performed this weekend, with the length of the male end confirmed (along with the mounting of the female end).
ben next steps for week 7
Ben: Next Steps for Week 7
  • Reduce box width- 5 hours
    • Must reduce the width of the top piece, bottom piece, both short sides, and redrill top in new corners
  • Install standoffs- ~2 hours
    • Placement of all standoffs must be precise
  • Tech paper
    • I will write my section for Friday
eric action item status
Eric: Action Item Status
  • MSP430 Development
    • Incomplete, In Progress, Complete:
    • Explain
  • Board Build and Testing
    • Incomplete, In Progress, Complete:
    • Explain
eric next steps for week 7
Eric: Next Steps for Week 7
  • NS #1 ~ # Hours
    • Explain
  • NS #2 ~ # Hours
    • Explain
  • NS #3 ~ # Hours
    • Explain
tj action items status
TJ: Action Items Status
  • Populate PCBs
    • In Progress:
    • Should have adapters today and will complete final rework Friday afternoon
  • Test XBee\'s in Lab and on Bike
    • In Progress:
    • Dev Kit issues resolved with current limiting resistors
    • Bike signals captures and will be replicated in lab
  • EDGE Update
    • In Progress
    • Site cleanup and more formatting additions
tj next steps for week 7
TJ: Next Steps for Week 7
  • Populate and Debug PCBs ~ 10 Hours
    • Finish all rework and go through Test Plan
  • XBee Lab Test ~ 2 Hours
    • Replicate motorcycle signals and ensure correct signal transmission
  • Assemble Tech Paper Rough Draft ~ 5 Hours
    • Put together segments and add additional information
killian action items status
Killian: Action Items Status
  • Refine Sketches
    • Complete
    • Sketches, done, scanned into photoshop and started to apply gradient. Initial linework for illustrator renderings has begun, need to group sections and start to apply color/gradients
  • Backpack Assembly
    • In progress
    • Cut out a bunch of the cross sections, getting control panel 3-D printed
  • Poster Layout
    • In progress
    • Discussed gameplan with Tyler and Mike
slide15
https://www.facebook.com/photo.php?v=10201084405291756&ref=notif&notif_t=video_taghttps://www.facebook.com/photo.php?v=10201084405291756&ref=notif&notif_t=video_tag
killian next steps for week 7
Killian: Next Steps for Week 7
  • Complete Photoshop and Illustrator Renderings ~ 6 Hours
    • Just need to finish applying everything and possibly do a few other sketches of inserting items (phone, laptop, tablet)
  • Assist with Assembly ~ 7 Hours
    • Help with shell shaping and vacuum forming, painting control panel
  • Draw up Outlines of Poster, begin inserting text and graphics ~ 3 Hours
    • Hope to have a pretty set layout by next week
major week 7 action items
Major Week 7 Action Items
  • Mike - Complete Tx Box
  • Tyler - Backpack Assembly
  • Ben - Finish Electronics box, quick connect
  • Eric -
  • TJ - Populate and Debug PCBs
  • Killian - Renderings and Assembly
lessons learned
Lessons Learned
  • Mike
  • Tyler
    • Make sure to double check other peoples work thoroughly if your work is dependent on theirs. It\'s not okay to assume the thought of every problem that could arise.
  • Ben
    • Double check offset calculations
lessons learned cont
Lessons Learned cont.
  • Eric
  • TJ
    • SMT population takes a long time and first revisions of boards often need to be reworked and modified for prototyping applications
  • Killian
    • You can print two items at once with 3-D printers, 3-D printing quality is very limited in the innovation center