1 / 9

WELCOME TO

WELCOME TO. RiCS Systems Pvt Ltd. Textile Inventory System. RICS INDIA RICS SYSTEMS INDIA PVT LTD.,. Project Goals. Inventory Control & Order Processing Integration with Accounting System Multi User, Currency, UoM And Warehouse Online Data Updating. Online Help. Description.

Download Presentation

WELCOME TO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WELCOME TO RiCS Systems Pvt Ltd

  2. Textile Inventory System RICS INDIA RICS SYSTEMS INDIA PVT LTD.,

  3. Project Goals • Inventory Control & Order Processing • Integration with Accounting System • Multi User, Currency, UoM And Warehouse • Online Data Updating. • Online Help

  4. Description • Exclusively designed to cater to the needs of the textile companies. • Computerized inventory system and stock management as never been easier. • Eliminates the task of manually recording the stock movement in stock cards. • Helps to track stock , identify the fast to slow moving items, known the availability of the stock and any other information pertaining to inventory. • Maintains the stock currency different from that of accounts.

  5. Competitive Analysis • Strengths • Built with maximum flexibility and contains lookup tables for real data • Weaknesses • It is not yet Observed

  6. Technology • Real time Integrated Technology • Standards being adopted • Costing methods • Automatic and manual numbering • UoM conversion • Data Security

  7. Team/Resources • State assumptions about resources allocated to this project • Excellent, energetic & enthusiastic Team developers and Analyst • Latest & Powerfull equipment adopted to control the system

  8. For further project details procedures shown Continue…

  9. Press ESCAPE key to Return or ENTER to Repeat

More Related