warrior leader course
Download
Skip this Video
Download Presentation
Warrior Leader Course

Loading in 2 Seconds...

play fullscreen
1 / 5

Warrior Leader Course - PowerPoint PPT Presentation


  • 289 Views
  • Uploaded on

Warrior Leader Course . In processing. Report in Summer PT\'s ready for height and weight @ 0530 inside BLDG 2730 (Rinehart Gym) with sponsor. Ensure to have your orders, pre-execution check list, and WLC packing list (Including TA-50) on hand.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Warrior Leader Course ' - ownah


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
warrior leader course

Warrior Leader Course

In processing

Report in Summer PT\'s ready for height and weight @ 0530 inside BLDG 2730 (Rinehart Gym) with sponsor.

Ensure to have your orders, pre-execution check list, and WLC packing list (Including TA-50) on hand.

Bring a pen, ID Card (CAC with Registered Certificates)

Have your 1SG and CSM phone # for your chain of command readily available.

NOTE: HT/WT, TA 50 inventory , and In processing will be conducted at Rinehart Gym.

slide2

1

N

Lay out –Line 1

STU #

Stage

Lay out –Line 2

ROOM #

2

Lay out –Line 3

POST SCH NCO

4

Lay out –Line 4

PROFILE/MED

Lay out –Line 5

ID CHECK

ROOM KEY

Lay out –Line 6

Alphabetical Line

Administrative

processing, H&W on stage

3. Baggage area

4. Lay Out area

Ruck, A-Bag holding area

3

time line
Time Line
  • 0500 SGL Report to Gym
  • 0530 Students arrive at Rinehart.
  • 0550 Students lined up alphabetically
  • 0600 Administrative data collected, issue rooms w/ key
  • 0700 Height & Weight
  • 0800 Chow /Inventory layout (sponsor)
  • 0900 Inspection of TA-50 (SGL)
  • 1000 Movement to 3669
supplies
Supplies
  • 8 Folding Chairs
  • 4 Folding Tables
  • 2 Scales
  • 4 tapes (H&W)
  • 12 Large Cones
  • Engineer tape, Scissors
  • Laptop x 4 w/ 5500/5501 program
  • Tape
  • Clip Boards x8
  • AED
  • Water
  • Cups
  • Guidon
  • Slat Board with In processing
  • Bull horn
manning
Manning
  • Stu # processing Tinawin
  • ID Card check/Key issue Golden
  • Profile /medical Screening Golden/Paulino
  • Height&Weight Screening
  • SimpsonZeigler
  • EarnestMcCoy
  • BF% Screening
  • TinawinGolden ALC/SLC Cadre
ad