Netc n7 status update to aim frb
Download
1 / 11

NETC N7 Status Update to AIM FRB - PowerPoint PPT Presentation


  • 157 Views
  • Uploaded on

NETC N7 Status Update to AIM FRB. 4 May 2010. Overview. NAVEDTRA 130B, 131B, 135C, 132 NAVEDTRA 136 (ILE) re-write status & effect on AIM/CPM AIM/CPM status support of JDTA w/ participating Center updates AIM/CPM status support of OCCSTD capture/validation

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' NETC N7 Status Update to AIM FRB' - oscar-cantu


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Overview
Overview

  • NAVEDTRA 130B, 131B, 135C, 132

  • NAVEDTRA 136 (ILE) re-write status & effect on AIM/CPM

  • AIM/CPM status support of JDTA w/ participating Center updates

  • AIM/CPM status support of OCCSTD capture/validation

  • NETC/OPNAV N15 integration of NETC domain/acquisition community business processes

  • AIM/CPM integration status w/ Perception

  • FEA/BCA capability plans for CPM

  • PPP Repository status



NAVEDTRA 136 (ILE) Re-write

  • Current re-write status

    • Leslie Lucas (team lead) distributed continuity draft of Plan through Design phases for working group review on 30 Apr

  • AIM/CPM impact

    • JDTA Tab - Rename “Skills Hierarchy” Report “Job Duty Task Analysis” Report

    • Project Tab - Rename “Performance Requirements” branch of Projects to “CTTL”

    • Project Tab – Rename “COI with ISD Considerations” report to IMDP

    • Projects Tab- Rename “ISD Considerations” link on C/M/L/S to “IMDP/Learning Strategy Elements”


AIM/CPM Support of JDTA and Participating Center Updates

  • CPM Rel 4.0 operational 27 Jan 10

  • JDTA NETCINST 1510.4 promulgated 24 Feb 10

  • Center projects:

    • CPPD/CSFE: Curriculum Developer with integrated AIM user training

    • CSFE

    • SLC

    • CEODD

    • CID


AIM/CPM Support of OCCSTD Capture/Validation

  • NETC N74 coordination with NAVMAC

  • CPM JDTA tab being adapted for OCCSTDS specific requirements

    • Capability to be part of CPM Rel 5.0

  • AIM team working with NAVMAC and NETPDTC on OCCSTDS data interface with Perception LAS for fleet validation of preliminary OCCSTDS


Integration of NETC Domain/Acquisition Community Business Processes

  • Roy Hoyt & Roger Thorstad to provide status


AIM Interface with Perception LAS Processes

  • Support for NETC N51 assessment program and NAVMAC OCCSTDS fleet validation process

  • Planning for implementation via Perception API

  • Participants:

    • NAVMAC and NETC N51 as SMEs

    • NETPDTC as Navy technical agent for Perception

    • AIM team on Web service data output from AIM I, AIM II, and LO Module


FEA/BCA Capability Plans for CPM Processes

  • FEA – NETCINST 1500.6

  • BCA – NETCINST 1510.3

  • Business processes still being defined and integrated into NAVEDTRA 136

  • AIM team involved in business process definition and initial design of CPM support for FEA/BCA downstream


PPP Repository Status Processes

  • AIM team coordinating with NETC N74 (Leslie Desenburg) on options to post PPP repository contents (AIM and other) for easy viewing


Questions? Processes


ad