1 / 78

OCP-IP Governing Steering Committee Meeting San Jose, California 7 October, 2003

OCP-IP Governing Steering Committee Meeting San Jose, California 7 October, 2003.

oona
Download Presentation

OCP-IP Governing Steering Committee Meeting San Jose, California 7 October, 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OCP-IPGoverning Steering Committee MeetingSan Jose, California7 October, 2003 OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  2. 8:00-9:00 AM: Breakfast Available 9:00-9:10 AM: Introductions / Agenda Review (Ian) 9:10-9:15 AM: Next GSC Meeting (Ian) 9:15-9:25 AM: 2003 Goals Revisited (Ian) 9:25-9:40 AM: Budget Revisited (Reen) 9:40-10:00 AM: Technical Vision WG Summary (Drew)10:00-10:15 AM: Break10:15-10:35 AM: Specification WG Status (Drew)10:35-10:55 AM: System-Level Design WG Status (Anssi)10:55-11:15 AM: Functional Verification WG Status (Franck for Marquette)11:15-11:25 AM: Foundation Document Updates (Ian) 11:25-11:30 AM: VSIA Update (Ian) 11:45-1:00 PM: Lunch 1:00-2:00 PM: AI Review (Ian) 2:00-2:10 PM: PR Update (Joe) 2:10-2:20 PM: Short-Term Recruiting (Joe) 2:20-2:40 PM: Administrative Update (VTM) 2:40-2:45 PM: Collateral Review (VTM) 3:30 PM: Close OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  3. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  4. Introductions / Agenda Review (Ian) • Welcome from the President • Introductions • Review of agenda OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  5. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  6. Next GSC Meeting (Ian) • 11th GSC meeting date to be decided • January 2004 on East Coast? • Other proposed dates and locations? OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  7. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  8. 2003 Goals Revisited (Ian) • Over 70 members ASAP, and rethink? • 68 now plus six in re-recruit (hold goal as is) • Revisit goal based on VSIA and/or Toshiba engagements • Five major corporation memberships (like ST, Cadence,Synopsys, Alcatel, Intel and Philips) • Great work / ST, Cadence, Synopsys, Alcatel and Philipsare in / Intel very iffy • Toshiba and Thomson have emerged as potential GSC candidates • One major Japanese corporation membership • Toshiba moving steadily toward GSC membership • More than 12 meaningful press releases • 18 issued to date OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  9. 2003 Goals Revisited cont. (Ian) • Five articles (including three that are adoption-centric) • Four done; one pending printing; six concepts pending • Three conference presentations that heavily promote OCP • Four done; Grenoble confirmed; no others pending • Eight University Program members • Great work / nine done; one pending • General interest very difficult to convert to specific membership • Six trade show attendances • Will execute seven this year; added Microprocessor Forum • Eight EDA vendors actively supporting OCP tools • Ten currently listed in EDA Products Library OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  10. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  11. 2003 Closure Review (Reen) • Year-end account balance discrepancy from approved budget • Flextronics (-$50K) • Broadcom (-$10K) – dragging feet • Esterel (-$10K) – dragging feet • Qualis (-$10K) – business sold • QThink (-$10K) – reorganization affecting renewal • TranSwitch (-$10K) – business in chaos; little SoC work • Toshiba ($100K) – could be pending influx before end of year? • Not included in expected receipts • Potential PAID / new memberships from VSIA TBD OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  12. 2004 Budget – Guidance Only (Reen) • This 2004 budget preview is for guidance, not approval • Additional up-side: no new membership allocated for 2004 • Hopefully a significant underestimation! • If Toshiba’s in by end of this year, still a similar cash trough as 2003 • Synopsys and Cadence increase to $25K each, plus small Sponsor Members need to contribute or payfull fees • Too early to lock into these numbers • Approve on regular January budget cycle OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  13. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  14. Technical Vision WG Summary (Drew) • Summary from Drew OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  15. Break OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  16. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  17. Specification WG Status (Drew) • Goals: • Enhance the OCP Specification with key additions to address immediate commercial need • Produce a roadmap for future enhancements to address future technical need OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  18. OCP v2.0 Status (Drew) • Fully released!!!! • Thanks to WG members, especially Franck, Anssi, Wolf • Thanks to John Robiola (Sonics Tech Writer) • Tracking errata (ongoing) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  19. Specification Enhancements (Drew) • Little/no work to date • Pending items: • Memory semantics • Fences/Barriers • Tagging (lighter weight threads) – MIPS • Cache-related signaling –MIPS • Cache coherence – MIPS • Layering • Improve operability by describing specific use of in-band and side-band extension signals • Basic naming capability inserted as part of v2.0 • Profiles • Interesting combinations of OCP features – reduce startup cost – Nokia, Philips OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  20. Specification Enhancements cont. (Drew) • Joint work: • Performance parameters (with FV WG) • Improved compliance (with FV WG) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  21. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  22. System-Level Design WG Status (Anssi) • Defined OCP 2.0 API for TL1 and TL2 • Q3 and Q4 releases combined in Q4 release • Contains OCP 2.0 channel, updated layer adaptersand new API • Pre-release in October to lead customer • Re-focus for more robust quality and better customer support • Removed parser; included parser specification for EDA vendors instead • Removed verification support; use Sonics’ internalregression suite instead • Continue OSCI follow up OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  23. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  24. Functional Verification WG Status (Franck) • Contributions • Status updated bi-weekly • Schedules submitted by contributors • Status • TNI-Valiosys – text description of OCP 2.0 assertions • Second rev of submitted to WG for review • YogiTech – OCP slave protocol checker • Schedule for contribution proposed • Replacement engineering in ramp up • Beach – XML description of OCP • Discussion/definition phase with select WG members OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  25. Functional Verification WG Status (Franck) • Proposed Contributions • NoBug – executable assertions with PSL • clarification of most constructive handling based upon existing sponsor member sensitivities still in progress • Selection of TI IP peripheral for test case to be done OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  26. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  27. Foundation Document Updates (Ian) • ST – small number / very workable tweaks • Accent – inconsequential modifications • Internal recruiting practices alignment • We requested your legal departments approve these “three” modifications • Nokia provided feedback on September 10th • Sonics and Flextronics approved OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  28. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  29. VSIA Update (Ian) • Press release issued October 6, 2003 • Results of interview featured in EE Times on October 6, 2003 (Ron Wilson) • Operational interfaces relatively straightforward • VTM working directly with VSIA providers • OCP-IP Web site live with VSIA updates on October 6, 2003 • New MA, FAQ, “motivating” Benefits listing, etc. OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  30. VSIA Update cont. (Ian) • Original approach to OCP-IP made 9/20/02 • Agreement execution took 18 months • Solicitation to implementation OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  31. Lunch OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  32. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  33. Action Item Review (Ian) • See handout – OCP-IP GSC Action Items OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  34. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  35. Press Releases (Joe) • New Member Announcements (6) • 6 October, 2003: VSIA and OCP-IP Form Strategic Alliance • 22 September, 2003: OCP-IP and Si2 Announce Collaboration • 8 September, 2003: eInfochips Joins OCP-IP • 4 September, 2003: Imagination Technologies Joins OCP-IP • 2 September, 2003: CoWare Joins OCP-IP • 25 August, 2003: STMicroelectronics, Inc.Joins OCP-IP OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  36. Press Releases cont. (Joe) • Other Announcements (4) • 6 October, 2003: VSIA and OCP-IP Form Strategic Alliance • 22 September, 2003: OCP-IP and Si2 Announce Collaboration • 18 August, 2003: Prosilog and OCP-IP Announce a Family of OCP Compliant AMBA and CoreConnect Bridges • 18 August, 2003: Chip Design Magazine Receives Industry Support from EDA Consortium, FSA,OCP-IP, Si2 and VSIA OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  37. Press Releases cont. (Joe) • Future Announcements • Cadence membership • OCP-supported IP and EDA Products Library /on-time delivery of OCP 2.0 specification • On-time delivery of SystemC models upgrade toOCP 2.0 / beta CoreCreator availability • Other significant member releases as signed OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  38. Articles and Papers (Joe) • OCP-IP / VSIA collaboration – EE Times • Stone axes, soldering guns, and SoCs – EEdesign • Open Standards Are Good for the Wireless Industry – Wireless Systems Design e-Newsletter • 'Plug and Play' Chip Group Adds to Membership – SiliconValley.internet.com • STMicro Joins Open Protocol International Partnership – Electronic News • STMicro Joins OCP-IP – EDA Alert e-Newsletter • Note: We have received some 30 other press mentions not listed above OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  39. Articles and Papers cont. (Joe) • Pending articles • Viewpoint on Open Industry Standards • Open Standards Are Good for the Wireless Industry(print edition) • 3rdeye Technology • Real World Project Application of OCP (by nVidia employee, Adam Levinthal) • University of British Columbia on importance of NoCs • Other potential opportunities • Detailed summary of VSIA collaboration • CoWare • More output from MIPS OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  40. Upcoming Events and Trade Shows (VTM) • FSA Suppliers Expo 2003 • October 9, 2003, San Jose, California • Exhibit booth / one-day event • Microprocessor Forum 2003 • October 14, 2003, San Jose Fairmont Hotel, California • Tabletop exhibit / one-evening event • IP Based SoC Design Workshop 2003 • November 13-14, 2003, Grenoble, France • Exhibit booth / two-day event • OCP 2.0 paper accepted OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  41. Other Activities (Joe) • Webcasts • TechOnLine Roundtable scheduled forNovember 7, 2003 • Newsletter • October 2003 issue now available • Presentations • OCP 2.0 presentation accepted – IP Based SoC Design Workshop (Grenoble, November 2003) • eInfochips presentation acceptance pending –DATE (Paris, February 2004) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  42. Promotion is Key in 2003 (Joe) • Reach more people • Inflate image • Shift to industry leadership role • Drive adoption OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  43. Introductions / Agenda Review (Ian) • Next GSC Meeting (Ian) • 2003 Goals Revisited (Ian) • Budget Revisited (Ian) • Technical Vision WG Summary (Drew) • Specification WG Status (Drew) • System-Level Design WG Status (Anssi) • Functional Verification WG Status (Franck for Marquette) • Foundation Document Updates (Ian) • VSIA Update (Ian) • AI Review (Ian) • PR Update (Joe) • Short-Term Recruiting (Joe) • Administrative Update (VTM) • Collateral Review (VTM) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  44. Short-Term Recruiting (Joe) • Focus on hot list • List of companies with compelling reasons to join • Daily action plan based on Hot List set with Ian OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  45. Results (Joe) • New members since July 22, 2003 GSC meeting: • Micronas • Si2 • VSI Alliance • Yamaha Corporation • Recruiting remains difficult – short pipeline of likely recruits • Re-recruiting activities growing OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  46. 0-In 3 DSP Agere ARC Arteris Atrenta Boston University Broadcom Chartered Semiconductor Dongbu Electronics Duolog Esterel Technologies Europractice Faraday Technology Fujitsu Hewlett-Packard Hitachi-IT Hughes ICERA ICU / Korean University Infineon Intel “Hot List” Recruiting: Pending Companies OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  47. Intrinsix IPROS Corp iStor Jasper Design JVC LDIC LG Manchester University Matsushita National Chiao Tung University NEC Obsidian Software Parthus / DSPG Programmable Silicon Solutions (PSS) QThink QUALCOMM Renesas Samsung Sarnoff Sci-worx “Hot List” Recruiting: Pending Companies (Page 2) OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  48. SDV Sharp (Japan) Silicon Interfaces Siligence San Jose State University Socware / Acreo Institute Sony Southampton Spiratech SuperH Synplicity “Hot List” Recruiting: Pending Companies (Page 3) • Tektronix • Tensilica • Thomson • Toshiba • TranSwitch • TSMC • UMC • Verifica • Virage • Xilinx • Zoran OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  49. “Hot List” Recruiting: Observations (Joe) • Multiple touches per contact • Daily harassment • CEO sell is best • Custom sales • There has been a shift in the perception ofOCP-IP to a highly sought after industry leader with both media and members alike • Getting tougher every day – without VSIA, Toshiba or promotional pull, baggage of existing membership slows growth in 2003 OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

  50. 2003 Recruiting Goal (Joe) • 70 members as soon as possible • Current members: • 6 GSC members • 63 other members signed • 69 total members OCP-IP CONFIDENTIAL – NOT TO BE DUPLICATED

More Related