CSC Hardware Alignment. James N. Bellinger University of Wisconsin at Madison. Muon Alignment Project Status. Gervasio Gomez and James Pivarski are co-conveners Current priority of group is to understand apparent conflict between hardware and tracking estimates of DT

Download Presentation

CSC Hardware Alignment

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


James N. Bellinger 26 September 2014

CSC Hardware Alignment

James N. Bellinger

University of Wisconsin at Madison


James N. Bellinger 26 September 2014

Muon Alignment Project Status

  • Gervasio Gomez and James Pivarski are co-conveners

    • Current priority of group is to understand apparent conflict between hardware and tracking estimates of DT

  • Experts are reviewing a proposed set of CSC chamber positions

    • X/Y from laser alignment, endpoints based on disk survey

    • Z based on disk survey

      • Some inconsistencies in the Z-sensor array

    • RotX based on laser alignment (chamber tilt from disk bulge)

    • No handle on RotY

    • RotZ based on disk survey


James N. Bellinger 4 July 2010

Projects for CSC

  • Transfer line validation

    • Apparent disagreement w/ Barrel MAB positions

  • Z-sensor validation

    • Apparent disagreement w/ Link MAB Z positions

  • Step through procedure to automate coordination of fitting data from 7-June

    • Target end of July for first pass

    • Unlikely to get enough tracks for tracking tests by then