DataHub Migreringsgruppe

Loading in 2 Seconds...

play fullscreen
1 / 15

DataHub Migreringsgruppe - PowerPoint PPT Presentation


  • 105 Views
  • Uploaded on

DataHub Migreringsgruppe. Erritsø 29. februar 2012 kl. 10.00. Dagsorden - kl . 10.00 – 14.00. Godkendelse af referat fra 16. november 2011 Orientering om DataHub projektet siden sidst Status for migreringsproces Milepæl 15. februar 2012 Supporterfaringer fra Energinet.dk

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' DataHub Migreringsgruppe' - ormand


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
datahub migreringsgruppe

DataHub Migreringsgruppe

Erritsø

29. februar 2012 kl. 10.00

dagsorden kl 10 00 14 00
Dagsorden - kl. 10.00 – 14.00
  • Godkendelse af referat fra 16. november 2011
  • Orientering om DataHub projektet siden sidst
  • Status for migreringsproces
    • Milepæl 15. februar 2012
    • Supporterfaringer fra Energinet.dk
    • Erfaringer fra gruppens deltagere
  • Status for migreringssystem
    • Driftserfaring
    • Kendte fejl, planlagte rettelser
  • Notat: "Håndtering af nettoafregnere"
    • Gennemgang og kommentarer til notat
  • Notat: "Migreringsstrategi 2012-01-10"
    • Input til rettelser/tilføjelser:
      • Offentliggør migreringsstatus (aht. elleverandører)
      • Håndtering ved fusion af netområder i migreringsfasen
      • Håndtering af balanceafregning ved cut-over
      • Detaljeret cut-over plan
  • Action liste
  • Eventuelt
slide3

Okt Nov Dec

Jan Feb Mar Apr Maj Jun Jul Aug Sep Okt

DataHub End-to-End

DataHub Drift

Ellev.

Net

Net

Net

Ellev.

Konf

It-lev.

Testmigrering

Driftsmigrering

Flyt

1.-14. sept 2012

21.nov

It-leverandører

tester

1.april 2012

1.-7. juni 2012

DataHub

nulstilles

Migrerings-

system

Migreringssystem

nulstilles

DataHub

system

2012

2011

1.jan 2012

Start testmigrering

15. nov. 2011

Konfigurering

Brugeroprettelse

15.-30. sept 2012

Migrerings-

system

Migrerings-

system

DataHub

system

Migrerings-

system

2011-11-15

ENDK:

Konfig. ok

2012-01-01

It-lev:

Test ok

2012-02-15

Net:

Indlæst filer

med succes

2012-03-26

2012-03-15

Net:

40% stamdata

25% måledata

Ellev.:

dannet rapport

til kontrol

2012-05-01

2012-06-01

Net:

90% stamdata

50% måledata

2012-08-01

Net:

95% stamdata

90% måledata

2012-07-01

Ellev.:

kontrolleret

egne MP

2012-10-01

Go-Live

Net:

80% stamdata

50% måledata

Tidsplan for migrering – 2011-11-15

Pilot-

Aktørtest

Aktørtest

slide4

OktNovDec

Jan Feb Mar Apr Maj Jun Jul AugSepOkt

DataHub Drift

DataHub End-to-End

Ellev.

Net

Net

Net

Ellev.

Konf

It-lev.

Testmigrering

Driftsmigrering

Flyt

1.-14. sept 2012

21.nov

It-leverandører

tester

1.april 2012

1.-7. juni 2012

DataHub

nulstilles

Migrerings-

system

Migreringssystem

nulstilles

DataHub

system

2012

2011

10.jan 2012

Start testmigrering

15. nov. 2011

Konfigurering

Brugeroprettelse

15.-30. sept 2012

Migrerings-

system

Migrerings-

system

DataHub

system

Migrerings-

system

2011-11-15

ENDK:

Konfig. ok

2012-01-01

It-lev:

Test ok

2012-02-15

Net:

Indlæst filer

med succes

2012-03-26

2012-03-15

Net:

40% stamdata

25% måledata

Ellev.:

dannet rapport

til kontrol

2012-05-01

2012-06-01

Net:

90% stamdata

50% måledata

2012-08-01

Net:

95% stamdata

90% måledata

2012-07-01

Ellev.:

kontrolleret

egne MP

2012-10-01

Go-Live

Net:

80% stamdata

50% måledata

Tidsplan for migrering – 2012-02-29

Aktørtest

Pilot

3 status for migreringsproces
3. Status for migreringsproces

Milepæl 15. februar 2012:

3 status for migreringsproces1
3. Status for migreringsproces

Supporterfaringer fra Energinet.dk:

Generelle indtryk:

  • Få henvendelser ift. aktiviteten på systemet
  • En del henvendelser pga. usikkerhed omkring brugen af systemet

Erfaringer fra gruppens deltagere!

4 status for migreringssystem
4. Status for migreringssystem
  • Driftserfaring – set fra Energinet.dk
    • Forudsætning: Ingen support krav for systemet!
    • Nogenlunde stabil drift – få ”udfald”
6 notat migreringsstrategi 2012 01 10
6. Notat: "Migreringsstrategi 2012-01-10"

Input til rettelser/tilføjelser:

  • Offentliggør migreringsstatus (aht. elleverandører)
  • Håndtering ved fusion af netområder i migreringsfasen
  • Håndtering af balanceafregning ved cut-over
  • Detaljeret cut-over plan
offentligg r migreringsstatus aht elleverand rer
Offentliggør migreringsstatus (aht. elleverandører)

Forslag til regneark på hjemmesiden –

ajourføres ugentligt (?) på basis af indrapportering fra netvirksomheder

slide15

8. Eventuelt

Næste møde ??