THE I-75 DAYTON RECONSTRUCTION
This presentation is the property of its rightful owner.
Sponsored Links
1 / 14

THE I-75 DAYTON RECONSTRUCTION PowerPoint PPT Presentation


  • 158 Views
  • Uploaded on
  • Presentation posted in: General

THE I-75 DAYTON RECONSTRUCTION. I-75 RECONSTRUCTION. THREE MAJOR PROJECTS TO RECONSTRUCT I-75 BETWEEN SR 4 AND US 35 ADD 1 LANE EACH DIRECTION; REDUCE NB 90 DEGREE CURVE; REDUCE NO. OF RAMPS PHASE 1A SPRING 2007 – FALL 2009 PHASE 1B SPRING 2008 – FALL 2009

Download Presentation

THE I-75 DAYTON RECONSTRUCTION

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


The i 75 dayton reconstruction

THE I-75 DAYTON RECONSTRUCTION


I 75 reconstruction

I-75 RECONSTRUCTION

  • THREE MAJOR PROJECTS TO

    RECONSTRUCT I-75 BETWEEN SR 4

    AND US 35

  • ADD 1 LANE EACH DIRECTION;

    REDUCE NB 90 DEGREE CURVE;

    REDUCE NO. OF RAMPS

  • PHASE 1A SPRING 2007 – FALL 2009

  • PHASE 1B SPRING 2008 – FALL 2009

  • PHASE 2 SPRING 2011 – FALL 2013


The i 75 dayton reconstruction

SR 4

1A

I-75 IN DOWNTOWN

DAYTON

PHASES 1A, 1B, 2

2

1B

US 35


The i 75 dayton reconstruction

SYSTEM CONFIGURATION

  • 2 DYNAMIC MESSAGE SIGNS

  • 7 CCTV CAMERAS / VEHICLE

    DETECTION STATIONS

  • 4 HIGHWAY ADVISORY RADIOS

  • 2 CCTV INSTALLED ON ROOF OF

    MONTGOMERY COUNTY BUILDING


Features

FEATURES

  • MOST DEVICES INSTALLED ON

    TEMPORARY BASIS

  • WIRELESS COMMUNICATIONS FOR

    ALL DEVICES

  • ONLY DMS WILL BE PERMANENT

  • WEEKDAY/DAYTIME CONTROL FROM

    D7 OFFICE IN VANDALIA

  • NIGHTTIME/WEEKEND CONTROL

    FROM ARTIMIS


The i 75 dayton reconstruction

TRAFFIC

MANAGEMENT

CENTER


The i 75 dayton reconstruction

CCTV LOCATIONS


The i 75 dayton reconstruction

CAMERAS ON

ROOF OF THE

MONTGOMERY

COUNTY

BUILDING


The i 75 dayton reconstruction

DYNAMIC

MESSAGESIGNS


The i 75 dayton reconstruction

HAR LOCATIONS


The i 75 dayton reconstruction

TRAVEL TIME WILL BE ACQUIRED

FOR AN 8-MILE SECTION

ENCOMPASSING THE WORK ZONES OF ALL 3 CONSTRUCTION PHASES

CALCULATION BASED UPON EITHER LICENSE PLATE READERS OR CELLULAR PHONE TRACKING


The i 75 dayton reconstruction

OPPORTUNITIES TO LEVERAGE

INFRASTRUCTURE


The i 75 dayton reconstruction

  • IN SUMMARY:

  • EARLY DEPLOYMENT OF PORTION

  • OF REGIONAL FMS

  • MAINTENANCE OF TRAFFIC

  • LEVERAGE INFRASTRUCTURE

  • FROM PLANNED ROADWAY PROJECTS