1 / 5

NCEP Production Suite

NCEP Production Suite. Production Suite 425 codes – 11 utilizing message passing 2.1 million lines of code & script Major Model Runs Rapid Update Cycle – 40 Km/40 Lvl (Hourly) Eta Model – 22 Km/ 50 Lvl (4 times daily – 60 hrs) NGM (twice daily)

ora
Download Presentation

NCEP Production Suite

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NCEP Production Suite • Production Suite • 425 codes – 11 utilizing message passing • 2.1 million lines of code & script • Major Model Runs • Rapid Update Cycle – 40 Km/40 Lvl (Hourly) • Eta Model – 22 Km/ 50 Lvl (4 times daily – 60 hrs) • NGM (twice daily) • Aviation Run – T170 (4 times daily – on-time 120hrs, off-time 84 hrs) • Medium Range Forecast (Once per day – 16 days) • Global Ensembles (12 members twice daily, T62) • Global Data Assimilation (4 times daily) • Hurricane (on demand – 4 storms, 4 times daily)

  2. 2000 Highlights • Eta Model • 22 km/40 lvl – September • On-time extended to 60 hrs • Off-time 48 hrs • Global Model • T170/48 lvl – January • On–time extended to 126 hrs • Off-time 84 hrs • GFDL Hurricane Model • Forecast extended to 120 hr - June • Up to 4 storms, 4 times daily

  3. 2000 HighlightsContinued • Wave Model • Global NWW3 replaced WAM – March • Regional model covering NW Atlantic – March Regional model coving Gulf of Alaska – March • NGM • Frozen in Time • Running from the Eta Analysis • No plans to remove in near future • Global Ensembles • T62  T126 from 0-60 hrs - July

  4. Planned Implementations • Eta Model • Extend runs to 84 hrs – January • Available on NCEP ftp server until NCF can evaluate resource requirements • Assimilate Precip, Upgrade land-surface model – April • FOUS to 60 hrs – May • Nested “Threats runs” – June • Available on NCEP ftp server • 12 km/60 lvl – November • RUC • 20 km/50 lvl – July

  5. Planned ImplementationsContinued • Regional Ensembles • May • Available on NCEP ftp server • Global Model • Prognostic Cloud Water, Convective Scheme, Tropical Storm relocation package – June • Ensembles • Extend high resolution (T126) from 60 to 84 hrs – January

More Related