Jwaneng
Download
1 / 7

Jwaneng Mine SAFETY PERFORMANCE 2011 - PowerPoint PPT Presentation


  • 117 Views
  • Uploaded on

Jwaneng Mine SAFETY PERFORMANCE 2011. SAFETY PERFORMANCE: 2001 – 2011 YTD. SAFETY PERFORMANCE 2011 YTD. 2011 Near hits elevated by Near Hit reporting initiative and Cut 8 submission of Hazard elimination cards. LTIFR COMPARISON – 2010 & 2011.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Jwaneng Mine SAFETY PERFORMANCE 2011' - oprah-bass


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Jwaneng Mine

SAFETY PERFORMANCE 2011



SAFETY PERFORMANCE 2011 YTD

2011 Near hits elevated by Near Hit reporting initiative and Cut 8 submission of Hazard elimination cards.


LTIFR COMPARISON – 2010 & 2011

LTIFR 2011- 0.08 stretch achieved; LTIFR 2010 - 0.29


LTIFR = Lost Time Injury Frequency Rate (includes LTI’s only; no longer includes fatalities)

CIFR = Classified Injury Frequency Rate (Fatality + LTI + RWI)

TRIFR = Total recordable Injury Frequency Rate (Fatality + LTI + RWI + MTI)- Splitting the NLTI this year from Jan, hence the graph started reading from Jan

AIFR = All Injury Frequency Rate (Fatality + LTI + RWI + MTI + FAI)


Management plans near hits

Jwaneng mine officially launched the only; no longer includes fatalities)Near Hit reporting system on the 26th Oct, 2011.

A database has been developed for capturing Near Hits

A significant number of employees have been trained on Near Hit reporting, data capturing and given access to the database

Management Plans-Near Hits


Management plans

Operational only; no longer includes fatalities)control: Developed contractor SHE file which is based on the OHSAS 18001 requirements. This file has been discussed with the contractors. We will pilot the file for the next two months and implementation is planned to commence in January 2012.

Visible Felt Leadership (VFL) is planned to be led by Excowith line management. Union members to be included as part of the process starting in November 2011.

FRCG: Implementation gap assessment was conducted by a consultant. This will contribute to the scope of work to be conducted to meet full compliance by end of 2012.

Management Plans


ad