Csc hardware alignment
This presentation is the property of its rightful owner.
Sponsored Links
1 / 3

CSC Hardware Alignment PowerPoint PPT Presentation


  • 61 Views
  • Uploaded on
  • Presentation posted in: General

CSC Hardware Alignment. James N. Bellinger University of Wisconsin at Madison. Muon Alignment Project Status. Gervasio Gomez and James Pivarski are co-conveners Current priority of group is to understand apparent conflict between hardware and tracking estimates of DT

Download Presentation

CSC Hardware Alignment

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Csc hardware alignment

James N. Bellinger 26 September 2014

CSC Hardware Alignment

James N. Bellinger

University of Wisconsin at Madison


Muon alignment project status

James N. Bellinger 26 September 2014

Muon Alignment Project Status

  • Gervasio Gomez and James Pivarski are co-conveners

    • Current priority of group is to understand apparent conflict between hardware and tracking estimates of DT

  • Experts are reviewing a proposed set of CSC chamber positions

    • X/Y from laser alignment, endpoints based on disk survey

    • Z based on disk survey

      • Some inconsistencies in the Z-sensor array

    • RotX based on laser alignment (chamber tilt from disk bulge)

    • No handle on RotY

    • RotZ based on disk survey


Projects for csc

James N. Bellinger 4 July 2010

Projects for CSC

  • Transfer line validation

    • Apparent disagreement w/ Barrel MAB positions

  • Z-sensor validation

    • Apparent disagreement w/ Link MAB Z positions

  • Step through procedure to automate coordination of fitting data from 7-June

    • Target end of July for first pass

    • Unlikely to get enough tracks for tracking tests by then


  • Login